Council planning record

Demolition of the existing foodstore (Use Class E) and erection of a 4 storey building to comprise a new foodstore and commercial space (Use Class E) at ground floor level with 72 residential flats above (Use Class C3); outdoor residential amenity deck at first floor, residents parking and servicing at ground level; reconfiguration and resurfacing of the existing car park, improvement works to pedestrian accesses and landscaping improvements, including replacement tree planting

The Co-operative Food The Co-Operative Gateway Service Road Wickford Essex

Awaiting decisionReference: 25/00214/FULLBasildon Borough Council

Last published check: 9 Oct 2026, 22:30. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  9. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
Full Application
Received
27 Feb 2025
Validated
27 Feb 2025
Determination deadline
29 May 2025
Local authority
Basildon Borough Council

Application overview

Demolition of the existing foodstore (Use Class E) and erection of a 4 storey building to comprise a new foodstore and commercial space (Use Class E) at ground floor level with 72 residential flats above (Use Class C3); outdoor residential amenity deck at first floor, residents parking and servicing at ground level; reconfiguration and resurfacing of the existing car park, improvement works to pedestrian accesses and landscaping improvements, including replacement tree planting

Proposal details

Reference
25/00214/FULL
Alternative references
PP-13753224
Ward
Wickford Park
Parish
Wickford Town Council
Agent
Peacock and Smith

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The Co-operative Food The Co-Operative Gateway Service Road Wickford Essex

This record has no verified map location.

