England · Local authority

Bath and North East Somerset planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Bath and North East Somerset Council. Also known as B&NES, BathNES and BANES.Search an address, application reference or proposal. Official Bath and North East Somerset website

Collected application statistics

Collected records · All available dates
105,430Searchable applications
985Recorded as pending
88%Approval rate · 81,607 approved or refused records
10,149Refused applications

71,458 approved · 10,149 refused · 6,436 withdrawn. Received dates in our records: 24 Jun 1995 to 6 Nov 2026. Most recent record check: 12 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas35 mapped area records
Article 4 direction areasNo boundary records available in this collection

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Application Permitted96/02825/FUL

    Two storey side extension

    76 Bristol Road, Radstock, BA3 3EQ

    Received 5 Dec 1996
  2. Not published96/02826/GD

    Grain floor store

    New Farm, Marksbury Lane, Priston, Bath, Bath And North East Somerset, BA2 9HJ

    Received 4 Dec 1996
  3. Application Permitted96/02827/FUL

    New scout hall as amended by plans received 18th February 1997.

    Scout Hut, School Lane, Batheaston, Bath, BA1 7EP

    Received 5 Dec 1996
  4. Application Permitted96/02828/FUL

    Change of use of agricultural land to form enlarged garden.

    Parcel 9519, Rush Hill, Farrington Gurney, Bristol,

    Received 5 Dec 1996
  5. Application Refused96/02829/FUL

    Two storey side extension

    11 Lambourn Road, Keynsham, Bristol, BS31 1PR

    Received 6 Dec 1996
  6. Application Permitted96/02830/FUL

    Front porch

    19 Linden Close, Radstock, BA3 3EJ

    Received 6 Dec 1996
  7. Application Permitted96/02831/FUL

    Retention of conversion of outbuildings to form residential annexe

    Snatch Farm, Ubley, Bristol

    Received 6 Dec 1996
  8. Application Permitted96/02832/FUL

    Retention of conservatory and rear extension and construction of two rear dormers as amended by revised plans and letter received 8th January 1997.

    The Bungalow, High Street, Pensford, Bristol, Bath And North East Somerset, BS39 4BQ

    Received 9 Dec 1996
  9. Application Permitted96/02833/FUL

    Rear extension

    15 Greenlands Road, Peasedown St John, Bath, BA2 8EZ

    Received 10 Dec 1996
  10. Application Withdrawn96/02834/AGRA

    General purpose barn

    Church Farm Business Park, Ashton Hill, Corston, BA2 9AP

    Received 9 Dec 1996
  11. Application Permitted96/02835/FUL

    Side extension as amended by plans received 22nd January 1997.

    Cherry Cottage, Mead Lane, Saltford, Bristol, BS31 3EP

    Received 9 Dec 1996
  12. Application Permitted96/02836/FUL

    Provision of pitched roof to replace existing flat roof

    Writhlington Court, Frome Road, Radstock, BA3 3PF

    Received 9 Dec 1996
  13. Application Permitted96/02837/FUL

    Extension to form workshop as amended by revised plans received 3rd January 1997.

    Carshop, Radstock Road, Midsomer Norton, Radstock, BA3 2AD

    Received 11 Dec 1996
  14. Application Refused96/02838/VAR

    Variation of condition 02 on planning permission WB 5962/K of 31st June 1992 to permit use of part of building as a social area during summer months.

    Rugby Ground, Shaft Road, Monkton Combe, Bath, Bath And North East Somerset, BA2 7HP

    Received 11 Dec 1996
  15. Application Permitted96/02839/FUL

    Stainless steel flue on roof

    Bell House, Church Lane, East Harptree, Bristol, BS18 6BD

    Received 11 Dec 1996
  16. Application Permitted96/02840/FUL

    Detached double garage and access as amended by letter received 31st January 1997.

    Rose Cottage, Midford, Bath, BA2 7DD

    Received 11 Dec 1996
  17. Application Permitted96/02841/LBA

    Internal/external alterations in connection with formation of hardware shop.

    Post Office, 54 Bathford Hill, Bathford, Bath, BA1 7SN

    Received 11 Dec 1996
  18. Application Permitted96/02842/FUL

    Conversion of single dwelling to pair of two bedroom dwellings; change of use of former bank to takeaway amplified by information received 17th January 1997 and amended by plans received 3rd February 1997 and 3rd March 1997.

    Pizzeria DO NOT USE Now Known, As Pizza Plus, 11 Bath Road, Peasedown St John, Bath, BA2 8HG

    Received 12 Dec 1996
  19. Application Permitted96/02843/FUL

    Front porch

    17 Coronation Avenue, Keynsham, Bristol, BS31 2PT

    Received 13 Dec 1996
  20. Application Permitted96/02844/LBA

    External decoration and replacement of window canopy

    11 High Street, Midsomer Norton, Radstock

    Received 13 Dec 1996
  21. Application Permitted96/02845/FUL

    Two storey extension, garage and alterations to access as amended by revised plans 13th January 1997 and 28th January 1997.

    Starlings, Lower Bristol Road, Clutton, Bristol, Bath And North East Somerset, BS39 5QS

    Received 13 Dec 1996
  22. Application Permitted96/02846/FUL

    Single storey side extension and front porch

    The Walled Garden, Kingwell Hall, Hayeswood Road, Farmborough, Bath, BA2 0HH

    Received 13 Dec 1996
  23. Application Permitted96/02847/REN

    Retention of stable block

    Parcel 0726, Packhorse Lane, South Stoke, Bath,

    Received 13 Dec 1996
  24. Application Permitted96/02848/REN

    Retention of hay barn

    Parcel 0726, Packhorse Lane, South Stoke, Bath,

    Received 13 Dec 1996

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Bath and North East Somerset

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Bath and North East Somerset Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Bath and North East Somerset Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage