Council planning record

DISCHARGE OF CONDITION 21 for PHASE 1 ONLY as amended by 25/00792/NMA_1 Variation of condition 6 attached to planning permission 16/02231/OM and variation of conditions 1, 23 and 25 of planning permission 22/01310/RMM: Residential development of the land to provide up to 600 dwellings, incorporating affordable housing, together with a local centre for uses A1, A2, A3 and/or A5 (600m2) with the total quantum of A1 net sales area not to exceed 279m2 in the alternative, D2 community floorspace (up to 500m2), open space, formal sport pitches, a car park to serve Reffley Wood and associated development to include substations, drainage features, roads, cycle and pedestrian paths and other such works.

Land West of Knights Hill Village Grimston Road South Wootton Norfolk

Awaiting decisionReference: 25/00792/DISC_ABorough Council of King's Lynn and West Norfolk

Last published check: 11 Oct 2026, 00:13. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
Discharge of Planning condition_A
Received
19 May 2025
Validated
20 May 2025
Determination deadline
15 Jul 2025
Local authority
Borough Council of King's Lynn and West Norfolk

Application overview

DISCHARGE OF CONDITION 21 for PHASE 1 ONLY as amended by 25/00792/NMA_1 Variation of condition 6 attached to planning permission 16/02231/OM and variation of conditions 1, 23 and 25 of planning permission 22/01310/RMM: Residential development of the land to provide up to 600 dwellings, incorporating affordable housing, together with a local centre for uses A1, A2, A3 and/or A5 (600m2) with the total quantum of A1 net sales area not to exceed 279m2 in the alternative, D2 community floorspace (up to 500m2), open space, formal sport pitches, a car park to serve Reffley Wood and associated development to include substations, drainage features, roads, cycle and pedestrian paths and other such works.

Proposal details

Reference
25/00792/DISC_A
Alternative references
PP-14015475
Ward
The Woottons
Parish
Castle Rising
Agent
Carter Jonas LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land West of Knights Hill Village Grimston Road South Wootton Norfolk

This record has no verified map location.

