Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for Bournemouth, Christchurch and Poole Council. Search an address, application reference or proposal to find a record.
8,172 approved · 1,391 refused · 350 withdrawn. Received dates in our records: 17 Jul 2023 to 2 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
55 Watcombe Road Bournemouth BH6 3LU
Received 11 Feb 202526 Moor Road Poole BH18 8BD
Received 5 Jan 202656 Norton Road Bournemouth BH9 2PY
Received 19 Aug 202462 Heathwood Road Bournemouth BH9 2JZ
Received 16 Jan 2025114 Hinton Wood Avenue Christchurch BH23 5AL
Received 25 Nov 20246 Warburton Road Poole BH17 8SF
Received 23 Mar 2026Former Civic Offices Bridge Street Christchurch BH23 1AZ
Received 12 Aug 20257 Otter Road, Poole, BH15 3NH
Received 30 Jan 2025Wessex Gate Retail Park Broadstone Way Poole BH15 3TE
Received 6 Aug 20254 Newcombe Road Bournemouth BH6 5LX
Received 9 May 2024Former James Brothers Site (or part thereof), Station Road, Poole, BH15 4AN
Received 14 Feb 202510B Cliff Drive, Poole, BH13 7JD
Received 16 Jul 202412 Twynham Road Bournemouth BH6 3EZ
Received 20 Dec 20243 Sandy Lane Christchurch BH23 2NJ
Received 18 Feb 2026Talbot Heath School Rothesay Road Bournemouth BH4 9NJ
Received 15 Aug 202461 Branksome Towers, Poole, BH13 6JU
Received 25 Jun 202411A Cross Way Christchurch BH23 2PJ
Received 8 Mar 202412 Forest Road Poole BH13 6DH
Received 15 May 202553 Gough Crescent Poole BH17 7JH
Received 24 Mar 20256 Dulsie Road Bournemouth BH3 7EA
Received 20 Jun 202521 Rugby Road, Poole, BH17 7HJ
Received 16 Dec 2024315 Alder Road, Poole, BH12 5BH
Received 15 Apr 20241A Glenmeadows Drive Bournemouth BH10 5HQ
Received 4 Jun 202417B Willow Way Christchurch BH23 1JJ
Received 13 May 2025Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Bournemouth, Christchurch and Poole Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage