Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Fferm Wynt Lluest Y Gwynt Wind Farm Close To The Village Of Ponterwyd East Of Aberystwyth Ceredigion
Last published check: 13 Oct 2026, 21:06. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceInstallation of a wind farm and grid connection, together with associated equipment, infrastructure and ancillary works:1. To deregister an area of approximately 38.34 hectares on Drybedd Common (CL28) (in the Community of Ceiro, Ponterwyd) and provide replacement land of approximately 03.75 hectares (RLP1), 16.51 hectares (RLP2), 07.28 hectares (RLP3) and 11.2 hectares (RLP4) on four separate parcels of land in the Community of Ceiro, Ponterwyd. The release land is required to facilitate the construction and operation of the Lluest y Gwynt Wind Farm.2. To deregister an area of approximately 15.05 hectares on Yr Ochrydd Common (CL84) (in the Community of Eisteddfa Gurig, Ponterwyd) and provide replacement land of approximately 01.69 hectares (RLP5) and 20.69 hectares (RLP6) on two separate parcels of land in the Community of Eisteddfa Gurig, Ponterwyd. The release land is required to facilitate the construction and operation of the Lluest y Gwynt Wind Farm.3. To carry out restricted works on Drybedd Common (CL28), Banc Bwa-drain Common (CL75) and Yr Ochrydd Common (CL84) namely temporary open trenching with full reinstatement for the installation of underground cabling for a grid connection and temporary fencing for health and safety and animal welfare requirements and stock-proof fencing for the protection of peat restoration areas.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsFferm Wynt Lluest Y Gwynt Wind Farm Close To The Village Of Ponterwyd East Of Aberystwyth Ceredigion
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| Admin emailDevMon · PDF | 24 Jun 2026 | View |
| Design and access statementSupportingDocs · PDF | 7 May 2026 | View |
| Common land reportSupportingDocs · PDF | 7 May 2026 | View |
| Common land applications overview plan (sheet 2)SupportingDocs · PDF | 7 May 2026 | View |
| Common land applications overview plan (sheet 1)Plans · PDF | 7 May 2026 | View |
| Collaborative benefits reportSupportingDocs · PDF | 7 May 2026 | View |
| Cl84 unilateral undertakingSupportingDocs · PDF | 7 May 2026 | View |
| Cl84 s.38 application planSupportingDocs · PDF | 7 May 2026 | View |
| Cl84 s.38 application formSupportingDocs · PDF | 7 May 2026 | View |
| Cl84 s.16 application plan (sheet 2)SupportingDocs · PDF | 7 May 2026 | View |
| Cl84 s.16 application plan (sheet 1)SupportingDocs · PDF | 7 May 2026 | View |
| Cl84 s.16 application formSupportingDocs · PDF | 7 May 2026 | View |
| Cl84 landowner letter of consentSupportingDocs · PDF | 7 May 2026 | View |
| Cl75 s.38 application planSupportingDocs · PDF | 7 May 2026 | View |
| Cl75 s.38 application formSupportingDocs · PDF | 7 May 2026 | View |
| Cl75 landowner letter of consentSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 unilateral undertakingSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 s.38 application planSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 s.38 application formSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 s.16 application planSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 s.16 application formSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 landowner letter of consentSupportingDocs · PDF | 7 May 2026 | View |
| Application formApplication Form · PDF | 7 May 2026 | View |
| Acceptance of notification noticeSupportingDocs · PDF | 7 May 2026 | View |
| Notiff004 - acceptance of notificationSupportingDocs · PDF | 7 May 2026 | View |
| Notiff003 - cover letterSupportingDocs · PDF | 7 May 2026 | View |
| Notiff002 - site locationSupportingDocs · PDF | 7 May 2026 | View |
| Notiff001 - notification of developmentSupportingDocs · PDF | 7 May 2026 | View |
| Eia scoping direction addendumSupportingDocs · PDF | 7 May 2026 | View |
| Figure 3 - designationsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 2 - development boundary for grid connectionSupportingDocs · PDF | 7 May 2026 | View |
| Figure 1 - site locationSupportingDocs · PDF | 7 May 2026 | View |
| 01 - scoping report addendum cover letter - july 2023SupportingDocs · PDF | 7 May 2026 | View |
| 00 - scoping report addendumSupportingDocs · PDF | 7 May 2026 | View |
| 3246727 - lluest y gwynt - pre-application adviceSupportingDocs · PDF | 7 May 2026 | View |
| Dns 3246727 - scoping direction w. appendixSupportingDocs · PDF | 7 May 2026 | View |
| Dns 3246727 - eia scoping report - redactedSupportingDocs · PDF | 7 May 2026 | View |
| Plans accompanying scoping reportSupportingDocs · PDF | 7 May 2026 | View |
| Eia scoping request cover letter (redacted)SupportingDocs · PDF | 7 May 2026 | View |
| Lluest y gwynt wind farm - inception meeting noteSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-5 - baseline non breeding bird surveys 2025 summary reportSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-4 - outline breeding bird protection planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-3 - ornithology hraSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-2 - collision mortality risk analysisSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-1 - ornithology report part 3SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-1 - ornithology report part 2SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 9-1 - ornithology report part 1SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-7 - outline habitat management planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-6 - ecology habitat regulations assessment hraSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-4 - other taxa reportSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-3 - terrestrial mammals reportSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-2 - bat reportSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-1 - habitat and vegetation report part 6SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-1 - habitat and vegetation report part 5SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-1 - habitat and vegetation report part 4SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-1 - habitat and vegetation report part 3SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-1 - habitat and vegetation report part 2SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-1 - habitat and vegetation report part 1SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 7-4 - regression analysis figuresSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 7-3 - time history figuresSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 7-1 - calibration certificatesSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-9 - cumulative visual effectsSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-8 - night-time landscape and visual effects part 2 figures 4a-eSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-8 - night-time landscape and visual effects part 1SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-7 - rvaaSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-6 - effects on viewpointsSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-5 - effects on landscape characterSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-4 - landmap filtering exerciseSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-3 - special landscape areasSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-2 - visualisation methodologSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-10 - comparative wireframesSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 6-1 - lvia methodologySupportingDocs · PDF | 7 May 2026 | View |
| Appendix 5-3 - listed building consent hiaSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 5-2 - grid connection detailed descriptionSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 2-3 - scoping direction addendum 2023SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 2-2 - post scoping consultationSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 2-1 - full scoping direction 2020SupportingDocs · PDF | 7 May 2026 | View |
| Appendix 16-1 - forestry site assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 14-1 - annex cSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 14-1 - annex bSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 14-1 - annex aSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 13-1 - lighting and mitigation reportSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 12-4 - asidohlSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 12-3 - photographic records from the site visitSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 12-2b - non designated assets - grid connectionSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 12-2a - non designated assets - wind farmSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 12-1 - heritage impact assessment methodologySupportingDocs · PDF | 7 May 2026 | View |
| Appendix 11-6 - outline decommissioning planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 11-5 - outline borrow pit restoration planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 11-4 - soil management planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 11-3 - peat slide risk assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 11-2 - outline peat management planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 11-1 - carbon balance assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-7 - land quality assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-6 - gwdte assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-5 - water frameworks directive assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-4 - watercourse crossings assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-3 - private water supplies risk assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-2 - outline surface water drainage planSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-7 d - non-breeding bird survey resultsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-7 c - waterbird vantage point survey results - target speciesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-7 b - non-breeding bird walkover survey 2025SupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-7 a - waterbird vantage point survey 2025SupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-4 e - target species yr 2 waders waterfowl and gullsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-4 d - target species yr 2 kestrel and other raptorsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-4 c - target species yr 2 red kiteSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-4 b - target species - other speciesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-4 a - target species - red kiteSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-3 - statutory designated sitesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-2 b - ornithology survey areas - grid connectionSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-2 a - ornithology survey areas - wind farmSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-1 b - vantage points and viewsheds 30m offsetSupportingDocs · PDF | 7 May 2026 | View |
| Figure 9-1 a - vantage points and viewsheds 10m offsetSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-8 - updated phase 1 habitat surveySupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-7 - site layoutSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-6 - non statutory designated sitesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-5 - statutory designated sitesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-4 - phase 1 grid connectionSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-3 - phase 1 habitat wind farmSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-2 - phase 1 habitat wind farmSupportingDocs · PDF | 7 May 2026 | View |
