ApprovedCouncil status: Decided

To establish whether an increase in overall building height by 1575mm and 1725mm at first floor level to accommodate a steel frame construction, removal of colonnade from the western elevation, re-alignment of south library wall with the first floor fa�ade, removal of overhang on eastern fa�ade, variation of window layouts, locations and sizes, revision to brickwork, a new substation and installation of a backup generator on the roof, can be considered as non-material amendments to planning permission 23/01082/FULL

Pitsea Leisure Centre Maydells Pitsea Essex SS13 3DU

Basildon Borough CouncilReference 24/00569/NMABASNon-Material Amendment

Last published check: 24 Oct 2026, 13:50. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 24 Oct 2026, 13:50 (UK)

  1. DoneReceived20 May 2024
  2. DoneValidated13 Jun 2024
  3. Not publishedConsultationNo date on council record
  4. Date set by councilAgreed decision date25 Jul 2024
  5. DecidedGranted25 Jul 2024

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Non-Material Amendment
Ward
Pitsea South East
Documents
18 published

Proposal

To establish whether an increase in overall building height by 1575mm and 1725mm at first floor level to accommodate a steel frame construction, removal of colonnade from the western elevation, re-alignment of south library wall with the first floor fa�ade, removal of overhang on eastern fa�ade, variation of window layouts, locations and sizes, revision to brickwork, a new substation and installation of a backup generator on the roof, can be considered as non-material amendments to planning permission 23/01082/FULL

Reference
24/00569/NMABAS
Alternative references
PP-13078767
Ward
Pitsea South East
Agent
Ingleton Wood

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • COMMITTEE REPORTCommittee Report25 Jul 2024View
  • DECISION LETTERDecision25 Jul 2024View
  • GENERATOR DETAILSDrawing1 Jul 2024View
  • GENERATOR DATASHEETBackGround Papers - Redacted1 Jul 2024View
  • PROPOSED SUBSTATION DETAILSDrawing27 Jun 2024View
  • APPLICATION FORM - REDACTEDApplication Form20 May 2024View
  • ELEVATIONSDrawing20 May 2024View
  • VISUALSDrawing20 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted

Appeal status: Unknown

DECISION LETTER

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.