Council planning record

Application for approval of details reserved by Condition 29 (Surface Water (highways)), Condition 30 (Surface Water (phases)) and Condition 31 (Foul and Service Water) of consent reference 12/01080/OUT in respect of Plots 2.162-2.176, 2.190-2.228, 2.234-2.244, 2.245-2.257 & 2.263-2.315 on Phase 2 and Phase 3c only.

Land At Nether Mayne Basildon Essex

Awaiting decisionReference: 25/00519/CONDBasildon Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
Approval details reserved by condition
Received
16 Apr 2025
Validated
17 Apr 2025
Determination deadline
11 Jun 2025
Local authority
Basildon Borough Council

Application overview

Application for approval of details reserved by Condition 29 (Surface Water (highways)), Condition 30 (Surface Water (phases)) and Condition 31 (Foul and Service Water) of consent reference 12/01080/OUT in respect of Plots 2.162-2.176, 2.190-2.228, 2.234-2.244, 2.245-2.257 & 2.263-2.315 on Phase 2 and Phase 3c only.

Proposal details

Reference
25/00519/COND
Alternative references
PP-13928548
Ward
Langdon Hills
Agent
Planning Potential Ltd.

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land At Nether Mayne Basildon Essex

This record has no verified map location.

View council map

Documents 71 of 71

DocumentPublishedAction
PHASE 2 DRAINAGE TECHNICAL NOTEBackGround Papers - Redacted · PDF18 Sept 2025View
PHASE 3C DRAINAGE STRATEGY APPENDICESBackGround Papers - Redacted · PDF18 Sept 2025View
PHASE 3C DRAINAGE STRATEGY APPENDICESBackGround Papers - Redacted · PDF18 Sept 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF16 Apr 2025View
COVER LETTERBackGround Papers - Redacted · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 4 OF 4Drawing · PDF16 Apr 2025View
ROAD GULLY CATCHMEMENT PLANDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 1 OF 4Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 2 OF 4Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 3 OF 4Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 1Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 2Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 3Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 4Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 5Drawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
S104 AGREEMENT PLAN SHEET 1Drawing · PDF16 Apr 2025View
S104 AGREEMENT PLAN SHEET 2Drawing · PDF16 Apr 2025View
S104 SURFACE WATER CHAMBER SCHEDULE SHEET 1Drawing · PDF16 Apr 2025View
S104 SURFACE WATER CHAMBER SCHEDULE SHEET 2Drawing · PDF16 Apr 2025View
S104 FOUL WATER CHAMBER SCHEDULE SHEET 1Drawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS ADOPABLE DRAINAGEDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS ADOPTABLE DRAINAGEDrawing · PDF16 Apr 2025View
S104 DRAINAGE EASEMENT PLAN SHEET 1Drawing · PDF16 Apr 2025View
S104 DRAINAGE EASEMENT PLAN SHEET 2Drawing · PDF16 Apr 2025View
S104 PIPE NUMBER & IMPERMEABLE AREAS PLAN SHEET 1Drawing · PDF16 Apr 2025View
S104 PIPE NUMBER & IMPERMEABLE AREAS PLAN SHEETDrawing · PDF16 Apr 2025View
S104 SITE LOCATION PLANDrawing · PDF16 Apr 2025View
S104 OVERLAND FLOW ROUTES SHEET 1Drawing · PDF16 Apr 2025View
S104 OVERLAND FLOW ROUTES SHEET 2Drawing · PDF16 Apr 2025View
FOUL WATER RISING MAINDrawing · PDF16 Apr 2025View
ROAD GULLY CATCHMENT PLAN SHEET 1Drawing · PDF16 Apr 2025View
ROAD GULLIES CATCHMENT PLAN SHEET 2Drawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALDrawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 1Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 2Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 3Drawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
S104 AGREEMENT PLANDrawing · PDF16 Apr 2025View
S104 AGREEMENT PLANDrawing · PDF16 Apr 2025View
S104 DRAINAGE EASEMENT PLANDrawing · PDF16 Apr 2025View
S104 PIPE NUMBERS AND IMPERMEABLE AREASDrawing · PDF16 Apr 2025View
S104 SITE LOCATION PLANDrawing · PDF16 Apr 2025View
S104 OVERLAND FLOW ROUTESDrawing · PDF16 Apr 2025View
S104 SURFACE WATER CHAMBER SCHEDULEDrawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 1 OF 2Drawing · PDF16 Apr 2025View
PRIVATE DRAINAGE SHEET 2 OF 2Drawing · PDF16 Apr 2025View
ROAD GULLY CATCHMENT PLANDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
PHASE 2 SECTIONSDrawing · PDF16 Apr 2025View
CONSTRUCTION DETAILS PRIVATE & LATERALSDrawing · PDF16 Apr 2025View
PHASE 3C SECTIONSDrawing · PDF16 Apr 2025View
PHASE 3D OUTLINE FINISHED FLOOR LEVELSDrawing · PDF16 Apr 2025View
PHASE 3D SECTIONSDrawing · PDF16 Apr 2025View
DRAINAGE AND SUDS DESIGN MANAGEMENT PHASE 3CBackGround Papers - Redacted · PDF16 Apr 2025View
EXISTING SURFACE WATER DRAINAGE CATCHMENT PLANBackGround Papers - Redacted · PDF16 Apr 2025View
APPENDIX G MAINTENANCE & MANAGEMENT PROCESSBackGround Papers - Redacted · PDF16 Apr 2025View
DRAINAGE AND SUDS DESIGN MANAGEMENT PHASE 2BackGround Papers - Redacted · PDF16 Apr 2025View
TOPOGRAPHICAL SURVEYSDrawing · PDF16 Apr 2025View
EXISTING DRAINAGE CATCHMENT PLANDrawing · PDF16 Apr 2025View
PHASE 2 SURFACE WATER PROPOSED DRAINAGE CATCHMENTSDrawing · PDF16 Apr 2025View
PHASE 2 OUTLINE SURFACE & FOUL WATER DRAINAGE STATEGYDrawing · PDF16 Apr 2025View
PHASE 3C OUTLINE SURFACE & FOUL WATER DRAINAGE STRATEGYDrawing · PDF16 Apr 2025View
PHASE 3D OUTLINE SURFACE & FOUL WATER DRAINAGE STRATEGYDrawing · PDF16 Apr 2025View
PHASE 2 OUTLINE FINISHED FLOOR LEVELSDrawing · PDF16 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published

Appeal status: Unknown

Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.