Awaiting decisionCouncil status: Awaiting decision

Listed Building Consent for Internal and External Alterations to the Listed Building Associated with its Refurbishment and use as a Pizzeria / Bistro, Including Conversion of the Former DJ Booth and Dance Floor to a Pizza Preparation Area; Installation of Food Service Wall Paneling; Installation of a Neapolitan Pizza Oven with Flue Routed Through the Existing Chimney; Replacement of the Existing Timber Bar with a New Timber Bar; Localized Re-plastering and Damp Remediation; Replacement Floor Finises; Installation of Hygienic Wall Paneling within the Kitchen and Toilets Replacement of Two Existing Windows with Heritage Timber Windows; Redecoration; and Removal of Redundant Wiring Cables and Fixtures.

The Waterfront Bridge Place Worksop Nottinghamshire S80 1DT

Bassetlaw District CouncilReference 26/01205/LBAListed Building Consent

Last published check: 21 Nov 2026, 16:17. Check the council record for more recent changes.

Status and dates

Last published check: 21 Nov 2026, 16:17 (UK)

Target decision date is today25 Nov 2026

  1. DoneReceived15 Sept 2026
  2. DoneValidated30 Sept 2026
  3. ClosedConsultationEnded 21 Oct 2026
  4. Next date · todayTarget decision date25 Nov 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (10)
  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Worksop South East
Parish
Worksop
Documents
6 published

Proposal

Listed Building Consent for Internal and External Alterations to the Listed Building Associated with its Refurbishment and use as a Pizzeria / Bistro, Including Conversion of the Former DJ Booth and Dance Floor to a Pizza Preparation Area; Installation of Food Service Wall Paneling; Installation of a Neapolitan Pizza Oven with Flue Routed Through the Existing Chimney; Replacement of the Existing Timber Bar with a New Timber Bar; Localized Re-plastering and Damp Remediation; Replacement Floor Finises; Installation of Hygienic Wall Paneling within the Kitchen and Toilets Replacement of Two Existing Windows with Heritage Timber Windows; Redecoration; and Removal of Redundant Wiring Cables and Fixtures.

Reference
26/01205/LBA
Alternative references
PP-15225626
Ward
Worksop South East
Parish
Worksop

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ELEVATIONS AND FLOOR PLANS 20.09.2026Drawing30 Sept 2026View
  • APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form15 Sept 2026View
  • SITE LOCATION PLAN - 15.09.2026Drawing15 Sept 2026View
  • DESIGN AND ACCESS STATEMENTDesign & Access Statement15 Sept 2026View
  • FLOOR PLANS - 15.09.2026Drawing15 Sept 2026View
  • SUPPORTING APPLICATION, HERIAGE STATEMENT, DESIGN AND ACCESS STATEMENT AND SCHEDSupporting Information15 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.