Council planning record

Section 73 application to vary condition 13 (Energy Statement) of planning permission 21/00665/FUL for a Section 73 application to amend conditions 2 (approved plans) and 3 (materials) of planning permission 20/00020/FUL for the erection of dwelling with associated landscaping and access works following demolition of existing garage and outbuildings. (For Clarification: this application seeks to change the method of through which 10% of the development's energy will be provided from on-site renewable production, from the approved air source heat pump to a photovoltaic installation located on the roof of the new dwelling house).

1 Newell Green Cottages Newell Green Warfield Bracknell Berkshire RG42 6AB

Decision MadeReference: 21/00989/FULBracknell Forest Council

Last published check: 30 Sept 2026, 21:44. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  2. Earliest decision date

    Published milestoneCouncil source
  3. Application expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision notice sent date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Full planning permission
Received
Not published
Validated
Not published
Determination deadline
14 Dec 2021
Local authority
Bracknell Forest Council

Application overview

Section 73 application to vary condition 13 (Energy Statement) of planning permission 21/00665/FUL for a Section 73 application to amend conditions 2 (approved plans) and 3 (materials) of planning permission 20/00020/FUL for the erection of dwelling with associated landscaping and access works following demolition of existing garage and outbuildings. (For Clarification: this application seeks to change the method of through which 10% of the development's energy will be provided from on-site renewable production, from the approved air source heat pump to a photovoltaic installation located on the roof of the new dwelling house).

Proposal details

Reference
21/00989/FUL
Ward
Binfield North & Warfield West
Parish
Warfield Parish Council
Agent
Mr Jonathan Spires

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

1 Newell Green Cottages Newell Green Warfield Bracknell Berkshire RG42 6AB

This record has no verified map location.

Documents 10 of 10

DocumentPublishedAction
Community Infrastructure LevyCommunity Infrastructure levy · PDF19 Oct 2021View
ReportReport · PDF10 Jan 2022View
ReportReport · PDF19 Oct 2021View
Related DrawingPlan · PDF19 Oct 2021View
Decided DrawingPlan · PDF22 Nov 2021View
Decided DrawingPlan · PDF19 Oct 2021View
ConsulteeConsultee · PDF15 Dec 2021View
Community Infrastructure LevyCommunity Infrastructure levy · PDF13 Jan 2022View
DecisionDecision Notice · PDF10 Jan 2022View
Correspondence SentCorrespondence - Outgoing · PDF19 Nov 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.