Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land West of Knights Hill Village Grimston Road South Wootton Norfolk
Last published check: 11 Oct 2026, 00:13. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDISCHARGE OF CONDITION 21 for PHASE 1 ONLY as amended by 25/00792/NMA_1 Variation of condition 6 attached to planning permission 16/02231/OM and variation of conditions 1, 23 and 25 of planning permission 22/01310/RMM: Residential development of the land to provide up to 600 dwellings, incorporating affordable housing, together with a local centre for uses A1, A2, A3 and/or A5 (600m2) with the total quantum of A1 net sales area not to exceed 279m2 in the alternative, D2 community floorspace (up to 500m2), open space, formal sport pitches, a car park to serve Reffley Wood and associated development to include substations, drainage features, roads, cycle and pedestrian paths and other such works.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand West of Knights Hill Village Grimston Road South Wootton Norfolk
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| EOTCorrespondence · PDF | 28 Sept 2026 | View |
| UPDATE FROM PLANNERCorrespondence · PDF | 17 Sept 2026 | View |
| EOTCorrespondence · PDF | 26 Aug 2026 | View |
| HIGHWAYS FORMAL COMMENTSCorrespondence · PDF | 11 Aug 2026 | View |
| HIGHWAYS APPROVED DRAWINGSCorrespondence · PDF | 11 Aug 2026 | View |
| EOTCorrespondence · PDF | 28 Jul 2026 | View |
| HIGHWAYSCorrespondence · PDF | 10 Jul 2026 | View |
| AGENT & HIGHWAYS CORRESPONDENCECorrespondence · PDF | 10 Jul 2026 | View |
| HIGHWAYS FORMAL COMMENTSCorrespondence · PDF | 10 Jul 2026 | View |
| PRINCIPAL PLANNERCorrespondence · PDF | 10 Jul 2026 | View |
| CASE OFFICER CORRESPONDENCECorrespondence · PDF | 10 Jul 2026 | View |
| AGENT CONFIRMATIONCorrespondence · PDF | 9 Jul 2026 | View |
| PARISH COUNCILCorrespondence · PDF | 8 Jul 2026 | View |
| CASE OFFICER & HIGHWAYSCorrespondence · PDF | 8 Jul 2026 | View |
| PARISH COUNCIL COMMENTSConsultee Comment · PDF | 7 Jul 2026 | View |
| AGENT CORRESPONDENCECorrespondence · PDF | 3 Jul 2026 | View |
| DISC TEAM CORRESPONDENCECorrespondence · PDF | 2 Jul 2026 | View |
| DISC TEAM CORRESPONDENCECorrespondence · PDF | 30 Jun 2026 | View |
| EOT AGREEDCorrespondence · PDF | 16 Jun 2026 | View |
| NCC CORRESPONDENCECorrespondence · PDF | 10 Jun 2026 | View |
| PARISH COUNCIL CORRESPONDENCECorrespondence · PDF | 10 Jun 2026 | View |
| NCC STREET LIGHTING CORRESPONDENCECorrespondence · PDF | 10 Jun 2026 | View |
| NCC STREET LIGHTING LETTERCorrespondence · PDF | 10 Jun 2026 | View |
| NCC STREET LIGHTING CORRESPONDENCECorrespondence · PDF | 10 Jun 2026 | View |
| S38 AGREEMENT PLAN PHASE 4 - SINGLE SHEETDrawing · PDF | 10 Jun 2026 | View |
| S38 AGREEMENT PLAN PHASE 1 - SINGLE SHEETDrawing · PDF | 10 Jun 2026 | View |
| DRAWING SHEET KEY PLANDrawing · PDF | 10 Jun 2026 | View |
| PROPOSED LIGHTING LAYOUTDrawing · PDF | 10 Jun 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 1Drawing · PDF | 29 May 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 2Drawing · PDF | 29 May 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 3Drawing · PDF | 29 May 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 4Drawing · PDF | 29 May 2026 | View |
| DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 1Drawing · PDF | 29 May 2026 | View |
| DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 2Drawing · PDF | 29 May 2026 | View |
| DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 3Drawing · PDF | 29 May 2026 | View |
| DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 4Drawing · PDF | 29 May 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 - 1 OF 1Drawing · PDF | 29 May 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 - 1 OF 2Drawing · PDF | 29 May 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 - 1 OF 3Drawing · PDF | 29 May 2026 | View |
| VEHICLE TRACKING REFUSE PHASE 1Drawing · PDF | 29 May 2026 | View |
| VEHICLE TRACKING BUS PHASE 1Drawing · PDF | 29 May 2026 | View |
| VISIBILITY SPLAYS PHASE 1 - 1 OF 1Drawing · PDF | 29 May 2026 | View |
| VISIBILITY SPLAYS PHASE 1 - 1 OF 2Drawing · PDF | 29 May 2026 | View |
| VISIBILITY SPLAYS PHASE 1 - 1 OF 3Drawing · PDF | 29 May 2026 | View |
| TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 1Drawing · PDF | 29 May 2026 | View |
| TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 2Drawing · PDF | 29 May 2026 | View |
| TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 3Drawing · PDF | 29 May 2026 | View |
| TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 4Drawing · PDF | 29 May 2026 | View |
| TYPICAL HIGHWAY DETAILS SHEET 1Drawing · PDF | 29 May 2026 | View |
| S38 AGREEMENT PLAN PHASE 1Drawing · PDF | 29 May 2026 | View |
| S104 AGREEMENT PLAN PHASE 1Drawing · PDF | 29 May 2026 | View |
| AGENT EMAILCorrespondence · PDF | 29 May 2026 | View |
| EOTCorrespondence · PDF | 13 May 2026 | View |
| EOTCorrespondence · PDF | 15 Apr 2026 | View |
| AGENT CORRESPONDENCECorrespondence · PDF | 20 Mar 2026 | View |
| EOTCorrespondence · PDF | 19 Mar 2026 | View |
| HIGHWAYS UPDATECorrespondence · PDF | 19 Mar 2026 | View |
| HIGHWAYS UPDATECorrespondence | 19 Mar 2026 | View |
| HIGHWAYS UPDATECorrespondence · PDF | 19 Mar 2026 | View |
| HIGHWAYS UPDATECorrespondence · PDF | 19 Mar 2026 | View |
| AGENT CORRESPONDENCECorrespondence · PDF | 27 Feb 2026 | View |
| TECHNICAL APPROVAL CERTIFICATECorrespondence · PDF | 27 Feb 2026 | View |
| GENERAL ARRANGEMENTRevised Drawing · PDF | 27 Feb 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 3Revised Drawing · PDF | 27 Feb 2026 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 4Revised Drawing · PDF | 27 Feb 2026 | View |
| PHASE 1 LANDSCAPE COMPOSITE PLANRevised Drawing · PDF | 27 Feb 2026 | View |
| PHASE 1 HARD LANDSCAPING ZONING AND MEANS OF ENCLOSURE PLANRevised Drawing · PDF | 27 Feb 2026 | View |
| PLOT DETAILED SOFT LANDSCAPE PROPOSALSRevised Drawing · PDF | 27 Feb 2026 | View |
| PLOT DETAILED SOFT LANDSCAPE PROPOSALSRevised Drawing · PDF | 27 Feb 2026 | View |
| PHASE 1 POS DETAILED SOFT LANDSCAPE PROPOSALSRevised Drawing · PDF | 27 Feb 2026 | View |
| 400M BUS STOP RADIUSRevised Drawing · PDF | 27 Feb 2026 | View |
| PROPOSED BUS STOP PROVISIONSRevised Drawing · PDF | 27 Feb 2026 | View |
| TYPICAL HIGHWAY DETAILS SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| TYPICAL HIGHWAY DETAILS SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 4Revised Drawing · PDF | 27 Feb 2026 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 3Revised Drawing · PDF | 27 Feb 2026 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 4Revised Drawing · PDF | 27 Feb 2026 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 3Revised Drawing · PDF | 27 Feb 2026 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| VEHICLE TRACKING - BUS PHASE 1Revised Drawing · PDF | 27 Feb 2026 | View |
