Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land At Grid Ref 311051 194899 South Of Mafon Road Ty Du Nelson
Last published check: 9 Oct 2026, 15:53. Check the council record for more recent changes.
Land At Grid Ref 311051 194899 South Of Mafon Road Ty Du Nelson
This record has no verified map location.
View council mapConstruct Phase 1 Infrastructure Works associated with Outline Planning Consent 16/0373/OUT - reserved matters application regarding access, diversion of haul route, drainage, public open space and landscaping
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| DECISIONDecision · PDF | 20 Dec 2017 | View |
| LETTER TO ACCOMPANY DECISIONDecision · PDF | 20 Dec 2017 | View |
| DELEGATED REPORTReport · PDF | 20 Dec 2017 | View |
| COVERING LETTER - AMENDMENTSCorrespondence · PDF | 3 Nov 2017 | View |
| APPLICATION FORMApplication Form · PDF | 3 Nov 2017 | View |
| VARIOUS DRAWINGS FROM WESTERN POWER DISTRIBUTIONDrawing · PDF | 3 Nov 2017 | View |
| DAWINGS FROM WALES AND WEST UTILITIESDrawing · PDF | 3 Nov 2017 | View |
| OUTLINE CONSTRUCTION ENVIRONMENT MANAGEMENT PLANReport · PDF | 3 Nov 2017 | View |
| COVERING LETTER DATED 28.07.17Correspondence · PDF | 3 Nov 2017 | View |
| BAT TREE ROOST ASSESSMENT REPORTReport · PDF | 3 Nov 2017 | View |
| PROPOSED LIGHTING LEVELS 1 OF 4Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED LIGHTING LEVELS 2 OF 4Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED LIGHTING LEVELS 3 OF 4Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED LIGHTING LEVELS 4 OF 4Drawing · PDF | 3 Nov 2017 | View |
| MICRODRAINAGE CALCULATION R1Report · PDF | 3 Nov 2017 | View |
| DRAWINGS FROM DWR CYMRU/WELSH WATERDrawing · PDF | 3 Nov 2017 | View |
| DRAWING REGISTER 171102Correspondence · PDF | 3 Nov 2017 | View |
| BT OPENREACHDrawing · PDF | 3 Nov 2017 | View |
| SIEMENS MOBILITY TRAFFIC SOLUTIONSReport · PDF | 3 Nov 2017 | View |
| SCHEMATIC AND ASSESSMENT CIRCUITReport · PDF | 3 Nov 2017 | View |
| DETAILED TRAFFIC SIGNAL DESIGNDrawing · PDF | 3 Nov 2017 | View |
| MEMO CONDITION 19Correspondence · PDF | 3 Nov 2017 | View |
| TRAFFIC SIGNAL ELECTRICAL INSTALLATION CERTIFICATECorrespondence · PDF | 3 Nov 2017 | View |
| EXISTING UTILITIES (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED UTILITIES (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED UTILITIES (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED UTILITIES (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ACCOMMODATION WORKS QUARRY ACCESS ROAD (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| PROPOSED UTILITIES (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| WORKS TO EXISTING UTILITIESDrawing · PDF | 3 Nov 2017 | View |
| EXISTING UTILITIES (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ACCOMMODATION WORKS QUARRY ACCESS ROAD LANDSCAPE (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| ACCOMMODATION WORKS QUARRY ACCESS ROAD LANDSCAPE (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| ACCOMMODATION WORKS QUARRY ACCESS ROAD (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| ACCOMMODATION WORKS QUARRY ACCESS ROAD CONSTRUCTION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| KERBS, FOOTWAYS AND PAVED AREAS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| KERBS, FOOTWAYS AND PAVED AREAS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| KERBS, FOOTWAYS AND PAVED AREAS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| KERBS AND FOOTWAYS STANDARD DETAILSDrawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CONTOURS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CONTOURS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CONTOURS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CONTOURS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CONTOURS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CONTOURS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY LONG SECTIONS (1 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| LONGITUDINAL SECTIONS (1 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY LONG SECTIONS (2 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| LONGITUDINAL SECTIONS (2 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY LONG SECTIONS (3 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| LONGITUDINAL SECTIONS (3 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY LONG SECTIONS (4 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| LONGITUDINAL SECTIONS (4 OF 4)Drawing · PDF | 3 Nov 2017 | View |
