Wales · National park authority

Bannau Brycheiniog National Park
Planning applications.

Explore collected planning applications and decisions for Bannau Brycheiniog National Park. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
8,649Searchable applications
213Recorded as pending
93%Approval rate · 7,197 approved or refused records
470Refused applications

6,727 approved · 470 refused · 553 withdrawn. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas5 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Approved24/23495/FUL

    Proposed replacement garage, workshop, store and home gym.

    Pentwyn Farm Pant Coedprior Llanellen NP7 9LB

    Received Not published
  2. Approved25/23496/LBC

    Dismantle and rebuild the south-west chimney stack

    12 Priory Hill Brecon LD3 9DH

    Received Not published
  3. Awaiting decision25/23498/FUL

    Change of Use from Use C2/D1 (Sui Generis) to Class C5 (Dwellinghouse, used otherwise than as a sole or main residence) forming part of the Buckland Estate

    Buckland Hall Bwlch Brecon LD3 7JJ

    Received Not published
  4. Approved25/23499/TPO

    Pruning 2 Oak tree situated on bank above property currently posing a safety risk. Tree 1 has a TPO T1 of DC/018.17. Proposed works consist of;T1 - Crown reduction by up to 2m (2.5m within the upper crown) to reduce weight/wind loading. Sever and strip IvyT2 - Remove Ivy and keep the tree Ivy free, Remove dead wood posing a risk, Reduce crown by up to 3m to reduce sail area and leverage, Review tree physiological condition three yearly

    Pontysgob Mill Forest Coal Pit Abergavenny NP7 7LS

    Received Not published
  5. Approved25/23500/FUL

    Demolish existing rear facing balcony at first floor level and replace with new rear balcony at first floor level, to existing detached residential property.

    31 Oakfield Drive Crickhowell NP8 1DR

    Received Not published
  6. Refused25/23501/CON

    Conversion of the adjoining stone barn to create ancillary accommodation for the farmhouse. - Variation of condition 2 (approved plans) pursuant to application 23/21687/FUL to Replace Drawing Number '143-GA-01 Rev A' with '143-GA-01 Existing and Proposed Plans and Elevations'.

    Cilhelig Farm Cwm-Du Crickhowell NP8 1RU

    Received Not published
  7. Awaiting decision25/23503/FUL

    Part conversion of former agricultural barn into a holiday let including provision for a small amenity area (C6) and associated installation of a new foul water drainage system. The proposal neighbours listed buildings and their curtilage.

    Manest Court Llanhamlach Brecon LD3 7YD

    Received Not published
  8. Awaiting decision25/23504/LBC

    Part conversion of former agricultural barn into a holiday let including provision for a small amenity area (C6) and associated installation of a new foul water drainage system. The proposal neighbours listed buildings and their curtilage.

    Manest Court Llanhamlach Brecon LD3 7YD

    Received Not published
  9. Approved25/23505/FUL

    Conversion of an existing one-bedroom equine holiday let and stable block into two, 2-bedroom holiday lets and a communal games room.

    Castell Prydydd Cefn Goleu Ninfa Llanellen Monmouthshire NP7 9LE

    Received Not published
  10. Approved25/23507/DISCON

    Discharge of condition 3 pursuant to approved application 23/22000/CON - Variation of condition 3 pursuant to approved Listed Building Consent 22/21514/LBC

    Castle Of Brecon Hotel Castle Square Brecon LD3 9DB

    Received Not published
  11. Decided25/23508/CPL

    Use of the building for a licenced civil ceremony with up to 8 guests on the 26 July 2025 between the hours of 1pm and 5pm.

    Ynisfaen Cwmwysg Trecastle Brecon LD3 8YF

    Received Not published
  12. Approved25/23511/LBC

    Proposed removal of external ATM and signage

    38 High Street Superior Brecon LD3 7AR

    Received Not published
  13. Approved25/23515/FUL

    Rear elevation first floor extension, to provide bedroom and bathroom facility.

    Blaencwm Cottage Upper Cwm Nant Gam Llanelly Hill NP7 0RF

    Received Not published
  14. Approved25/23516/FUL

    Replacement of existing defective flat roof resulting increase in height, alteration to window openings and alteration of profile of rear elevation.

