Discharge of Conditions 10 (Soil Management Plan): Phase 1 Soil Management Plan (SMP), Condition 12 (Site Waste Management Plan): Phase 1 Site Waste Management Plan (SWMP) and Condition 23 (Road Condition Survey): Road Condition Survey.on P/A 25/01302/FUL - Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one 400/275kV Supergrid Transformer (SGT) and One 400/33kV SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing.
Land Adjacent To High Marnham Power Station Power Station Access Fledborough Road High Marnham Nottinghamshire
Discharge of Conditions 10 (Soil Management Plan): Phase 1 Soil Management Plan (SMP), Condition 12 (Site Waste Management Plan): Phase 1 Site Waste Management Plan (SWMP) and Condition 23 (Road Condition Survey): Road Condition Survey.on P/A 25/01302/FUL - Erection of a 400kV Air Insulated Switchgear (AIS) Substation with one 400/275kV Supergrid Transformer (SGT) and One 400/33kV SGT and Construction of 16 Bays, Gantries, Control and Amenities Building, Permanent Access Road, Diesel Generator, Parking, Drainage, Lighting and CCTV Landscaping and Biodiversity Enhancement and Security Fencing.
Reference
26/00832/COND
Alternative references
PP-15066199
Ward
Tuxford And Trent
Parish
Marnham
Agent
WSP
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.