| TRAFFIC SIGNS AND ROAD SURFACE MARKINGS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| TRAFFIC SIGNS AND ROAD SURFACE MARKINGS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| TRAFFIC SIGNS AND ROAD SURFACE MARKINGS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| TOUCAN CROSSING, TRAFFIC SIGNS AND ROAD SURFACE MARKINGSDrawing · PDF | 3 Nov 2017 | View |
| TRAFFIC SIGNS SCHEDULE 1 OF 2Drawing · PDF | 3 Nov 2017 | View |
| TRAFFIC SIGNS SCHEDULE 2 OF 2Drawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 3 Nov 2017 | View |
| SOFT LANDSCAPE PROPOSALS POND PLANTING DETAILDrawing · PDF | 3 Nov 2017 | View |
| PLAN ON COMMERCIAL AREA RE-GRADINGDrawing · PDF | 3 Nov 2017 | View |
| PLAN ON COMMERCIAL AREA RE-GRADINGDrawing · PDF | 3 Nov 2017 | View |
| COMMERCIAL AREA CROSS SECTIONSDrawing · PDF | 3 Nov 2017 | View |
| COMMERCIAL AREA CROSS SECTIONSDrawing · PDF | 3 Nov 2017 | View |
| HIGHWAYS EARTHWORKS REQUIREMENTS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAYS EARTHWORKS REQUIREMENTS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAYS EARTHWORKS REQUIREMENTS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| BOREHOLE DECOMMISSIONING STANDARD DETAILSDrawing · PDF | 3 Nov 2017 | View |
| EARTHWORKS TYPICAL DETAILSDrawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS STANDARD DETAILSDrawing · PDF | 3 Nov 2017 | View |
| ROAD PAVEMENTS STANDARD DETAILSDrawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CROSS SECTIONS ROAD 1 (1 OF 6)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CROSS SECTIONS ROAD 1 (2 OF 6)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CROSS SECTIONS ROAD 1 (3 OF 6)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CROSS SECTIONS ROAD 1 (4 OF 6)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CROSS SECTIONS ROAD 1-3 (5 OF 6)Drawing · PDF | 3 Nov 2017 | View |
| HIGHWAY CROSS SECTIONS ROAD 1-4 (6 OF 6)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| GENERAL ARRANGEMENT (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| PHASING AND ACCESS PLANDrawing · PDF | 3 Nov 2017 | View |
| PUBLIC RIGHT OF WAY TEMPORARY CLOSURE AND PERMANENT DIVERSIONDrawing · PDF | 3 Nov 2017 | View |
| PUBLIC RIGHT OF WAY TEMPORARY CLOSURE AND PERMANENT DIVERSIONDrawing · PDF | 3 Nov 2017 | View |
| PUBLIC RIGHT OF WAY TEMPORARY CLOSURE AND PERMANENT DIVERSIONDrawing · PDF | 3 Nov 2017 | View |
| RESERVED MATTERS APPLICATION BOUNDARYDrawing · PDF | 3 Nov 2017 | View |
| RESERVED MATTERS APPLICATION BOUNDARYDrawing · PDF | 3 Nov 2017 | View |
| AREA FOR SITE COMPOUNDDrawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (1 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (2 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (3 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (4 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| PUBLIC RIGHT OF WAY DIVERSION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| PUBLIC RIGHT OF WAY DIVERSION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (6 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (7 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| SWEPT PATH ANALYSIS (8 OF 8)Drawing · PDF | 3 Nov 2017 | View |
| DRAFT LIGHTING LEVELS AND ENVIRONMENTAL MITIGATION MEASURESDrawing · PDF | 3 Nov 2017 | View |
| STREET LIGHTINGDrawing · PDF | 3 Nov 2017 | View |
| STREET LIGHTINGDrawing · PDF | 3 Nov 2017 | View |