View council map

Documents 107 of 107

DocumentPublishedAction
COMMITTEE UPDATE SHEETBackGround Papers - Redacted · PDF19 Oct 2025View
COMMITTEE REPORTCommittee Report · PDF17 Oct 2025View
REVISED PROPOSED ROOF TERRACE SECTIONDrawing · PDF13 Oct 2025View
REVISED PROPOSED LANDSCAPE PLAN - ROOF TERRACEDrawing · PDF13 Oct 2025View
REVISED PROPOSED LANDSCAPE PLANDrawing · PDF13 Oct 2025View
SWEPT PATH ANALYSIS FIRE TENDERDrawing · PDF7 Oct 2025View
REVISED PROPOSED ENTRANCE LOBBY DETAILSDrawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 08Drawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 07Drawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 06Drawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 03Drawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 02Drawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 01Drawing · PDF26 Sept 2025View
REVISED PROPOSED INTERIOR COURTYARD ELEVATIONSDrawing · PDF26 Sept 2025View
REVISED PROPOSED SOUTH AND WEST ELEVATIONSDrawing · PDF26 Sept 2025View
REVISED PROPOSED NORTH AND EAST ELEVATIONSDrawing · PDF26 Sept 2025View
REVISED PROPOSED REFUSE STRATEGYDrawing · PDF26 Sept 2025View
REVISED PROPOSED TYPICAL AMENITY DECK DETAILSDrawing · PDF26 Sept 2025View
REVISED PROPOSED SECTIONS 03Drawing · PDF26 Sept 2025View
REVISED PROPOSED SECTIONS 02Drawing · PDF26 Sept 2025View
REVISED PROPOSED SECTIONS 01Drawing · PDF26 Sept 2025View
REVISED PROPOSED SITE PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED SITE PLAN DETAILDrawing · PDF26 Sept 2025View
REVISED PROPOSED GROUND FLOOR PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED FIRST FLOOR PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED SECOND FLOOR PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED THIRD FLOOR PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED FOURTH FLOOR PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED ROOF LEVEL PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED PLANT LEVEL FLOOR PLANDrawing · PDF26 Sept 2025View
REVISED PROPOSED APARTMENT TYPES PLANSDrawing · PDF26 Sept 2025View
REVISED PROPOSED DWELLINGS DETAILS 1 BED 2 PERSONDrawing · PDF26 Sept 2025View
REVISED PROPOSED DWELLING DETAILS 2 BED 3 PERSONDrawing · PDF26 Sept 2025View
REVISED PROPOSED DWELLING DETAILS 1 BED 2 PERSONDrawing · PDF26 Sept 2025View
DESIGN ADDENDUMBackGround Papers - Redacted · PDF26 Sept 2025View
REVISED PROPOSED CGISCAD drawing26 Sept 2025View
REVISED PROPOSED CGISCAD drawing26 Sept 2025View
REVISED PROPOSED CGISCAD drawing26 Sept 2025View
REVISED PROPOSED CGISCAD drawing26 Sept 2025View
REVISED PROPOSED CGISCAD drawing26 Sept 2025View
REVISED PROPOSED BAY STUDY 05Drawing · PDF26 Sept 2025View
REVISED PROPOSED BAY STUDY 04Drawing · PDF26 Sept 2025View
REVISED HEALTH IMPACT ASSESSMENTBackGround Papers - Redacted · PDF24 Sept 2025View
UPDATED NOISE IMPACT ASSESSMENTBackGround Papers - Redacted · PDF11 Aug 2025View
REVISED DRAINAGE STRATEGYBackGround Papers - Redacted · PDF11 Aug 2025View
DRAINAGE STRATEGY PLAN 1 OF 2Drawing · PDF11 Aug 2025View
DRAINAGE STRATEGY PLAN 2 OF 2Drawing · PDF11 Aug 2025View
UPDATED DRAINAGE STRATEGYBackGround Papers - Redacted · PDF10 Jun 2025View
SPEL SUDS SUSTAINABLE URBAN DRAINAGE DETAILSBackGround Papers - Redacted · PDF10 Jun 2025View
SPEL ESR BYPASS TREATMENT SYSTEM UPDATEDBackGround Papers - Redacted · PDF10 Jun 2025View
SCHEDULE OF CHANGESBackGround Papers - Redacted · PDF3 Jun 2025View
ALTAIR FVA REVIEWBackGround Papers - Redacted · PDF15 May 2025View
UPDATED DRAINAGE STRATEGY 22.04.2025BackGround Papers - Redacted · PDF22 Apr 2025View
APPLICATION FORM - REDACTEDApplication Form · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 07BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 08BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 09BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 10BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 11BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 12BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 13BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 14BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 15BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 16BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 17BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 18BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 19BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 20BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 21BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 22BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 23BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 24BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 01BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 02BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 03BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 04BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 05BackGround Papers - Redacted · PDF27 Feb 2025View
DESIGN & ACCESS STATEMENT PART 06BackGround Papers - Redacted · PDF27 Feb 2025View
LOCATION PLANDrawing · PDF27 Feb 2025View
PROPOSED BOUNDARY TREATMENT DETAILSDrawing · PDF27 Feb 2025View
DEMOLITION PLANDrawing · PDF27 Feb 2025View
EXISTING PLANS AND ELEVATIONSDrawing · PDF27 Feb 2025View
EXISTING SITE PLANDrawing · PDF27 Feb 2025View
FIRE STATEMENTBackGround Papers - Redacted · PDF27 Feb 2025View
UPDATE EXTENDED PHASE 1 HABITAT SURVEY, BUILDING INSPECTION, AND BIODIVERSITY NEBackGround Papers - Redacted · PDF27 Feb 2025View
CGI IMAGEBackGround Papers - Redacted27 Feb 2025View
SUBMISSION LETTERBackGround Papers - Redacted · PDF27 Feb 2025View
FINANCIAL VIABILITY STATEMENTBackGround Papers - Redacted · PDF27 Feb 2025View
AIR QUALITY ASSESSMENTBackGround Papers - Redacted · PDF27 Feb 2025View
SUPERSEDED DRAINAGE STRATEGY REPORTBackGround Papers - Redacted · PDF27 Feb 2025View
DRAINAGE LAYOUT SHEET 1BackGround Papers - Redacted · PDF27 Feb 2025View
DRAINAGE LAYOUT SHEET 2BackGround Papers - Redacted · PDF27 Feb 2025View
ACOUSTIC ASSESSMENTBackGround Papers - Redacted · PDF27 Feb 2025View
DAYLIGHT & SUNLIGHT STUDYBackGround Papers - Redacted · PDF27 Feb 2025View
LIGHTING IMPACT ASSESSMENTBackGround Papers - Redacted · PDF27 Feb 2025View
FLOOD RISK ASSESSMENTBackGround Papers - Redacted · PDF27 Feb 2025View
ARB METHOD STATEMENT AND TREE SURVEYBackGround Papers - Redacted · PDF27 Feb 2025View
TRANSPORT STATEMENTBackGround Papers - Redacted · PDF27 Feb 2025View
TRAVEL PLANBackGround Papers - Redacted · PDF27 Feb 2025View
ENERGY USAGE & SUSTAINABILITY STATEMENTBackGround Papers - Redacted · PDF27 Feb 2025View
STATEMENT OF COMMUNITY INVOLVEMENTBackGround Papers - Redacted · PDF27 Feb 2025View
BNG MATRIXBackGround Papers - Redacted27 Feb 2025View
PLANNING STATEMENTBackGround Papers - Redacted · PDF27 Feb 2025View
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT - PART 1BackGround Papers - Redacted · PDF27 Feb 2025View
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT - PART 2BackGround Papers - Redacted · PDF27 Feb 2025View
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT - PART 3BackGround Papers - Redacted · PDF27 Feb 2025View
PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT - PART 4BackGround Papers - Redacted · PDF27 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published

Appeal status: Unknown

Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.