View council map

Documents 180 of 180

DocumentPublishedAction
EOTCorrespondence · PDF28 Sept 2026View
UPDATE FROM PLANNERCorrespondence · PDF17 Sept 2026View
EOTCorrespondence · PDF26 Aug 2026View
HIGHWAYS FORMAL COMMENTSCorrespondence · PDF11 Aug 2026View
HIGHWAYS APPROVED DRAWINGSCorrespondence · PDF11 Aug 2026View
EOTCorrespondence · PDF28 Jul 2026View
HIGHWAYSCorrespondence · PDF10 Jul 2026View
AGENT & HIGHWAYS CORRESPONDENCECorrespondence · PDF10 Jul 2026View
HIGHWAYS FORMAL COMMENTSCorrespondence · PDF10 Jul 2026View
PRINCIPAL PLANNERCorrespondence · PDF10 Jul 2026View
CASE OFFICER CORRESPONDENCECorrespondence · PDF10 Jul 2026View
AGENT CONFIRMATIONCorrespondence · PDF9 Jul 2026View
PARISH COUNCILCorrespondence · PDF8 Jul 2026View
CASE OFFICER & HIGHWAYSCorrespondence · PDF8 Jul 2026View
PARISH COUNCIL COMMENTSConsultee Comment · PDF7 Jul 2026View
AGENT CORRESPONDENCECorrespondence · PDF3 Jul 2026View
DISC TEAM CORRESPONDENCECorrespondence · PDF2 Jul 2026View
DISC TEAM CORRESPONDENCECorrespondence · PDF30 Jun 2026View
EOT AGREEDCorrespondence · PDF16 Jun 2026View
NCC CORRESPONDENCECorrespondence · PDF10 Jun 2026View
PARISH COUNCIL CORRESPONDENCECorrespondence · PDF10 Jun 2026View
NCC STREET LIGHTING CORRESPONDENCECorrespondence · PDF10 Jun 2026View
NCC STREET LIGHTING LETTERCorrespondence · PDF10 Jun 2026View
NCC STREET LIGHTING CORRESPONDENCECorrespondence · PDF10 Jun 2026View
S38 AGREEMENT PLAN PHASE 4 - SINGLE SHEETDrawing · PDF10 Jun 2026View
S38 AGREEMENT PLAN PHASE 1 - SINGLE SHEETDrawing · PDF10 Jun 2026View
DRAWING SHEET KEY PLANDrawing · PDF10 Jun 2026View
PROPOSED LIGHTING LAYOUTDrawing · PDF10 Jun 2026View
ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 1Drawing · PDF29 May 2026View
ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 2Drawing · PDF29 May 2026View
ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 3Drawing · PDF29 May 2026View
ADOPTED HIGHWAY PLAN PHASE 1 - 1 OF 4Drawing · PDF29 May 2026View
DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 1Drawing · PDF29 May 2026View
DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 2Drawing · PDF29 May 2026View
DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 3Drawing · PDF29 May 2026View
DRAINAGE & CONTOURS PLAN PHASE 1 - 1 OF 4Drawing · PDF29 May 2026View
ROAD SURFACING LAYOUT PHASE 1 - 1 OF 1Drawing · PDF29 May 2026View
ROAD SURFACING LAYOUT PHASE 1 - 1 OF 2Drawing · PDF29 May 2026View
ROAD SURFACING LAYOUT PHASE 1 - 1 OF 3Drawing · PDF29 May 2026View
VEHICLE TRACKING REFUSE PHASE 1Drawing · PDF29 May 2026View
VEHICLE TRACKING BUS PHASE 1Drawing · PDF29 May 2026View
VISIBILITY SPLAYS PHASE 1 - 1 OF 1Drawing · PDF29 May 2026View
VISIBILITY SPLAYS PHASE 1 - 1 OF 2Drawing · PDF29 May 2026View
VISIBILITY SPLAYS PHASE 1 - 1 OF 3Drawing · PDF29 May 2026View
TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 1Drawing · PDF29 May 2026View
TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 2Drawing · PDF29 May 2026View
TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 3Drawing · PDF29 May 2026View
TRAFFIC SIGNS & ROAD MARKINGS PHASE 1 - 1 OF 4Drawing · PDF29 May 2026View
TYPICAL HIGHWAY DETAILS SHEET 1Drawing · PDF29 May 2026View
S38 AGREEMENT PLAN PHASE 1Drawing · PDF29 May 2026View
S104 AGREEMENT PLAN PHASE 1Drawing · PDF29 May 2026View
AGENT EMAILCorrespondence · PDF29 May 2026View
EOTCorrespondence · PDF13 May 2026View
EOTCorrespondence · PDF15 Apr 2026View
AGENT CORRESPONDENCECorrespondence · PDF20 Mar 2026View
EOTCorrespondence · PDF19 Mar 2026View
HIGHWAYS UPDATECorrespondence · PDF19 Mar 2026View
HIGHWAYS UPDATECorrespondence19 Mar 2026View
HIGHWAYS UPDATECorrespondence · PDF19 Mar 2026View
HIGHWAYS UPDATECorrespondence · PDF19 Mar 2026View
AGENT CORRESPONDENCECorrespondence · PDF27 Feb 2026View
TECHNICAL APPROVAL CERTIFICATECorrespondence · PDF27 Feb 2026View