| SITE CLEARNACE (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| SITE CLEARNACE (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| SITE CLEARANCE (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| TREE AND HEDGEROW ADVANCED SITE CLEARANCE (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| TREE AND HEDGEROW ADVANCED SITE CLEARANCE (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| TREE AND HEDGEROW ADVANCED SITE CLEARANCE (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| EXTENTS OF INVASIVE SPECIES (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| EXTENTS OF INVASIVE SPECIES (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| EXTENTS OF INVASIVE SPECIES (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| FENCING PROPOSALS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| FENCING PROPOSALS (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| FENCING PROPOSALS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| FENCING STANDARD DETAILS (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| FENCING STANDARD DETAILS (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LAYOUT 1 OF 3Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LAYOUT 1 OF 3Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LAYOUT 2 OF 3Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LAYOUT 2 OF 3Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LAYOUT 3 OF 3Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LAYOUT 3 OF 3Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE STANDARD DETAILSDrawing · PDF | 3 Nov 2017 | View |
| DRAINAGE STANDARD DETAILSDrawing · PDF | 3 Nov 2017 | View |
| CULVERT LOCATION PLAN AND WORKS TO EXISTING WATERCOURSES (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT LOCATION PLAN AND WORKS TO EXISTING WATERCOURSES (2 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT LOCATION PLAN AND WORKS TO EXISTING WATERCOURSES (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 1 DETAILS (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 1 DETAILS (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 2 DETAILS (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 2 DETAILS (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 3 DETAILS (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 3 DETAILS (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CROSSING NO. 4 DETAILSDrawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 5 DETAILSDrawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 6 DETAILSDrawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 7 DETAILS (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 7 DETAILS (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 8 DETAILS (1 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 8 DETAILS (2 OF 2)Drawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 9 DETAILSDrawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 10 DETAILSDrawing · PDF | 3 Nov 2017 | View |
| CULVERT NO. 11 DETAILSDrawing · PDF | 3 Nov 2017 | View |
| WATERCOURSE TYPICAL SECTIONS (1 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| WATERCOURSE TYPICAL SECTIONS (3 OF 3)Drawing · PDF | 3 Nov 2017 | View |
| SWALE NUMBERING AND SECTION LOCATIONSDrawing · PDF | 3 Nov 2017 | View |
| SWALE NUMBERING AND SECTION LOCATIONSDrawing · PDF | 3 Nov 2017 | View |
| SWALE CROSS-SECTIONS AND DETAILSDrawing · PDF | 3 Nov 2017 | View |
| SWALE CROSS-SECTIONS AND DETAILDrawing · PDF | 3 Nov 2017 | View |
| SWALE SPOT LEVELS, INLETS AND OUTFALLSDrawing · PDF | 3 Nov 2017 | View |
| SWALE SPOT LEVELS, INLETS AND OUTFALLSDrawing · PDF | 3 Nov 2017 | View |
| SWALE STANDARD CONSTRUCTION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| SWALE STANDARD CONSTRUCTION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| DETENTION PONDS CROSS SECTION LOCATIONSDrawing · PDF | 3 Nov 2017 | View |
| DETENTION PONDS CROSS SECTION LOCATIONSDrawing · PDF | 3 Nov 2017 | View |
| DETENTION PONDS CROSS SECTIONS AND DETAILDrawing · PDF | 3 Nov 2017 | View |
