Status on council recordCouncil status: Decided

Discharge of Condition 9 (Construction Surface Water Drainage Plan Phase 1 Construction Surface Water Management Plan (CSWMP)) and Condition 17 (Contaminated Land Scheme - Phase 1 Contaminated Land Preliminary Risk Assessment (CLPRA)) of P.A. 25/01302/FUL Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one 400/275kV Supergrid Transformer (SGT) and One 400/33kV SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing.Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one 400/275kV Supergrid Transformer (SGT) and One 400/33kV SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing.

Land Adjacent To High Marnham Power Station Power Station Access Fledborough Road High Marnham Nottinghamshire

Bassetlaw District CouncilReference 26/00864/CONDRequest for Condition Discharge

Last published check: 27 Sept 2026, 16:09. Check the council record for more recent changes.

Status and dates

Last published check: 27 Sept 2026, 16:09 (UK)

  1. DoneReceived14 Jul 2026
  2. DoneValidated14 Jul 2026
  3. ClosedConsultationEnded 12 Aug 2026
  4. Date set by councilTarget decision date8 Sept 2026
  5. DecidedDetermined8 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (8)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Request for Condition Discharge
Ward
Tuxford And Trent
Parish
Marnham
Documents
11 published

Proposal

Discharge of Condition 9 (Construction Surface Water Drainage Plan Phase 1 Construction Surface Water Management Plan (CSWMP)) and Condition 17 (Contaminated Land Scheme - Phase 1 Contaminated Land Preliminary Risk Assessment (CLPRA)) of P.A. 25/01302/FUL Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one 400/275kV Supergrid Transformer (SGT) and One 400/33kV SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing.Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one 400/275kV Supergrid Transformer (SGT) and One 400/33kV SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing.

Reference
26/00864/COND
Alternative references
PP-15076235
Ward
Tuxford And Trent
Parish
Marnham
Agent
WSP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISIONDecision Notice8 Sept 2026View
  • LLFAConsultation Replies3 Sept 2026View
  • WATER MANAGEMENT CONSORTIUM 05.08.2026Consultation Replies5 Aug 2026View
  • BDC ENVIRONMENTAL HEALTH - 28.07.2026Consultation Replies28 Jul 2026View
  • ENVIROMENT AGENCY 23/07/2026Consultation Replies23 Jul 2026View
  • APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form14 Jul 2026View
  • COVERING LETTERSupporting Information14 Jul 2026View
  • CONSTRUCTION SURFACE WATER MANAGEMENT PLAN (PHASE 1)Statement14 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Determined
DECISION

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.