Council planning record

RESERVED MATTERS APPLICATION WITH SOME MATTER RESERVED FOLLOWING OUTLINE CONSENT 21/01580/FM: Proposed hybrid for the proposed Bexwell to Bury St Edmunds Pipeline Scheme with full planning consent sought for a proposed 70 kilometre pipeline and associated above ground infrastructure at Gazeley, Isleham and Woodditton; and outline consent for above ground infrastructure at Bexwell, Kentford Ladys Green and Rede with all matters reserved except access

Drain From Bexwell To Bury St Edmunds 562498 303555 Norfolk

Application PermittedReference: 22/02245/RMMBorough Council of King's Lynn and West Norfolk

Application location

Drain From Bexwell To Bury St Edmunds 562498 303555 Norfolk

This record has no verified map location.

View council map

Application summary

Status
Application Permitted
Application type
Reserved Matters - Major Development
Received
19 Dec 2022
Validated
23 Feb 2023
Determination deadline
25 May 2023
Local authority
Borough Council of King's Lynn and West Norfolk

Application overview

RESERVED MATTERS APPLICATION WITH SOME MATTER RESERVED FOLLOWING OUTLINE CONSENT 21/01580/FM: Proposed hybrid for the proposed Bexwell to Bury St Edmunds Pipeline Scheme with full planning consent sought for a proposed 70 kilometre pipeline and associated above ground infrastructure at Gazeley, Isleham and Woodditton; and outline consent for above ground infrastructure at Bexwell, Kentford Ladys Green and Rede with all matters reserved except access

Proposal details

Reference
22/02245/RMM
Ward
East Downham
Parish
Downham Market

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 109 of 109

DocumentPublishedAction
DISC_A DECISIONDecision · PDF21 Aug 2023View
DECISIONDecision · PDF21 Aug 2023View
NCC DISCHARGE OF CONDDecision · PDF21 Aug 2023View
DECISION FINAL LETTERDecision · PDF21 Aug 2023View
CSNN EMAILCorrespondence · PDF21 Aug 2023View
DISC_A NCC HIGHWAYS COMMENTConsultee Comment · PDF9 Aug 2023View
DISC_A APPLICATION FORMApplication Form · PDF3 Aug 2023View
DISC_A APPLICATION COVERING LETTERCorrespondence · PDF3 Aug 2023View
DISC_A APPENDIX B.0 SITE COMPOUND LAYOUTDrawing · PDF3 Aug 2023View
DISC_A TRAFFIC MANAGEMENT PLANReport · PDF3 Aug 2023View
DECISIONDecision · PDF21 Jun 2023View
PLANNING OFFICER REPORTReport · PDF21 Jun 2023View
EOT AGREEDCorrespondence · PDF20 Jun 2023View
MOD CORRESPONDENCEConsultee Comment · PDF9 Jun 2023View
MOD CORRESPONDENCECorrespondence · PDF6 Jun 2023View
CLLR CORRESPONDENCECorrespondence · PDF5 Jun 2023View
TOWN COUNCIL COMMENTSConsultee Comment · PDF1 Jun 2023View
CSNN EMAILCorrespondence · PDF25 May 2023View
NCC HIGHWAYS COMMENTSConsultee Comment · PDF24 May 2023View
ANGLIAN WATER CORRESPONDENCECorrespondence · PDF24 May 2023View
CSNN OFFICER CONSULTATION COMMENTSConsultee Comment · PDF22 May 2023View
CONSERVATION TEAM COMMENTSConsultee Comment · PDF25 Apr 2023View
HISTORIC ENGLAND OFFICER CONSULTATION COMMENTSConsultee Comment · PDF13 Apr 2023View
NORFOLK FIRE & RESCUE COMMENTSConsultee Comment · PDF5 Apr 2023View
NATURAL ENGLAND COMMENTSConsultee Comment · PDF5 Apr 2023View
PHOTOS OF SITE NOTICEPhoto · PDF22 Mar 2023View
KEVIN KENT COMMENTSConsultee Comment · PDF22 Mar 2023View
EAST CAMBS DISTRICT COUNCIL CORRESPONDENCEConsultee Comment · PDF20 Mar 2023View
NORFOLK CONSTABULARY CORRESPONDENCEConsultee Comment · PDF16 Mar 2023View
LEAD LOCAL FLOOD COMMENTSConsultee Comment · PDF16 Mar 2023View
SITE ELEVATIONS (OUTSIDE FENCELINE)Revised Drawing · PDF16 Feb 2023View
SITE ELEVATIONS (INSIDE FENCELINE)Revised Drawing · PDF16 Feb 2023View
INTERNAL FLOOR PLANS & SECTIONSRevised Drawing · PDF16 Feb 2023View
PLANNING ADMIN CORRESPONDENCECorrespondence · PDF14 Feb 2023View
EXISTING AND PROPOSED SITE LEVELSRevised Drawing · PDF13 Feb 2023View
ANGLIA WATER EMAILCorrespondence · PDF3 Feb 2023View
PLANNING STATEMENTReport · PDF3 Feb 2023View
EXISTING SITE LEVELSDrawing · PDF3 Feb 2023View
PROPOSED EXTERNAL LIGHTINGDrawing · PDF3 Feb 2023View
VECHICLE TRACKINGDrawing · PDF3 Feb 2023View
PROPOSED PUMPING STATIONDrawing · PDF3 Feb 2023View
PUMPING STATION ACCESS DETAILSDrawing · PDF3 Feb 2023View
FLOOR PLANS AND SECTIONDrawing · PDF3 Feb 2023View
SITE ELEVATIONS INSIDE FENCELINEDrawing · PDF3 Feb 2023View
SITE ELEVATIONS OUTSIDE FENCELINEDrawing · PDF3 Feb 2023View
SITE LAYOUT PLANDrawing · PDF3 Feb 2023View
EXISTING SITE LAYOUTDrawing · PDF3 Feb 2023View
LOCATION PLANDrawing · PDF3 Feb 2023View
EMAIL TO ANGLIAN WATERCorrespondence · PDF23 Jan 2023View
APPLICATION FORMApplication Form · PDF22 Dec 2022View
LOCATION PLANDrawing · PDF22 Dec 2022View
EXISTING SITE LAYOUT PLANDrawing · PDF22 Dec 2022View
PROPOSED SITE LAYOUT PLANDrawing · PDF22 Dec 2022View
SITE LAYOUT PLANDrawing · PDF22 Dec 2022View
SITE ELEVATIONS OUTSIDE FENCE LINEDrawing · PDF22 Dec 2022View
SITE ELEVATIONS INSIDE FENCE LINEDrawing · PDF22 Dec 2022View
PS FLOOR PLAN AND SECTIONSDrawing · PDF22 Dec 2022View
ACCESS DETAILSDrawing · PDF22 Dec 2022View
ACCESS VEHICLE TRACKINGDrawing · PDF22 Dec 2022View
ENVIRONMENTAL STATEMENT ADDENDUMReport · PDF22 Dec 2022View
NON TECHNICAL SUMMARYReport · PDF22 Dec 2022View
DRAINAGE LAYOUT PLANDrawing · PDF22 Dec 2022View
IMPERMEABLE AREA PLANDrawing · PDF22 Dec 2022View
SUDS ASSESSMENTReport · PDF22 Dec 2022View
