Council planning record

To establish whether: Apartments - Acoustic Louvres omitted from elevations, Ground to First Floor Height reduced 300mm removed to reduce GF ceiling void overall building height reduced as a result, 4 course stacking soldier bond feature band reduced to 1 course at ground/first floor junction, Stacking solider course infill panels vertically between windows removed and replaced with flemish bond infill panels, Perforated sheet balustrade relaced with standard flat bar balustrade to resemble the rest of building, Brick panel between balconies dropped as railings are required to be 1.1m over the top of wall resulting in a height of 1.7m, Coloured/solid metal sheet balustrade above communal entrance door to block A/B to be replaced with standard flat bar balustrade, to match all other balustrading and increase natural light into plot, RWP hopper and horizontal connection from balcony to be added to elevation.Houses - Acoustic louvres omitted and Introduction of roof light to rear of housetypes 06,08,10 and 11.Site - Removal of backup generator shown adjacent plot 1, Plot 1 & 2 relocated 1675mm north west following removal of back up generator Single 1000kVA GRP substation can be consided as an non-material amendments to granted consent 22/01179/FULL.

Car Park 14 Laindon Link Basildon Essex

DecidedReference: 24/00959/NMABASBasildon Borough Council

Last published check: 11 Oct 2026, 12:09. Check the council record for more recent changes.

Application location

Car Park 14 Laindon Link Basildon Essex

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non-Material Amendment
Received
14 Aug 2024
Validated
15 Aug 2024
Determination deadline
12 Sept 2024
Local authority
Basildon Borough Council

Application overview

To establish whether: Apartments - Acoustic Louvres omitted from elevations, Ground to First Floor Height reduced 300mm removed to reduce GF ceiling void overall building height reduced as a result, 4 course stacking soldier bond feature band reduced to 1 course at ground/first floor junction, Stacking solider course infill panels vertically between windows removed and replaced with flemish bond infill panels, Perforated sheet balustrade relaced with standard flat bar balustrade to resemble the rest of building, Brick panel between balconies dropped as railings are required to be 1.1m over the top of wall resulting in a height of 1.7m, Coloured/solid metal sheet balustrade above communal entrance door to block A/B to be replaced with standard flat bar balustrade, to match all other balustrading and increase natural light into plot, RWP hopper and horizontal connection from balcony to be added to elevation.Houses - Acoustic louvres omitted and Introduction of roof light to rear of housetypes 06,08,10 and 11.Site - Removal of backup generator shown adjacent plot 1, Plot 1 & 2 relocated 1675mm north west following removal of back up generator Single 1000kVA GRP substation can be consided as an non-material amendments to granted consent 22/01179/FULL.

Proposal details

Reference
24/00959/NMABAS
Alternative references
PP-13330421
Ward
Lee Chapel North
Agent
IDPgroup