| VEHICLE TRACKING REFUSE PHASE 1Revised Drawing · PDF | 27 Feb 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 4Revised Drawing · PDF | 27 Feb 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 3Revised Drawing · PDF | 27 Feb 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| S104 HEADWALL DETAILS SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| MANHOLE SCHEDULE PHASE 1 FOUL WATERRevised Drawing · PDF | 27 Feb 2026 | View |
| MANHOLE SCHEDULE PHASE 1 STORM WATERRevised Drawing · PDF | 27 Feb 2026 | View |
| OFFSITE SEWER SECTIONS PHASE 1Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTIONS ROADS 17A - 20Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTIONS ROADS 15A - 17Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTIONS ROAD 13 - 15Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTIONS ROADS 11 AND 12Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTIONS ROADS 7 AND 8Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTIONS ROADS 3 - 5Revised Drawing · PDF | 27 Feb 2026 | View |
| LONGITUDINAL SECTION ROAD 1 SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 6Revised Drawing · PDF | 27 Feb 2026 | View |
| DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 5Revised Drawing · PDF | 27 Feb 2026 | View |
| DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 4Revised Drawing · PDF | 27 Feb 2026 | View |
| DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 2Revised Drawing · PDF | 27 Feb 2026 | View |
| DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 1Revised Drawing · PDF | 27 Feb 2026 | View |
| AGENT CORRESPONDENCECorrespondence · PDF | 24 Feb 2026 | View |
| AGENT EMAILCorrespondence · PDF | 5 Feb 2026 | View |
| TECH SUPPORT EMAILCorrespondence · PDF | 3 Feb 2026 | View |
| CORRESPONDENCECorrespondence · PDF | 2 Feb 2026 | View |
| EOT AGREEDCorrespondence · PDF | 6 Jan 2026 | View |
| NCC EMAILCorrespondence · PDF | 19 Dec 2025 | View |
| NCC EMAILCorrespondence · PDF | 19 Dec 2025 | View |
| OFFICER CORRESPONDENCECorrespondence · PDF | 11 Dec 2025 | View |
| DISC TEAM CORRESPONDENCECorrespondence · PDF | 11 Dec 2025 | View |
| EOT AGREEDCorrespondence · PDF | 4 Dec 2025 | View |
| OFFICER CORRESPONDENCECorrespondence · PDF | 26 Nov 2025 | View |
| DISC TEAM CORRESPONDENCECorrespondence · PDF | 12 Nov 2025 | View |
| EOT AGREE EMAKILCorrespondence · PDF | 4 Nov 2025 | View |
| CORRESPONDENCECorrespondence · PDF | 19 Sept 2025 | View |
| EOT AGREEDCorrespondence · PDF | 9 Sept 2025 | View |
| OFFICER EMAILCorrespondence · PDF | 8 Sept 2025 | View |
| AGENT CORRESPONDENCECorrespondence · PDF | 4 Sept 2025 | View |
| DISC TEAM CORRESPONDENCECorrespondence · PDF | 4 Sept 2025 | View |
| NCC CORRESPONDENCECorrespondence · PDF | 1 Sept 2025 | View |
| CORRESPONDENCECorrespondence · PDF | 13 Aug 2025 | View |
| FINAL LOGSCorrespondence · PDF | 12 Aug 2025 | View |
| TEST REPORT TRANSMITTAL-FINALCorrespondence · PDF | 12 Aug 2025 | View |
| FIELDWORK LOCATION PLANDrawing · PDF | 12 Aug 2025 | View |
| NCC CORRESPONDENCECorrespondence · PDF | 12 Aug 2025 | View |