    3 Beaufort Avenue Llangattock Crickhowell NP8 1PN

    Received Not published
  15. Approved25/23517/FUL

    Single storey side extension.

    20 Pencommin Estate Llangynidr Crickhowell NP8 1LT

    Received Not published
  16. Approved25/23521/LBC

    1) Replacement of one top floor window; 2) Installation of an extractor fan on the external wall to the bathroom; 3) Removal of gypsum plaster and plasterboard in kitchen, utility room, study and top bedroom. Replace with wood wool boards and lime plaster; 4) Replacement of existing obsolete heating system with a system boiler and flue through the external side wall; 5) Replacement of asbestos-containing garage roof with rubber roof and green roof matting; 6) Removal of casement window at the rear of the garage and replace with a door; 7) Relocate and replacing rear outdoor light.

    Buckingham Place 1 Buckingham Place Brecon Powys LD3 7DL

    Received Not published
  17. Unknown25/23431/PAR

    Roof Covered Manure Storage Area.

    Caerllwyn Farm Glasfynydd Trecastle Brecon LD3 8YD

    Received Not published
  18. Decided25/23526/AGR

    Proposed new steel framed hay and straw building.

    Great House Farm Great House Lane Triley Llantilio Pertholey NP7 6PB

    Received Not published
  19. Approved25/23528/LBC

    Strip up the existing roof covering back to the roof structure and recover with an IKO bitumen felt systemRetain and repair the existing lead cover flashings around the interior of the parapet wallsCarefully remove all stained, loose and eroded lime mortar pointing and re-point with new lime mortar to match existingReplace all rainwater pipes and hopper heads with new cast iron replacementsSupply and fit new steel access ladder and platform to provide internal access from roof 1 to roof 2 (no previous access available)Replace 4No. timber doors with pre-finished steel steel to match existing size and styleCarryout some minor repair of stonework to the front elevation facing Watton RoadCarryout repairs to existing render finishes which have eroded

    The Barracks Watton Brecon LD3 7EA

    Received Not published
  20. Unknown25/23494/PAR

    A permanent polytunnel measuring to approximately 283m2 constructed of steel hoops with timber base and side rails, covered with superthermic polythene (green to 1m and white above).

    Troed-y-Harn Talgarth Brecon Powys

    Received Not published
  21. Unknown25/23531/TRCA

    The proposed works are to carry on the management of the multi-stemmed hazel. Having consulted a tree expert, they inform us that it is standard practise to coppice hazel at the base. He advised us that it is better for the tree to be coppiced at the ground rather than at an above ground height. Last year we took the height of the hazel down to 1.8 metres and the tree responded well to the pruning. However as you can see from the photo attached nearly all the new growth is sprouting from the large branches. The result is that there are multiple young stems/suckers which are quite congested growing out of the top and sides. We propose coppicing the tree properly, approx 5-10 cm from the ground. This will allow the new growth to sprout from the ground up in the traditional way. Going forward, as advised by the tree expert, we would then be able to leave the hazel to grow for a few years before it would need to be coppiced again.As stated last year the plot had been used as an allotment in the past and we are trying to reinstate that.Historically we assume a hazel was grown there, or left to grow there, to provide hazel branches for plant supports. We would like to do the same and will use any removed stems in the garden.

    Old Allotments Booth Gardens Heol Y Dwr Hay-On-Wye HR3 5BH

    Received Not published
  22. Approved25/23532/FUL

    Construction of agricultural slurry tank to comply with latest CoAP regulations

    Lower Stanton Farm Llanvihangel Crucorney Abergavenny NP7 7NB

    Received Not published
  23. Decided25/23533/AGR

    New farm shed for the storage of machinery and feed stock etc.

    The Birches Oak Lane Llanellen NP7 9LD

    Received Not published
  24. Approved25/23534/FUL

    Provide dormers to front elevation and replacement of front extension

    Ty Doggan Ffawyddog Crickhowell NP8 1PY

    Received Not published

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Bannau Brycheiniog National Park

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Bannau Brycheiniog National Park, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage