Council planning record

LISTED BUILDING CONSENT FOR EXTERNAL AND INTERNAL ALTERATIONS TO INCLUDE: REMOVAL OF EXISTING SOIL STACK AT FRONT, REPOINTING TO EXTERNAL WALLS, REPLACEMENT OF DOORS AND WINDOWS, INSTALLATION OF 2NO. ROOF LIGHTS, RELOCATION OF INTERNAL STAIRCASE AND ALTERATION TO CEILING HEIGHT AT FIRST FLOOR

22 - 23 Third Street Bolton BL1 7NN

DecidedReference: 18244/24Bolton Metropolitan Borough Council

Last published check: 3 Oct 2026, 17:42. Check the council record for more recent changes.

Application location

22 - 23 Third Street Bolton BL1 7NN

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Listed Building Consent
Received
20 May 2024
Validated
20 May 2024
Determination deadline
15 Jul 2024
Local authority
Bolton Metropolitan Borough Council

Application overview

LISTED BUILDING CONSENT FOR EXTERNAL AND INTERNAL ALTERATIONS TO INCLUDE: REMOVAL OF EXISTING SOIL STACK AT FRONT, REPOINTING TO EXTERNAL WALLS, REPLACEMENT OF DOORS AND WINDOWS, INSTALLATION OF 2NO. ROOF LIGHTS, RELOCATION OF INTERNAL STAIRCASE AND ALTERATION TO CEILING HEIGHT AT FIRST FLOOR

Proposal details

Reference
18244/24
Alternative references
PP-13079232
Ward
Smithills

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 46 of 46

DocumentPublishedAction
Decision NoticeDecision · PDF21 Aug 2025View
Officer ReportOfficer Report · PDF21 Aug 2025View
FULL AMENDED PLANS RECEIVED 23.06.25Amended Drawing · PDF23 Jun 2025View
APPLICATIONFORMREDACTEDApplication Submission Details · PDF7 Feb 2025View
02.1 LOCATION PLANApplication Submission Details · PDF7 Feb 2025View
22_23 THIRD STREET - PDF - COMPLETE PLANNING PACKApplication Submission Details · PDF7 Feb 2025View
02.40 FIRST FLOOR HISTORIC FABRIC SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.39 GROUND FLOOR HISTORIC FABRIC SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.38 STRUCTURAL PLAN STAIR INTERVENTIONApplication Submission Details · PDF7 Feb 2025View
02.37 AREAS TO BE REPOINTEDApplication Submission Details · PDF7 Feb 2025View
02.36 REPOINTING METHOD STATEMENTApplication Submission Details · PDF7 Feb 2025View
02.35 ROOF PLAN DEMOLITION SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.34 ATTIC DEMOLITION SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.33 FIRST FLOOR PLAN DEMOLITION SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.32 GROUND FLOOR DEMOLITION SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.31 PROPOSED INTERNAL STUD WALL BUILDUPApplication Submission Details · PDF7 Feb 2025View
02.30 ROOF UPGRADE DETAILApplication Submission Details · PDF7 Feb 2025View
02.29 FLOOR UPGRADE DETAILApplication Submission Details · PDF7 Feb 2025View
02.28 PROPOSED DRESSING ROOM WINDOW REPLACEMENT DETAILSApplication Submission Details · PDF7 Feb 2025View
02.27 PROPOSED UTILITY ROOM WINDOW REPLACEMENT DETAILSApplication Submission Details · PDF7 Feb 2025View
02.26 WINDOW UPGRADE SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.25 PROPOSED DOOR JAMB DETAILApplication Submission Details · PDF7 Feb 2025View
02.24 PROPOSED DOOR THRESHOLD DETAILApplication Submission Details · PDF7 Feb 2025View
02.23 PROPOSED DOOR HEAD DETAILApplication Submission Details · PDF7 Feb 2025View
02.22 DOOR UPGRADE SCHEDULEApplication Submission Details · PDF7 Feb 2025View
02.21 SECTION B-B PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.20 SECTION B-B EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.19 SECTION A-A PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.18 SECTION A-A EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.17 SOUTH WEST ELEVATION PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.16 SOUTH WEST ELEVATION EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.15 NORTH WEST ELEVATION PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.14 NORTH WEST ELEVATION EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.13 NORTH EAST ELEVATION PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.12 NORTH EAST ELEVATION EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.11 ROOF PLAN PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.10 ROOF PLAN EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.9 ATTIC PLAN PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.8 ATTIC PLAN EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.7 FIRST FLOOR PLAN PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.6 FIRST FLOOR PLAN EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.5 GROUND FLOOR PLAN PROPOSEDApplication Submission Details · PDF7 Feb 2025View
02.4 GROUND FLOOR PLAN EXISTINGApplication Submission Details · PDF7 Feb 2025View
02.3 OVERVIEW PROPOSED PLANSApplication Submission Details · PDF7 Feb 2025View
02.2 OVERVIEW EXISTING PLANSApplication Submission Details · PDF7 Feb 2025View
DESIGN AND ACCESS STATEMENT 22 23 THIRD STREET BARROW BRIDGE V2Application Submission Details · PDF7 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Standard Consultation Date

    Published milestoneCouncil source
  10. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision Issued Date

    Published milestoneCouncil source
  12. Decision Made Date

    Published milestoneCouncil source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve subject to conditions
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.