Council planning record

Seek non-material amendment to planning consent 15/0097/FULL (Erect a single wind turbine with a maximum blade tip height of up to 78 metres and associated infrastructure including the installation of a new access track and upgraded access track; a crane pad (measuring approximately 25m by 40m) and a substation) to change the construction materials in relation to permitted substation and associated fencing

Wind Turbine At Grid Ref 313279 202091 Cefn Bach Farm Cefn Road Upper Deri

DecidedReference: 17/0379/NMACaerphilly County Borough Council

Application location

Wind Turbine At Grid Ref 313279 202091 Cefn Bach Farm Cefn Road Upper Deri

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non-Material Amendments
Received
27 Apr 2017
Validated
12 May 2017
Determination deadline
9 Jun 2017
Local authority
Caerphilly County Borough Council

Application overview

Seek non-material amendment to planning consent 15/0097/FULL (Erect a single wind turbine with a maximum blade tip height of up to 78 metres and associated infrastructure including the installation of a new access track and upgraded access track; a crane pad (measuring approximately 25m by 40m) and a substation) to change the construction materials in relation to permitted substation and associated fencing

Proposal details

Reference
17/0379/NMA
Ward
Darran Valley
Agent
David Lock Associates Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
DECISIONDecision · PDF16 Jun 2017View
ELEVATIONSDrawing · PDF27 May 2017View
PHOTOPhoto12 May 2017View
PHOTOPhoto12 May 2017View
APPLICATION FORMApplication Form · PDF12 May 2017View
SITE LOCATION PLANDrawing · PDF27 Apr 2017View
SITE LAYOUT PLANDrawing · PDF27 Apr 2017View
BLOCK PLANDrawing · PDF27 Apr 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted
DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.