Status on council recordCouncil status: Split Decision
T1: Lawson Cypress - Crown lift over the driveway. Prune low foliage to provide a clearance of 2.5m to ground level. Prune back the lateral growth over the driveway only by 1m up to a height of 6m. Prune to provide a 0.5m separation from the nearest foliage to the BT cable or BT pole within the crown spread of the tree. T2: Oak - Crown lift by removing the 3 lowest small diameter primary branches to create a clearance of 4.5m from ground level. T3 : Oak - Prune back the lateral spread. Prune back the lateral growth by reducing the longest branch ends by up to 2m to suitable growth points over the roof of 7a. T5: Sycamore - Remove 2 low small diameter secondary branches. T6: Oak - Crown lift by removing the lowest secondary branch over the shrub bed and hedge.
T1: Lawson Cypress - Crown lift over the driveway. Prune low foliage to provide a clearance of 2.5m to ground level. Prune back the lateral growth over the driveway only by 1m up to a height of 6m. Prune to provide a 0.5m separation from the nearest foliage to the BT cable or BT pole within the crown spread of the tree. T2: Oak - Crown lift by removing the 3 lowest small diameter primary branches to create a clearance of 4.5m from ground level. T3 : Oak - Prune back the lateral spread. Prune back the lateral growth by reducing the longest branch ends by up to 2m to suitable growth points over the roof of 7a. T5: Sycamore - Remove 2 low small diameter secondary branches. T6: Oak - Crown lift by removing the lowest secondary branch over the shrub bed and hedge.
Reference
TP/23/00005/X
Ward
Parkstone
Agent
Mr Draper, S Draper Tree Specialists Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.