Amendment to previous planning permission including Variation of conditions 1, 2, 3, 6, 7,11,14,15,16, 20, 27, 28 and 29 and Removal of conditions 32 and 35 of planning permission 7-2021-16166-P (Proposed improvements at existing Water Treatment Works [necessitated pursuant to Drinking Water Inspectorate regulatory requirements] to include advanced water treatment and processing plant and equipment housed within a new 4 level main operational building, ancillary storage buildings, structures, external tanks, and the erection of a communications mast of approx. 25.67m, together with other ancillary development) - for a number of changes in respect to the relocation or omission of some of the approved ancillary process infrastructure, including the retention and re-use of the combined slow sand filter/reservoir structure to the south of the new process building

Alderney Water Treatment Works Francis Avenue Bournemouth BH11 8NX

Application Under ConsiderationReference: P/26/00299/CONDRBournemouth, Christchurch and Poole Council

Last published check: 9 Oct 2026, 11:56. Check the council record for more recent changes.

Application location

Alderney Water Treatment Works Francis Avenue Bournemouth BH11 8NX

This record has no verified map location.

Application summary

Status
Application Under Consideration
Application type
Removal or Variation of Condition
Received
23 Jan 2026
Validated
23 Jan 2026
Determination deadline
Not published
Local authority
Bournemouth, Christchurch and Poole Council

Application overview

Amendment to previous planning permission including Variation of conditions 1, 2, 3, 6, 7,11,14,15,16, 20, 27, 28 and 29 and Removal of conditions 32 and 35 of planning permission 7-2021-16166-P (Proposed improvements at existing Water Treatment Works [necessitated pursuant to Drinking Water Inspectorate regulatory requirements] to include advanced water treatment and processing plant and equipment housed within a new 4 level main operational building, ancillary storage buildings, structures, external tanks, and the erection of a communications mast of approx. 25.67m, together with other ancillary development) - for a number of changes in respect to the relocation or omission of some of the approved ancillary process infrastructure, including the retention and re-use of the combined slow sand filter/reservoir structure to the south of the new process building

Proposal details

Reference
P/26/00299/CONDR
Ward
Alderney & Bourne Valley
Agent
Mr Paul Rogers, tor&co Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 132 of 132