| Figure 8-1 - nvc pages 1 to 15SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 q - viewpoint 17SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 p - viewpoint 16SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 o - viewpoint 15SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 n - viewpoint 14SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 m - viewpoint 13SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 l - viewpoint 12SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 k - viewpoint 11SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 j - viewpoint 10SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 i - viewpoint 9SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 h - viewpoint 8SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 g - viewpoint 7SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 f - viewpoint 6SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 e - viewpoint 5SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 d - viewpoint 4SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 c - viewpoint 3SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 b - viewpoint 2SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-9 a - viewpoint 1SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-8 c - cumulative ztv - operational consented and planning stage schemesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-8 b - cumulative ztv - operational and consented schemesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-8 a - cumulative ztv (operational schemes)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-7 b - cumulative schemes (10km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-7 a - cumulative schemesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-6 c - hsa ztv (10km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-6 b - hsa ztv (20km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-6 a - hsa ztv (45km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-5 c - vsa ztv (10km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-5 b - vsa ztv (20km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-5 a - vsa ztv (45km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-4 c - blade tip ztv (10km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-4 b - blade tip ztv (20km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-4 a - blade tip ztv (45km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-3 c - hub ztv (10km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-3 b - hub ztv (20km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-3 a - hub ztv (45km radius)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-2 c - landmap visual & sensory aspect areas assessed in detailSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-2 b - landscape character (20km)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-2 a - landscape character (45km)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-12 a-g - photographs a-fSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-11 - grid connection routeSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-10 a-q - 360 cumulative wiresSupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-1 c - landscape designations (5km)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-1 b - landscape designations (15km)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 6-1 a - landscape designations (45km)SupportingDocs · PDF | 7 May 2026 | View |
| Figure 5-1-1 - wind farm site layoutSupportingDocs · PDF | 7 May 2026 | View |
| Figure 5-1 - site layoutSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-4 - grid connection route optionsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-3 - site entrance optionsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-2-4 - pac site layoutSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-2-3 - previous layouts peat and nvc constraintsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-2-2 - peat and nvc constraintsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-2-1 -technical and environmental constraintsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-1-4 - preliminary layout 12 turbinesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-1-3 - preliminary layout 15 turbinesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-1-2 - preliminary layout 22 turbinesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 4-1-1 - preliminary layout 28 turbinesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 19-1 - shadow flicker propertiesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 18-3 - proposed waymarked routeSupportingDocs · PDF | 7 May 2026 | View |
| Figure 18-2 - common landSupportingDocs · PDF | 7 May 2026 | View |
| Figure 18-1 - public rights of waySupportingDocs · PDF | 7 May 2026 | View |
| Figure 16-5 - proposed fellingSupportingDocs · PDF | 7 May 2026 | View |
| Figure 16-4 - nrw fellingSupportingDocs · PDF | 7 May 2026 | View |
| Figure 16-3 - nrw baselineSupportingDocs · PDF | 7 May 2026 | View |
| Figure 16-2 - study areaSupportingDocs · PDF | 7 May 2026 | View |
| Figure 16-1 - nrw longterm objectivesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 15-1 - socio economic study areaSupportingDocs · PDF | 7 May 2026 | View |
| Figure 14-4 - abnormal load delivery routeSupportingDocs · PDF | 7 May 2026 | View |
| Figure 14-2 - traffic count locationsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 14-1 - study areaSupportingDocs · PDF | 7 May 2026 | View |
| Figure 12-6 - heritage trailSupportingDocs · PDF | 7 May 2026 | View |
| Figure 12-5a-j - grid connection and heritage assetsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 12-4 - ztv and designated assetsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 12-3 - hlcaSupportingDocs · PDF | 7 May 2026 | View |
| Figure 12-2 - sm and lbs within 5kmSupportingDocs · PDF | 7 May 2026 | View |