GENERAL ARRANGEMENTRevised Drawing · PDF27 Feb 2026View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 1Revised Drawing · PDF27 Feb 2026View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 2Revised Drawing · PDF27 Feb 2026View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 3Revised Drawing · PDF27 Feb 2026View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 4Revised Drawing · PDF27 Feb 2026View
PHASE 1 LANDSCAPE COMPOSITE PLANRevised Drawing · PDF27 Feb 2026View
PHASE 1 HARD LANDSCAPING ZONING AND MEANS OF ENCLOSURE PLANRevised Drawing · PDF27 Feb 2026View
PLOT DETAILED SOFT LANDSCAPE PROPOSALSRevised Drawing · PDF27 Feb 2026View
PLOT DETAILED SOFT LANDSCAPE PROPOSALSRevised Drawing · PDF27 Feb 2026View
PHASE 1 POS DETAILED SOFT LANDSCAPE PROPOSALSRevised Drawing · PDF27 Feb 2026View
400M BUS STOP RADIUSRevised Drawing · PDF27 Feb 2026View
PROPOSED BUS STOP PROVISIONSRevised Drawing · PDF27 Feb 2026View
TYPICAL HIGHWAY DETAILS SHEET 2Revised Drawing · PDF27 Feb 2026View
TYPICAL HIGHWAY DETAILS SHEET 1Revised Drawing · PDF27 Feb 2026View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 4Revised Drawing · PDF27 Feb 2026View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 3Revised Drawing · PDF27 Feb 2026View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 2Revised Drawing · PDF27 Feb 2026View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 1Revised Drawing · PDF27 Feb 2026View
VISIBILITY SPLAYS PHASE 1 SHEET 4Revised Drawing · PDF27 Feb 2026View
VISIBILITY SPLAYS PHASE 1 SHEET 3Revised Drawing · PDF27 Feb 2026View
VISIBILITY SPLAYS PHASE 1 SHEET 2Revised Drawing · PDF27 Feb 2026View
VISIBILITY SPLAYS PHASE 1 SHEET 1Revised Drawing · PDF27 Feb 2026View
VEHICLE TRACKING - BUS PHASE 1Revised Drawing · PDF27 Feb 2026View
VEHICLE TRACKING REFUSE PHASE 1Revised Drawing · PDF27 Feb 2026View
ROAD SURFACING LAYOUT PHASE 1 SHEET 4Revised Drawing · PDF27 Feb 2026View
ROAD SURFACING LAYOUT PHASE 1 SHEET 3Revised Drawing · PDF27 Feb 2026View
ROAD SURFACING LAYOUT PHASE 1 SHEET 2Revised Drawing · PDF27 Feb 2026View
ROAD SURFACING LAYOUT PHASE 1 SHEET 1Revised Drawing · PDF27 Feb 2026View
S104 HEADWALL DETAILS SHEET 1Revised Drawing · PDF27 Feb 2026View
MANHOLE SCHEDULE PHASE 1 FOUL WATERRevised Drawing · PDF27 Feb 2026View
MANHOLE SCHEDULE PHASE 1 STORM WATERRevised Drawing · PDF27 Feb 2026View
OFFSITE SEWER SECTIONS PHASE 1Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTIONS ROADS 17A - 20Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTIONS ROADS 15A - 17Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTIONS ROAD 13 - 15Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTIONS ROADS 11 AND 12Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTIONS ROADS 7 AND 8Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTIONS ROADS 3 - 5Revised Drawing · PDF27 Feb 2026View
LONGITUDINAL SECTION ROAD 1 SHEET 1Revised Drawing · PDF27 Feb 2026View
DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 6Revised Drawing · PDF27 Feb 2026View
DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 5Revised Drawing · PDF27 Feb 2026View
DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 4Revised Drawing · PDF27 Feb 2026View
DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 2Revised Drawing · PDF27 Feb 2026View
DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 2Revised Drawing · PDF27 Feb 2026View
DRAINAGE AND CONTOURS PLAN PHASE 1 SHEET 1Revised Drawing · PDF27 Feb 2026View
AGENT CORRESPONDENCECorrespondence · PDF24 Feb 2026View
AGENT EMAILCorrespondence · PDF5 Feb 2026View
TECH SUPPORT EMAILCorrespondence · PDF3 Feb 2026View
CORRESPONDENCECorrespondence · PDF2 Feb 2026View
EOT AGREEDCorrespondence · PDF6 Jan 2026View
NCC EMAILCorrespondence · PDF19 Dec 2025View
NCC EMAILCorrespondence · PDF19 Dec 2025View
OFFICER CORRESPONDENCECorrespondence · PDF11 Dec 2025View
DISC TEAM CORRESPONDENCECorrespondence · PDF11 Dec 2025View
EOT AGREEDCorrespondence · PDF4 Dec 2025View
