Council planning record

Listed Building Consent for internal reconfiguration and associated alterations to include the installation of tea points and WCs and reinstatement of period fireplaces and for external alterations to elevations and installation of conservation-style rooflights

10 Bridge Street and rear of Nos. 6–8 Bridge Street Christchurch BH23 1EF

Application Under ConsiderationReference: P/26/04556/LBBournemouth, Christchurch and Poole Council

Last published check: 8 Oct 2026, 21:14. Check the council record for more recent changes.

Application location

10 Bridge Street and rear of Nos. 6–8 Bridge Street Christchurch BH23 1EF

This record has no verified map location.

Application summary

Status
Application Under Consideration
Application type
Listed Building Consent
Received
21 Sept 2026
Validated
24 Sept 2026
Determination deadline
Not published
Local authority
Bournemouth, Christchurch and Poole Council

Application overview

Listed Building Consent for internal reconfiguration and associated alterations to include the installation of tea points and WCs and reinstatement of period fireplaces and for external alterations to elevations and installation of conservation-style rooflights

Proposal details

Reference
P/26/04556/LB
Ward
Christchurch Town
Parish
Christchurch Town Council
Agent
Mr Matthew Stevens, Aspire Architects (Christchurch) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
Proposed Side Elevations - CourtyardPlan24 Sept 2026View
Proposed Ground Floor PlanPlan21 Sept 2026View
Existing Third Floor PlanPlan21 Sept 2026View
Existing Second Floor PlanPlan21 Sept 2026View
Existing First Floor PlanPlan21 Sept 2026View
Existing Ground Floor PlanPlan21 Sept 2026View
Location & Block PlanPlan21 Sept 2026View
Site PlanPlan21 Sept 2026View
Proposed Side Elevation - CourtyardPlan21 Sept 2026View
Proposed Rear ElevationPlan21 Sept 2026View
Existing Side Elevations - CourtyardPlan21 Sept 2026View
Existing Side Elevation - CourtyardPlan21 Sept 2026View
Existing Front & Rear ElevationsPlan21 Sept 2026View
Proposed First Floor PlanPlan21 Sept 2026View
Proposed Second Floor PlanPlan21 Sept 2026View
Proposed Third Floor PlanPlan21 Sept 2026View
Existing Side ElevationPlan21 Sept 2026View
Heritage StatementReports/Statements24 Sept 2026View
Listed Building ApplicationApplication Form21 Sept 2026View
Planning StatementReports/Statements21 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application received

    Published milestoneCouncil source
  2. Consultation start

    Published milestoneCouncil source
  3. Application valid

    Published milestoneCouncil source
  4. Site notice expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation end

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.