Council planning record

Prior notification procedure – Single storey side and rear extension with a maximum length of 8 metres, eave height of 2.7 metres and maximum height of 3 metres

4 Bonham Road Bournemouth BH9 1AW

Prior Approval Not RequiredReference: 7-2025-2936--(TPD)Bournemouth, Christchurch and Poole Council

Last published check: 9 Oct 2026, 17:27. Check the council record for more recent changes.

Application location

4 Bonham Road Bournemouth BH9 1AW

This record has no verified map location.

Application summary

Status
Prior Approval Not Required
Application type
Prior Notification (Part 1.A: Householder)
Received
9 Jan 2025
Validated
28 Jan 2025
Determination deadline
Not published
Local authority
Bournemouth, Christchurch and Poole Council

Application overview

Prior notification procedure – Single storey side and rear extension with a maximum length of 8 metres, eave height of 2.7 metres and maximum height of 3 metres

Proposal details

Reference
7-2025-2936--(TPD)
Ward
Talbot & Branksome Woods
Agent
Mr Joao Virtudes, ArchiGold Design

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
TPD not required decision letter template BCP - 4 Bonham Road.pdfDecision Notice6 Mar 2025View
Officer reportSystem Generated Word Doc6 Mar 2025View
ApplicationformredactedApplication Form9 Jan 2025View
Proposed Floor PlansPlan28 Jan 2025View
Location & Block PlanPlan28 Jan 2025View
Site PlanPlan9 Jan 2025View
Existing Floor PlansPlan9 Jan 2025View
Existing ElevationsPlan9 Jan 2025View
Proposed ElevationsPlan9 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application received

    Published milestoneCouncil source
  2. Application valid

    Published milestoneCouncil source
  3. Consultation end

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source

Decision & conditions

Prior approval not required
TPD not required decision letter template BCP - 4 Bonham Road.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.