DocumentPublishedAction
ALDERNEY WTW dewatering plan[57].pdfReports/Statements13 Mar 2026View
Construction Env Management Plan.pdfReports/Statements13 Mar 2026View
Removal/Variation of ConditionApplication Form23 Jan 2026View
Covering LetterCorrespondence - Incoming23 Jan 2026View
Planning, Design & Access StatementReports/Statements23 Jan 2026View
Surface Water Drainage Strategy - Part1Reports/Statements23 Jan 2026View
Surface Water Drainage Strategy - Part2Reports/Statements23 Jan 2026View
Surface Water Drainage Strategy - Part3Reports/Statements23 Jan 2026View
Surface Water Drainage Strategy - Part4Reports/Statements23 Jan 2026View
Revised Shadow Habitats Regulations Assessment ReportReports/Statements23 Jan 2026View
Energy & Carbon StatementReports/Statements23 Jan 2026View
Appendix D15 - Updated Landscape & Ecological Mitigation PlanReports/Statements23 Jan 2026View
Appendix D18 - Updated Biodiversity Net Gain Assessment CopyReports/Statements23 Jan 2026View
Construction Environmental Management Plan (CEMP)Reports/Statements23 Jan 2026View
EIA Screening ReportReports/Statements23 Jan 2026View
Original Environmental Statement Volume 1 Main ReportReports/Statements23 Jan 2026View
Original Environmental Statement Volume 2 Appendices Contents PageReports/Statements23 Jan 2026View
Original Environmental Non Technical SummaryReports/Statements23 Jan 2026View
Original Environmental Appendix A.1 Planning Application DrawingsReports/Statements23 Jan 2026View
Original Environmental Appendix A.2 Additional PlansReports/Statements23 Jan 2026View
Original Environmental Appendix A.3 Landscape And Ecological Mitigation PlanReports/Statements23 Jan 2026View
Original Environmental Appendix A.4 Statement Of ExpertiseReports/Statements23 Jan 2026View
Original Environmental Appendix B.2 Lighting AssessmentReports/Statements23 Jan 2026View
Original Environmental Appendix B.1 Arboricultural InformationReports/Statements23 Jan 2026View
Original Environmental Appendix B.3 Framework DcempReports/Statements23 Jan 2026View
Original Environmental Appendix C.1 Screening RequestReports/Statements23 Jan 2026View
Original Environmental Appendix C.2 Bcp Screening OpinionReports/Statements23 Jan 2026View
Original Environmental Appendix C.3 Scoping Report Part1Reports/Statements23 Jan 2026View
Original Environmental Appendix C.3 Scoping Report Part2Reports/Statements23 Jan 2026View
Original Environmental Appendix C.4 Draft Scoping OpinionReports/Statements23 Jan 2026View
Original Environmental Appendix D.11 Bat Roost SurveysReports/Statements23 Jan 2026View
Original Environmental Appendix D.13 Designated Sites Of Nature Conservation ImportanceReports/Statements23 Jan 2026View
Original Environmental Appendix D.1 Species Legislation And Conservation StatusReports/Statements23 Jan 2026View
Original Environmental Appendix D.2 Phase 1 Habitat Plan Target Notes And PhotographsReports/Statements23 Jan 2026View
Original Environmental Appendix D.3 Botanical SurveysReports/Statements23 Jan 2026View
Original Environmental Appendix D.4 Invertebrate SurveyReports/Statements23 Jan 2026View
Original Environmental Appendix D.5 Great Crested Newt SurveyReports/Statements23 Jan 2026View
Original Environmental Appendix D.6 Reptile SurveyReports/Statements23 Jan 2026View
Original Environmental Appendix D.7 Alderney Wtw Bird SurveysReports/Statements23 Jan 2026View
Original Environmental Appendix D.8 Canford Heath Bird SurveysReports/Statements23 Jan 2026View
Original Environmental Appendix D.9 Badger SurveyReports/Statements23 Jan 2026View
Original Environmental Appendix D.10 Hazel Dormouse SurveyReports/Statements23 Jan 2026View
Original Environmental Appendix D.12 Bat Activity SurveysReports/Statements23 Jan 2026View
Original Environmental Appendix D.14 Plant Species ListReports/Statements23 Jan 2026View
Original Environmental Appendix D.15 Landscape And Ecological Mitigation PlanReports/Statements23 Jan 2026View
Original Environmental Appendix D.16 Ecological Constraints And Opportunities PlanReports/Statements23 Jan 2026View
Original Environmental Appendix D.17 Lighting Assessment Lux Contour PlanReports/Statements23 Jan 2026View
Original Environmental Appendix D.18 Biodiversity Net Gain AssessmentReports/Statements23 Jan 2026View
Original Environmental Appendix D.19 Consultation Meeting MinutesReports/Statements23 Jan 2026View
Original Environmental Appendix D.20 Shadow Habitats Regulations AssessmentReports/Statements23 Jan 2026View
Original Environmental Appendix E.1 Lvia Figure 8.1 Part 1 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix E.1 Lvia Figure 8.2 Part 2 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix E.1 Lvia Figure 8.3 Part 3 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix E.1 Lvia Figure 8.8 Part 5 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix E.1 Lvia Figures 8.4 8.7 Part 4 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix E.2 Lvia MethodologyReports/Statements23 Jan 2026View
Original Environmental Appendix E.3 Schedule Of Landscape EffectsReports/Statements23 Jan 2026View
Original Environmental Appendix E.4 Schedule Of Visual EffectsReports/Statements23 Jan 2026View
Original Environmental Appendix E.4 Schedule Of Visual Effects Es Appendix F.2 Sww Technical Standard Noise Level LimitsReports/Statements23 Jan 2026View
Original Environmental Appendix E.4 Schedule Of Visual Effectses Appendix F.1 Noise And Vibration FiguresReports/Statements23 Jan 2026View
Original Environmental Appendix G.1 Flood Risk AssessmentReports/Statements23 Jan 2026View
Original Environmental Appendix G.2 Study Area PlanReports/Statements23 Jan 2026View
Original Environmental Appendix G.3 Bourne Stream Topographical SurveyReports/Statements23 Jan 2026View
Original Environmental Appendix G.4 Scope Of The Contemporary Bourne Steam Monitoring ProgrammeReports/Statements23 Jan 2026View