STANDARD DETAILS PLANDrawing · PDF22 Dec 2022View
PROPOSED SITE LAYOUTDrawing · PDF22 Dec 2022View
ACCURATE VISUAL REPRESENTATION METHODOLOGYReport · PDF22 Dec 2022View
APPENDIX 2.2 TECHNICAL NOTE ON LIGHTING DESIGNReport · PDF22 Dec 2022View
APPENDIX 2.3 OUTLINE REINSTATEMENT STRATEGYReport · PDF22 Dec 2022View
APPENDIX 5.1 BNG TECHNICAL REPORTReport · PDF22 Dec 2022View
APPENDIX 5.2 LEMPReport · PDF22 Dec 2022View
APPENDIX 7.1 ARCHAEOLOGICAL EVALUATION PRELIMINARY REPORT_PART1Report · PDF22 Dec 2022View
APPENDIX 7.1 ARCHAEOLOGICAL EVALUATION PRELIMINARY REPORT_PART2Report · PDF22 Dec 2022View
APPENDIX 7.1 ARCHAEOLOGICAL EVALUATION PRELIMINARY REPORT_PART3Report · PDF22 Dec 2022View
APPENDIX 8.2 LANDSCAPE EFFECTS SCHEDULEReport · PDF22 Dec 2022View
APPENDIX 8.3 VISUAL EFFECTS SCHEDULEReport · PDF22 Dec 2022View
APPENDIX 10.1 GEO-ENVIRONMENTAL GQRAReport · PDF22 Dec 2022View
APPENDIX 12.1 BEXWELL FLOOD RISK ASSESSMENTReport · PDF22 Dec 2022View
BEXWELL NON POP REQUEST FORM SPAReport · PDF22 Dec 2022View
BEXWELL PUMPING STATION VERIFIED VIEWS_PART1Report · PDF22 Dec 2022View
BEXWELL PUMPING STATION VERIFIED VIEWS_PART2Report · PDF22 Dec 2022View
BEXWELL RESERVOIR ASSESSMENTReport · PDF22 Dec 2022View
BNG BIODIVERSITY METRIC 3.0 BEXWELL 10082022Report · PDF22 Dec 2022View
CEMP ANNEX A DUST SUPPRESSION BARRIERS SPEC SHEETReport · PDF22 Dec 2022View
CEMP ANNEX B SPA LIGHTING DESIGN - ECOLOGICAL CONSIDERATIONSReport · PDF22 Dec 2022View
CEMP ANNEX C SPA METHOD STATEMENT_GOOSE SWAN FUNCTIONAL LANDReport · PDF22 Dec 2022View
CEMP ANNEX E SAFEGUARDING BREEDING BIRDS METHOD STATEMENTReport · PDF22 Dec 2022View
CEMP ANNEX F ASSESSING THE RISK OF DISTURBANCE TO BREEDING BIRDS GUIDANCE NOTEReport · PDF22 Dec 2022View
CEMP ANNEX G LOG PILE SPECIFICATION SHEETReport · PDF22 Dec 2022View
CEMP ANNEX H WOODLAND COMPENSATION STRATEGYReport · PDF22 Dec 2022View
CIL DECLARATIONCIL Form · PDF22 Dec 2022View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANReport · PDF22 Dec 2022View
COPY OF BEXWELL WR CELL 2 LEVELReport22 Dec 2022View
FIGURE 2.1_SCHEME OVERVIEWDrawing · PDF22 Dec 2022View
FIGURE 2.2_SCHEME LAYOUTDrawing · PDF22 Dec 2022View
FIGURE 2.3 BEXWELL ENVIRONMENTAL REINSTATEMENT PLANDrawing · PDF22 Dec 2022View
FIGURE 8.1 ZTV AND VIEWPOINT LOCATIONSDrawing · PDF22 Dec 2022View
FIGURE 8.1 ZTV AND VIEWPOINT LOCATIONSDrawing · PDF22 Dec 2022View
FIGURE 13.1 CUMULATIVE ASSESSMENTDrawing · PDF22 Dec 2022View
FITTING NO.1 - ANSELL_LIGHTING_-_AONIXLED_4_DATASHEET_2022-10-06-082711Report · PDF22 Dec 2022View
FITTING NO.1 - ANSELL_LIGHTING_-_AONIXLED_4_DATASHEET_2022-10-06-082711Report · PDF22 Dec 2022View
FITTING NO.3 - ANSELL_LIGHTING_-_AZILED30_PIR_DATASHEET_2022-10-13-220304Report · PDF22 Dec 2022View
FITTING NO.4 - ANSELL_LIGHTING_-_AME27100_BL_DATASHEET_2022-09-29-220212Report · PDF22 Dec 2022View
XXXXX-100005-BEXBURTZ-ZZZ-MAP-TE-0001 CEMP FIGURE 1Drawing · PDF22 Dec 2022View
XXXXX-100005-BEXBURTZ-ZZZ-MAP-TE-0002 CEMP FIGURE 2Drawing · PDF22 Dec 2022View
XXXXX-100005-BEXBURTZ-ZZZ-MAP-TE-0003 CEMP FIGURE 3Drawing · PDF22 Dec 2022View
INVALID LETTER (NOT INCORRECT FEE)Invalid Letter · PDF22 Dec 2022View
COVER LETTERCorrespondence · PDF21 Dec 2022View
PLANNING STATEMENTReport · PDF21 Dec 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Last Site Notice Posted Date

    Published milestoneCouncil source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Standard Consultation Date

    Published milestoneCouncil source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Decision Made Date

    Published milestoneCouncil source
  15. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
DISC_A DECISION DECISION NCC DISCHARGE OF COND DECISION FINAL LETTER DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.