| DETENTION PONDS CROSS SECTIONS AND DETAILDrawing · PDF | 3 Nov 2017 | View |
| DETENTION POND STANDARD CONSTRUCTION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| DETENTION POND STANDARD CONSTRUCTION DETAILSDrawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (1 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (2 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (3 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (4 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (5 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (6 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| DRAINAGE LONG SECTIONS (7 OF 7)Drawing · PDF | 3 Nov 2017 | View |
| SURFACE WATER CATCHMENT PLANDrawing · PDF | 3 Nov 2017 | View |
| FLOOD PATHDrawing · PDF | 3 Nov 2017 | View |
| GMS CONSTRAINTSReport | 8 Aug 2017 | View |
| LANDSCAPE AREASDrawing · PDF | 8 Aug 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 8 Aug 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 8 Aug 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 8 Aug 2017 | View |
| SOFT LANDSCAPE PROPOSALSDrawing · PDF | 8 Aug 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 8 Aug 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 8 Aug 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 8 Aug 2017 | View |
| TREE PROTECTION PLANDrawing · PDF | 8 Aug 2017 | View |
| LOCATION PLANOS Extract · PDF | 8 Aug 2017 | View |
| ABORICULTURAL METHOD STATEMENTReport · PDF | 2 Aug 2017 | View |
| HIGHWAYS SPECIFICATION SERIES 3000: LANDSCAPE AND ECOLOGYReport · PDF | 2 Aug 2017 | View |
| ABORICULTURAL CONSTRAINTS REPORTReport · PDF | 2 Aug 2017 | View |
| PRELIMINARY ECOLOGICAL APPRAISALReport · PDF | 2 Aug 2017 | View |
| HABITAT MANAGEMENT PLANReport · PDF | 2 Aug 2017 | View |
| BAT REPORTReport · PDF | 2 Aug 2017 | View |
| NUMBERING AND SECTION LOCATIONSDrawing · PDF | 31 Jul 2017 | View |
| GENERAL ARRAMGEMENT (1 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| GENERAL ARRANGEMENT (2 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| GENERAL ARRANGEMENT (3 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| ROW TEMPORARY CLOSURE & PERMANENT DIVERSIONDrawing · PDF | 28 Jul 2017 | View |
| DRAINAGE LAYOUT 1 OF 3Drawing · PDF | 28 Jul 2017 | View |
| DRAINAGE LAYOUT 2 OF 3Drawing · PDF | 28 Jul 2017 | View |
| DRAINAGE LAYOUT 3 OF 3Drawing · PDF | 28 Jul 2017 | View |
| SWALE CROSS-SECTIONS AND DETAILDrawing · PDF | 28 Jul 2017 | View |
| SWALE SPOT LEVELS, INLETS & OUTFALLSDrawing · PDF | 28 Jul 2017 | View |
| SWALE STANDARD CONSTRUCTION DETAILSDrawing · PDF | 28 Jul 2017 | View |
| DETENTION PONDS CROSS SECTION LOCATIONSDrawing · PDF | 28 Jul 2017 | View |
| DETENTION PONDS CROSS SECTIONS & DETAILDrawing · PDF | 28 Jul 2017 | View |
| DETENTION POND STANDARD CONSTRUCTION DETAILSDrawing · PDF | 28 Jul 2017 | View |
| DETENTION POND STANDARD CONSTRUCTION DETAILSDrawing · PDF | 28 Jul 2017 | View |
| PLAN ON COMMERCIAL AREA RE-GRADINGDrawing · PDF | 28 Jul 2017 | View |
| COMMERCIAL AREA CROSS SECTIONSDrawing · PDF | 28 Jul 2017 | View |
| ROAD PAVEMENTS (1 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| ROAD PAVEMENTS (2 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| ROAD PAVEMENTS (3 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| ROAD PAVEMENTS STANDARD DETAILSDrawing · PDF | 28 Jul 2017 | View |
| HIGHWAY CONTOURS (1 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| HIGHWAY CONTOURS (3 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| HIGHWAY CONTOURS (3 OF 3)Drawing · PDF | 28 Jul 2017 | View |
| HIGHWAY LONG SECTIONS (1 OF 4)Drawing · PDF | 28 Jul 2017 | View |
| HIGHWAY LONG SECTIONS (2 OF 4)Drawing · PDF | 28 Jul 2017 | View |
| HIGHWAY LONG SECTIONS (3 OF 4)Drawing · PDF | 28 Jul 2017 | View |
| HIGHWAY LONG SECTIONS (4 OF 4)Drawing · PDF | 28 Jul 2017 | View |
| APPLICATION FORMApplication Form · PDF | 28 Jul 2017 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.