Original Environmental Appendix G.5 Alderney Wtw Discharges Water Quality Data 2018 To 2020Reports/Statements23 Jan 2026View
Original Environmental Appendix G.6 Results Of In Situ Water Quality SamplingReports/Statements23 Jan 2026View
Original Environmental Appendix G.7 Swws Countess Wear Laboratory Water Quality Analysis ResultsReports/Statements23 Jan 2026View
Original Environmental Appendix G.8 Wessex Waters Sewer PlansReports/Statements23 Jan 2026View
Original Environmental Appendix G.9 Bournemouth Waters Alderney Wtw Drainage PlanReports/Statements23 Jan 2026View
Original Environmental Appendix G.10 Daily Mean Flow At The Environment Agencys Branksome Road Gauge And Daily Mean Discharges From The Alderney WtwReports/Statements23 Jan 2026View
Original Environmental Appendix G.11 Flow Statistics For The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.12 Comparison Of Prorated Flows On The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.13 Prorated Flows On The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.14 Prorated Flows On The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.15 Gauged Flow On The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.16 Gauged Flow On The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.17 Estimated Flow On The Bourne StreamReports/Statements23 Jan 2026View
Original Environmental Appendix G.18 Results Showing The Efficacy Of The Historical Flow Augmentation ModelReports/Statements23 Jan 2026View
Original Environmental Appendix H.1 Hydrock Contaminated Land ScopingReports/Statements23 Jan 2026View
Original Environmental Appendix H.2 Potential Sources Of Contamination Preliminary AssessmentReports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 1 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 2 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 3 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 4 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 5 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 6 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.3 Phase 1 Geo Environmental Site Part 7 Of 7Reports/Statements23 Jan 2026View
Original Environmental Appendix H.4 Geotechnical Desk StudyReports/Statements23 Jan 2026View
Original Environmental Appendix H.5 Ground Investigation Specification And Bill Of QuantitiesReports/Statements23 Jan 2026View
Original Environmental Appendix H.6 Ground Investigation Factual ReportReports/Statements23 Jan 2026View
Original Environmental Appendix H.7 Geotech And Geo Enviro Interpretative Report Part 1 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix H.7 Geotech And Geo Enviro Interpretative Report Part 2 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix H.7 Geotech And Geo Enviro Interpretative Report Part 3 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix H.7 Geotech And Geo Enviro Interpretative Report Part 4 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix H.7 Geotech And Geo Enviro Interpretative Report Part 5 Of 5Reports/Statements23 Jan 2026View
Original Environmental Appendix I.1 Heritage Desk Based Assessment Part 1 Of 4Reports/Statements23 Jan 2026View
Original Environmental Appendix I.1 Heritage Desk Based Assessment Part 2 Of 4Reports/Statements23 Jan 2026View
Original Environmental Appendix I.1 Heritage Desk Based Assessment Part 3 Of 4Reports/Statements23 Jan 2026View
Original Environmental Appendix I.1 Heritage Desk Based Assessment Part 4 Of 4Reports/Statements23 Jan 2026View
Original Environmental Appendix J.1 Waste Strategy And Site Waste Management PlanReports/Statements23 Jan 2026View
from EA in conjunction with previous response.pdfConsultee Response11 Mar 2026View
EHO comments Francis Rd_ BournemouthConsultee Response9 Mar 2026View
LLFA response - PLN26-003Consultee Response20 Feb 2026View
Environment AgencyConsultee Response13 Feb 2026View
Trees ResponseConsultee Response11 Feb 2026View
Urban Design ResponseConsultee Response6 Feb 2026View
Consultee - Historic EnglandConsultee Response4 Feb 2026View
Jeff Ashwell 53 FRANCIS AVENUE - CommentNeighbour Representation3 Mar 2026View
Building Plant Equipment Site PlanPlan23 Jan 2026View
Chlorine Contact Tanks Building Elevations East & SouthPlan23 Jan 2026View
Chlorine Contact Tanks Building Elevations West & NorthPlan23 Jan 2026View
Chlorine Contact Tanks Building PlansPlan23 Jan 2026View
Chlorine Contact Tanks SectionsPlan23 Jan 2026View
Demolition PlanPlan23 Jan 2026View
Existing Reservoir 4 Repurposed Waste Water Storage ElevationsPlan23 Jan 2026View
Existing Reservoir 4 Repurposed Waste Water Storage Plan & RoofPlan23 Jan 2026View
Location PlanPlan23 Jan 2026View
Main Treatment Building Csb Gac Cbt Complex ElevationsPlan23 Jan 2026View
Main Treatment Building Csb Gac Cbt Complex SectionsPlan23 Jan 2026View
Mtb Csb Gac Cbt Complex ElevationsPlan23 Jan 2026View
Mtb Csb Gac Cbt Complex First Floor PlanPlan23 Jan 2026View
Mtb Csb Gac Cbt Complex Ground Floor PlanPlan23 Jan 2026View
Mtb Csb Gac Cbt Complex Roof PlanPlan23 Jan 2026View
Outline Site Drainage Layout Proposed & ExistingPlan23 Jan 2026View
Outline Site Drainage Layout ProposedPlan23 Jan 2026View
Site Layout PlanPlan23 Jan 2026View
Site SectionsPlan23 Jan 2026View
Landscape Strategy PlanPlan23 Jan 2026View
Elum Extenal Lighting Overall Site Contours PlanPlan23 Jan 2026View
Elum External Lighting Calculation Point IllumanancePlan23 Jan 2026View
Elum External Lighting Main Process Area Spatial MapPlan23 Jan 2026View
Elum External Lighting Overall Site Spatial MapPlan23 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application received

    Published milestoneCouncil source
  2. Application valid

    Published milestoneCouncil source
  3. Site notice expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Consultation start

    Published milestoneCouncil source
  5. Consultation end

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.