| EOT AGREEDCorrespondence · PDF | 12 Aug 2025 | View |
| AGENT CORRESPONDENCECorrespondence · PDF | 11 Aug 2025 | View |
| NCC CORRESPONDENCECorrespondence · PDF | 6 Aug 2025 | View |
| NCC HIGHWAYS CORRESPONDENCECorrespondence · PDF | 10 Jul 2025 | View |
| EOT AGREEDCorrespondence · PDF | 4 Jul 2025 | View |
| DISC TEAM CORRESPONDENCECorrespondence · PDF | 3 Jul 2025 | View |
| AGENT EMAILCorrespondence · PDF | 2 Jul 2025 | View |
| PLANNING ADMIN CORRESPONDENCECorrespondence · PDF | 30 Jun 2025 | View |
| NCC EMAILCorrespondence · PDF | 12 Jun 2025 | View |
| APPLICATION FORMApplication Form · PDF | 20 May 2025 | View |
| COVERING LETTERCorrespondence · PDF | 20 May 2025 | View |
| DISCHARGE OF CONDITIONS STATEMENTCorrespondence · PDF | 20 May 2025 | View |
| STORM NETWORK 1 DATASHEETCorrespondence · PDF | 20 May 2025 | View |
| S104 AGREEMENT PLAN PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| S104 AGREEMENT PLAN PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| S38 AGREEMENT PLAN PHASE 1 SHEET 3Drawing · PDF | 20 May 2025 | View |
| S38 AGREEMENT PLAN PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| S38 AGREEMENT PLAN PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| TYPICAL HIGHWAY DETAILS SHEET 2Drawing · PDF | 20 May 2025 | View |
| TYPICAL HIGHWAYS DETAILS SHEET 1Drawing · PDF | 20 May 2025 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 3Drawing · PDF | 20 May 2025 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 3Drawing · PDF | 20 May 2025 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| VISIBILITY SPLAYS PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| VEHICLE TRACKING BUS PHASE 1Drawing · PDF | 20 May 2025 | View |
| VEHICLE TRACKING REFUSE PHASE 1Drawing · PDF | 20 May 2025 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 3Drawing · PDF | 20 May 2025 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| ROAD SURFACING LAYOUT PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| DRAINAGE IMPERMEABLE AREAS PHASE 1 SHEET 3Drawing · PDF | 20 May 2025 | View |
| DRAINAGE IMPERMEABLE AREAS PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| DRAINAGE IMPERMEABLE AREAS PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| STANDARD DRAINAGE DETAILS SHEET 2Drawing · PDF | 20 May 2025 | View |
| STANDARD DRAINAGE DETAILS SHEET 1Drawing · PDF | 20 May 2025 | View |
| S104 ATTENUATION BASIN 02Drawing · PDF | 20 May 2025 | View |
| S104 ATTENUATION BASIN 01Drawing · PDF | 20 May 2025 | View |
| S104 HEADWALL DETAILS SHEET 1Drawing · PDF | 20 May 2025 | View |
| MANHOLE SCHEDULE PHASE 1 FOUL WATERDrawing · PDF | 20 May 2025 | View |
| MANHOLE SCHEDULE PHASE 1 STORM WATERDrawing · PDF | 20 May 2025 | View |
| OFFSITE SEWER SECTIONS PHASE 1Drawing · PDF | 20 May 2025 | View |
| LONGITUDINAL SECTION PHASE 1 ROADS 8, 11 AND 14Drawing · PDF | 20 May 2025 | View |
| LONGITUDINAL SECTION PHASE 1 ROADS 3, 4A , 5 AND 7Drawing · PDF | 20 May 2025 | View |
| LONGITUDINAL SECTION PHASE 1 ROADS 1 AND 2Drawing · PDF | 20 May 2025 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 2Drawing · PDF | 20 May 2025 | View |
| ADOPTED HIGHWAY PLAN PHASE 1 SHEET 1Drawing · PDF | 20 May 2025 | View |
| DRAFT INFRASTRUCTURE PHASING PLANDrawing · PDF | 20 May 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.