Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
20 Coptfold Road Brentwood Essex CM14 4BN
Last published check: 10 Oct 2026, 02:26. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceThe replacement of windows to the front elevation with the installation of Timber Sash double glazing windows, replacement of Crittall windows to the rear elevation with UPVC windows. Replacement of the roof structure (Decay/structural deteriorated) with a like for like timber roof structure finished in Redland concrete tiles. Internal alterations including replacement internal doors, and the excavation of the existing basement to form a storage area.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details20 Coptfold Road Brentwood Essex CM14 4BN
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| EXISTING/PROPOSED ROOF PLANSSuperseded Drawing · PDF | 22 Jun 2026 | View |
| HERITAGE LISTINGSupporting Documents · PDF | 17 Jun 2026 | View |
| EXISTING FLOOR PLANSDrawing · PDF | 17 Jun 2026 | View |
| PROPOSED ELEVATIONSDrawing · PDF | 17 Jun 2026 | View |
| PROPOSED SECTION PLANSDrawing · PDF | 17 Jun 2026 | View |
| PROPOSED BLOCK AND LOCATION PLANDrawing · PDF | 17 Jun 2026 | View |
| PROPOSED ROOF WORKSDrawing · PDF | 17 Jun 2026 | View |
| PROPOSED WINDOW SCHEDULEDrawing · PDF | 17 Jun 2026 | View |
| DESIGN AND ACCESS STATEMENT WITH HERITAGEDesign and Access Statement · PDF | 17 Jun 2026 | View |
| WINDOW ELEVATION AND SECTIONSDesign and Access Statement · PDF | 17 Jun 2026 | View |
| PROPOSED FLOOR PLANSDrawing · PDF | 17 Jun 2026 | View |
| EXISTING ELEVATIONSDrawing · PDF | 17 Jun 2026 | View |
| HISTORIC BUILDINGS AND CONSERVATION ADVICEConsultee Comment Public · PDF | 26 Mar 2026 | View |
| 20COPT/PROBLCKPLANS/002 BLOCK AND LOCATION PLANSuperseded Drawing · PDF | 13 Mar 2026 | View |
| 20COPT/EXT&PROPROOFPLAN/001 EXISTING AND PROPOSED ROOF PLANSuperseded Drawing · PDF | 13 Mar 2026 | View |
| 20COPT/PROELE/001 PROPOSED ELEVATIONSSuperseded Drawing · PDF | 10 Mar 2026 | View |
| 20COPT/PROPLANS/001 DETAILED PROPOSED ROOF PLANSuperseded Drawing · PDF | 10 Mar 2026 | View |
| 20COPT/PROSECTION/001 PROPOSED SECTION PLANSuperseded Drawing · PDF | 10 Mar 2026 | View |
| Q8124-SW -01 DETAILED WINDOW DRAWINGSuperseded Drawing · PDF | 10 Mar 2026 | View |
| DESIGN, ACCESS AND HERITAGE STATEMENTSuperseded Drawing · PDF | 10 Mar 2026 | View |
| 20COPT/EXISTINGPLANS/001 EXISTING FLOOR AND ROOF PLANSuperseded Drawing · PDF | 10 Mar 2026 | View |
| LOCATION PLANSite Plan · PDF | 22 Dec 2025 | View |
| 20COPT/EXTELE/001 EXISTING ELEVATIONSuperseded Drawing · PDF | 22 Dec 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.