OFFICER CORRESPONDENCECorrespondence · PDF26 Nov 2025View
DISC TEAM CORRESPONDENCECorrespondence · PDF12 Nov 2025View
EOT AGREE EMAKILCorrespondence · PDF4 Nov 2025View
CORRESPONDENCECorrespondence · PDF19 Sept 2025View
EOT AGREEDCorrespondence · PDF9 Sept 2025View
OFFICER EMAILCorrespondence · PDF8 Sept 2025View
AGENT CORRESPONDENCECorrespondence · PDF4 Sept 2025View
DISC TEAM CORRESPONDENCECorrespondence · PDF4 Sept 2025View
NCC CORRESPONDENCECorrespondence · PDF1 Sept 2025View
CORRESPONDENCECorrespondence · PDF13 Aug 2025View
FINAL LOGSCorrespondence · PDF12 Aug 2025View
TEST REPORT TRANSMITTAL-FINALCorrespondence · PDF12 Aug 2025View
FIELDWORK LOCATION PLANDrawing · PDF12 Aug 2025View
NCC CORRESPONDENCECorrespondence · PDF12 Aug 2025View
EOT AGREEDCorrespondence · PDF12 Aug 2025View
AGENT CORRESPONDENCECorrespondence · PDF11 Aug 2025View
NCC CORRESPONDENCECorrespondence · PDF6 Aug 2025View
NCC HIGHWAYS CORRESPONDENCECorrespondence · PDF10 Jul 2025View
EOT AGREEDCorrespondence · PDF4 Jul 2025View
DISC TEAM CORRESPONDENCECorrespondence · PDF3 Jul 2025View
AGENT EMAILCorrespondence · PDF2 Jul 2025View
PLANNING ADMIN CORRESPONDENCECorrespondence · PDF30 Jun 2025View
NCC EMAILCorrespondence · PDF12 Jun 2025View
APPLICATION FORMApplication Form · PDF20 May 2025View
COVERING LETTERCorrespondence · PDF20 May 2025View
DISCHARGE OF CONDITIONS STATEMENTCorrespondence · PDF20 May 2025View
STORM NETWORK 1 DATASHEETCorrespondence · PDF20 May 2025View
S104 AGREEMENT PLAN PHASE 1 SHEET 2Drawing · PDF20 May 2025View
S104 AGREEMENT PLAN PHASE 1 SHEET 1Drawing · PDF20 May 2025View
S38 AGREEMENT PLAN PHASE 1 SHEET 3Drawing · PDF20 May 2025View
S38 AGREEMENT PLAN PHASE 1 SHEET 2Drawing · PDF20 May 2025View
S38 AGREEMENT PLAN PHASE 1 SHEET 1Drawing · PDF20 May 2025View
TYPICAL HIGHWAY DETAILS SHEET 2Drawing · PDF20 May 2025View
TYPICAL HIGHWAYS DETAILS SHEET 1Drawing · PDF20 May 2025View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 3Drawing · PDF20 May 2025View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 2Drawing · PDF20 May 2025View
TRAFFIC SIGNS AND ROAD MARKINGS PHASE 1 SHEET 1Drawing · PDF20 May 2025View
VISIBILITY SPLAYS PHASE 1 SHEET 3Drawing · PDF20 May 2025View
VISIBILITY SPLAYS PHASE 1 SHEET 2Drawing · PDF20 May 2025View
VISIBILITY SPLAYS PHASE 1 SHEET 1Drawing · PDF20 May 2025View
VEHICLE TRACKING BUS PHASE 1Drawing · PDF20 May 2025View
VEHICLE TRACKING REFUSE PHASE 1Drawing · PDF20 May 2025View
ROAD SURFACING LAYOUT PHASE 1 SHEET 3Drawing · PDF20 May 2025View
ROAD SURFACING LAYOUT PHASE 1 SHEET 2Drawing · PDF20 May 2025View
ROAD SURFACING LAYOUT PHASE 1 SHEET 1Drawing · PDF20 May 2025View
DRAINAGE IMPERMEABLE AREAS PHASE 1 SHEET 3Drawing · PDF20 May 2025View
DRAINAGE IMPERMEABLE AREAS PHASE 1 SHEET 2Drawing · PDF20 May 2025View
DRAINAGE IMPERMEABLE AREAS PHASE 1 SHEET 1Drawing · PDF20 May 2025View
STANDARD DRAINAGE DETAILS SHEET 2Drawing · PDF20 May 2025View
STANDARD DRAINAGE DETAILS SHEET 1Drawing · PDF20 May 2025View
S104 ATTENUATION BASIN 02Drawing · PDF20 May 2025View
S104 ATTENUATION BASIN 01Drawing · PDF20 May 2025View
S104 HEADWALL DETAILS SHEET 1Drawing · PDF20 May 2025View
MANHOLE SCHEDULE PHASE 1 FOUL WATERDrawing · PDF20 May 2025View
MANHOLE SCHEDULE PHASE 1 STORM WATERDrawing · PDF20 May 2025View
OFFSITE SEWER SECTIONS PHASE 1Drawing · PDF20 May 2025View
LONGITUDINAL SECTION PHASE 1 ROADS 8, 11 AND 14Drawing · PDF20 May 2025View
LONGITUDINAL SECTION PHASE 1 ROADS 3, 4A , 5 AND 7Drawing · PDF20 May 2025View
LONGITUDINAL SECTION PHASE 1 ROADS 1 AND 2Drawing · PDF20 May 2025View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 2Drawing · PDF20 May 2025View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 2Drawing · PDF20 May 2025View
ADOPTED HIGHWAY PLAN PHASE 1 SHEET 1Drawing · PDF20 May 2025View
DRAFT INFRASTRUCTURE PHASING PLANDrawing · PDF20 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.