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 118 of 118

DocumentPublishedAction
APPLICATION FORM - REDACTEDApplication Form · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
EELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSEDDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTINGDrawing · PDF19 Aug 2024View
SITE PLAN_GROUND FLOOR_BLOCK TYPES_PLOT NUMBERSDrawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BB ELEVATION 4Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BB ELEVATION 3Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BB ELEVATION 2Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BB ELEVATION 1Drawing · PDF19 Aug 2024View
P05-PROPOSED GA FLOOR PLAN - FIFTH FLOOR PLAN 05Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - FOURTH FLOOR PLAN 04Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - THIRD FLOOR PLAN 03Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - SECOND FLOOR PLAN 02Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - FIRST FLOOR PLAN 01Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - GROUND FLOOR PLAN 00Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BA ELEVATION 4Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BA ELEVATION 3Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BA ELEVATION 2Drawing · PDF19 Aug 2024View
PROPOSED GA ELEVATION - BLOCK BA ELEVATION 1Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - FIFTH FLOOR PLAN 05Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - FOURTH FLOOR PLAN 04Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - THIRD FLOOR PLAN 03Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - SECOND FLOOR PLAN 02.Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - FIRST FLOOR PLAN 01Drawing · PDF19 Aug 2024View
PROPOSED GA FLOOR PLAN - GROUND FLOOR PLAN 00Drawing · PDF19 Aug 2024View
TERRACED_2-ELEVATIONS-SHEET 2 OF 2Drawing · PDF19 Aug 2024View
TERRACED_2-ELEVATIONS-SHEET 1 OF 2Drawing · PDF19 Aug 2024View
TERRACED_2-ROOF-B14Drawing · PDF19 Aug 2024View
TERRACED_2-FIRST FLOOR-B14Drawing · PDF19 Aug 2024View
TERRACED_2-GROUND FLOOR-B14Drawing · PDF19 Aug 2024View
SEMI_4-ELEVATIONS-B4 B9Drawing · PDF19 Aug 2024View
SEMI_4-ELEVATIONS-B4 B9Drawing · PDF19 Aug 2024View
SEMI-DETACHED_4-GROUND FLOOR-B4 B9Drawing · PDF19 Aug 2024View
SEMI_3-ELEVATIONS-B5 B7 B12 B13Drawing · PDF19 Aug 2024View
SEMI-DETACHED_3- FIRST FLOOR-B5 B7 B12 B13Drawing · PDF19 Aug 2024View
SEMI-DETACHED_3-GROUND FLOOR-B5 B7 B12 B13Drawing · PDF19 Aug 2024View
SEMI_2-ELEVATIONS-B6 B8 B10 B11Drawing · PDF19 Aug 2024View
SEMI-DETACHED_2-ROOF-B6 B8 B10 B11Drawing · PDF19 Aug 2024View
SEMI-DETACHED_2-SECOND FLOOR-B6 B8 B10 B11Drawing · PDF19 Aug 2024View
SEMI-DETACHED_2-FIRST FLOOR-B6 B8 B10 B11Drawing · PDF19 Aug 2024View
SEMI-DETACHED_2-GROUND FLOOR-B6 B8 B10 B11Drawing · PDF19 Aug 2024View
TERRACE_1-B3-ELEVATIONS-SHEET 2 OF 2Drawing · PDF19 Aug 2024View
TERRACE_1-B3-ELEVATIONS-SHEET 1 OF 2.Drawing · PDF19 Aug 2024View
TERRACE_1-B2-ELEVATIONS-SHEET 2 OF 2Drawing · PDF19 Aug 2024View
TERRACE_1-B2-ELEVATIONS-SHEET 1 OF 2Drawing · PDF19 Aug 2024View
TERRACE_1-SECOND FLOOR-B2 B3Drawing · PDF19 Aug 2024View
TERRACE_1-FIRST FLOOR-B2 B3Drawing · PDF19 Aug 2024View
TERRACE 1-GROUND FLOOR-B2 B3Drawing · PDF19 Aug 2024View
SEMI_1-ELEVATIONS-B1Drawing · PDF19 Aug 2024View
SEMI-DETACHED_1-SECOND FLOOR-B1Drawing · PDF19 Aug 2024View
SEMI-DETACHED_1-FIRST FLOOR-B1Drawing · PDF19 Aug 2024View
SITE PLAN GROUND FLOOR PLOT NUMBERS AND LEVELSDrawing · PDF19 Aug 2024View
SEMI DETACHED 1 GROUND FLOOR B1Drawing · PDF19 Aug 2024View
TOWNHOUSE 01 T3 ELEVATIONDrawing · PDF19 Aug 2024View
TOWNHOUSE 01 T3 FLOOR PLANSDrawing · PDF19 Aug 2024View
TERRACED HOUSE T14 ELEVATIONDrawing · PDF19 Aug 2024View
TERRACED HOUSE T14 FLOOR PLANSDrawing · PDF19 Aug 2024View
SEMI-DETACHED 03 T4 ELEVATIONDrawing · PDF19 Aug 2024View
SEMI-DETACHED 03 T9 ELEVATIONDrawing · PDF19 Aug 2024View
SEMI-DETACHED 03 T4 AND T9 FLOOR PLANSDrawing · PDF19 Aug 2024View
SEMI-DETACHED 02 T5 T7 T12 AND T13 ELEVATIONDrawing · PDF19 Aug 2024View
SEMI-DETACHED 02 T5 T7 T12 AND T13 FLOOR PLANSDrawing · PDF19 Aug 2024View
SEMI-DETACHED 01 T6 T8 T10 AND T11 ELEVATIONDrawing · PDF19 Aug 2024View
SEMI-DETACHED 01 T6 T8 T10 AND T11 FLOOR PLANSDrawing · PDF19 Aug 2024View
TOWNHOUSE 02 T1 ELEVATIONDrawing · PDF19 Aug 2024View
TOWNHOUSE 02 T1 FLOOR PLANSDrawing · PDF19 Aug 2024View
TOWNHOUSE 01 T2 ELEVATIONDrawing · PDF19 Aug 2024View
TOWNHOUSE 01 T2 FLOOR PLANSDrawing · PDF19 Aug 2024View
SITE GROUND FLOOR LEVELS PLANDrawing · PDF19 Aug 2024View
SITE GROUND FLOOR PLANDrawing · PDF19 Aug 2024View
BLOCK B WEST ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK B SOUTH ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK B EAST ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK B NORTH ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK B TYPICAL FLOOR PLAN 1ST-4THDrawing · PDF19 Aug 2024View
BLOCK B FIFTH FLOOR PLANDrawing · PDF19 Aug 2024View
BLOCK B GROUND FLOOR PLANDrawing · PDF19 Aug 2024View
BLOCK A WEST ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK A SOUTH ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK A EAST ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK A NORTH ELEVATIONDrawing · PDF19 Aug 2024View
BLOCK A TYPICAL FLOOR PLAN 1ST-4THDrawing · PDF19 Aug 2024View
BLOCK A FIFTH FLOOR PLANDrawing · PDF19 Aug 2024View
BLOCK A GROUND FLOOR PLANDrawing · PDF19 Aug 2024View
CAR PARK 14 COMPARISON DOCUMENTBackGround Papers - Redacted · PDF19 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Granted

Appeal status: Unknown

Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.