| Figure 12-1 - cultural heritageSupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-5 - peat impact assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-4 - peat sensitivitySupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-3c - surveyed peat depthsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-3b - surveyed peat depthSupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-3a - surveyed peat depthsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-2 - phase 1 surveyed peat depthsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 11-1 - peatlands of walesSupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-6 - hydrological constraints mapSupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-5 - nrw pluvial flood risk mapSupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-4 - nrw fluvial flood risk mapSupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-3 - surface water catchment and sub catchmentsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-2b - bedrock geologySupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-2a - superficial depositsSupportingDocs · PDF | 7 May 2026 | View |
| Figure 10-1 - site layoutSupportingDocs · PDF | 7 May 2026 | View |
| Figure 1-1 - site locationSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 8 - ecologySupportingDocs · PDF | 7 May 2026 | View |
| Chapter 6 - landscape and visual impact assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 3 - legislative and policy frameworkSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 20 - in combination effects residual effects mitigation and enhancementSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 2 - environmental impact assessment process & methodologySupportingDocs · PDF | 7 May 2026 | View |
| Chapter 19 - shadow flickerSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 16 - forestrySupportingDocs · PDF | 7 May 2026 | View |
| Chapter 12 - archaeology and cultural heritageSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 1 - introductionSupportingDocs · PDF | 7 May 2026 | View |
| Site notice (saesneg)SupportingDocs · PDF | 7 May 2026 | View |
| Site notice (cymraeg)SupportingDocs · PDF | 7 May 2026 | View |
| Reps001 - national gas transmissionSupportingDocs · PDF | 7 May 2026 | View |
| Exnote001 - acceptance noticeSupportingDocs · PDF | 7 May 2026 | View |
| Cl28 & cl84 s.16 plansSupportingDocs · PDF | 7 May 2026 | View |
| Environmental statement completeness report (english)SupportingDocs · PDF | 7 May 2026 | View |
| Environmental statement completeness report (cymraeg)SupportingDocs · PDF | 7 May 2026 | View |
| Es completeness response letterSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 8-5 - pre-application validation survey and update data search reportSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 7-6 - construction assessment tablesSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 7-5 - assessment of effects figuresSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 7-2 - survey installation photographsSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 5-1 - outline construction environmental management planSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 14-1 - transport assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 12-5 - scheduled monument viewpointsSupportingDocs · PDF | 7 May 2026 | View |
| Appendix 10-1 - flood consequence assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Figure 5-2 to 5-12 - civils infrastructureSupportingDocs · PDF | 7 May 2026 | View |
| Figure 5-1-2 - grid site layoutSupportingDocs · PDF | 7 May 2026 | View |
| Figure 14-3 - personal injury accident locationsSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 9 - ornithologySupportingDocs · PDF | 7 May 2026 | View |
| Chapter 7 - noise assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 5 - description of proposed developmentSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 4 - site selection and project evolutionSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 18 - other environmental issuesSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 17 - air quality climate and carbon balance assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 15 - socio economic impact assessmentSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 14 - transport and accessSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 13 - aviation and telecommunicationsSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 11 - peat and soilsSupportingDocs · PDF | 7 May 2026 | View |
| Chapter 10 - hydrology hydrogeology and geologySupportingDocs · PDF | 7 May 2026 | View |
| Environmental statement - non technical summary (english)SupportingDocs · PDF | 7 May 2026 | View |
| Environmental statement - non technical summary (cymraeg)SupportingDocs · PDF | 7 May 2026 | View |
| Environmental statement completeness report (english)SupportingDocs · PDF | 7 May 2026 | View |
| Environmental statement completeness report (cymraeg)SupportingDocs · PDF | 7 May 2026 | View |
| Planning statementSupportingDocs · PDF | 7 May 2026 | View |
| Application covering letterApplication Form · PDF | 7 May 2026 | View |
| Written statement on the installation of an electric line above groundSupportingDocs · PDF | 7 May 2026 | View |
| Written statement about secondary consentsSupportingDocs · PDF | 7 May 2026 | View |
| Summary of the statements of common groundSupportingDocs · PDF | 7 May 2026 | View |
| Section 106 heads of termsSupportingDocs · PDF | 7 May 2026 | View |
| S.38 common land designationsSupportingDocs · PDF | 7 May 2026 | View |
| S.16 common land designationsSupportingDocs · PDF | 7 May 2026 | View |
| Pre-application consultation (pac) reportSupportingDocs · PDF | 7 May 2026 | View |
| Pac report appendix 5 (part 3)SupportingDocs · PDF | 7 May 2026 | View |
| Pac report appendix 5 (part 2)SupportingDocs · PDF | 7 May 2026 | View |
| Pac report appendix 5 (part 1)SupportingDocs · PDF | 7 May 2026 | View |
| Notice under article 16SupportingDocs · PDF | 7 May 2026 | View |
| Green infrastructure statementSupportingDocs · PDF | 7 May 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.