Council planning record

Detailed application for a mixed-use development comprising;- film/ TV Studios with associated post-production offices and workshop and media village (18,845 sqm) (Use Class B1); a hotel (Use Class C1) including ancillary space and circa 62 serviced apartments (Use Class C3) (max. 112m AOD); a multi-storey carpark (max. 62m AOD); change of use, internal and external alterations to the listed Locomotive Shed buildings, including increasing the height by an additional two-storeys (max. 62m AOD), to provide flexible commercial floorspace (7,185 sqm) for use in connection with the film/TV studios (Use Class B1/ D1) including 265 sqm café (Use Class A3) and circa 302 residential units (Use Class C3) and internal parking spaces; change of use, internal and external alterations to listed Engine Shed building, including increasing the height by an additional two storeys (max.53m AOD) , to provide (2,605 sqm) flexible commercial space (Use Class B1/ D2/A3) and; change of use, internal and external alterations of the Paint Shop building, Acetylene Store and Clock Tower listed buildings to provide ancillary uses to the film/TV studios (Use Class B1); plus associated infrastructure including open space, landscape and public realm provision, external parking, servicing, pedestrian and vehicular access and associated engineering, utilities and infrastructure works. INCLUDES AMENDED DESCRIPTION

Newtown Railway Works, Newtown Road, Ashford, Kent, TN24 0PN

Decision MadeReference: 19/01476/ASAshford Borough Council

Application location

Newtown Railway Works, Newtown Road, Ashford, Kent, TN24 0PN

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Full planning permission
Received
17 Oct 2019
Validated
16 Oct 2019
Determination deadline
5 Feb 2020
Local authority
Ashford Borough Council

Application overview

Detailed application for a mixed-use development comprising;- film/ TV Studios with associated post-production offices and workshop and media village (18,845 sqm) (Use Class B1); a hotel (Use Class C1) including ancillary space and circa 62 serviced apartments (Use Class C3) (max. 112m AOD); a multi-storey carpark (max. 62m AOD); change of use, internal and external alterations to the listed Locomotive Shed buildings, including increasing the height by an additional two-storeys (max. 62m AOD), to provide flexible commercial floorspace (7,185 sqm) for use in connection with the film/TV studios (Use Class B1/ D1) including 265 sqm café (Use Class A3) and circa 302 residential units (Use Class C3) and internal parking spaces; change of use, internal and external alterations to listed Engine Shed building, including increasing the height by an additional two storeys (max.53m AOD) , to provide (2,605 sqm) flexible commercial space (Use Class B1/ D2/A3) and; change of use, internal and external alterations of the Paint Shop building, Acetylene Store and Clock Tower listed buildings to provide ancillary uses to the film/TV studios (Use Class B1); plus associated infrastructure including open space, landscape and public realm provision, external parking, servicing, pedestrian and vehicular access and associated engineering, utilities and infrastructure works. INCLUDES AMENDED DESCRIPTION

Proposal details

Reference
19/01476/AS
Ward
Aylesford & East Stour
Parish
South Willesborough & Newtown
Agent
Miss L O'Carroll

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 591 of 591

DocumentPublishedAction
SITE INVESTIGATION WORKS REPORT - APPENDIX 13.3 2 OF 2Supporting Documents · PDF18 Oct 2019View
TRANSPORT ASSESSMENT - APPENDICES L-SSupporting Documents · PDF17 Oct 2019View
LOCOMOTIVE SHED FIRST FLOOR PLAN (3) - 200.12Plans · PDF18 Oct 2019View
PLANNING STATEMENTSupporting Documents · PDF18 Oct 2019View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 10 LVIA 2 OF 2Supporting Documents · PDF18 Oct 2019View
BREEAM PRE-ASSESSMENT REPORTSupporting Documents · PDF17 Oct 2019View
DESIGN & ACCESS STATEMENT - PART 5Supporting Documents · PDF17 Oct 2019View
NATURAL ENGLANDConsultee · PDF27 Nov 2019View
ENGINE SHED - SIDE ELEVATIONS - RETENTION & RESTORATION - 900.32 P1Plans · PDF26 Feb 2020View
RESPONSE TO CONSULTATION RESPONSES FROM KCC DATED 4TH FEBRUARY 2020Supporting Documents · PDF20 Feb 2020View
NATURAL ENGLANDConsultee · PDF25 Feb 2020View
SOUTHERN WATERConsultee · PDF5 Mar 2020View
WIND MICROCLIMATE DESKTOP ASSESSMENTSupporting Documents · PDF17 Oct 2019View
EMMA OWENGeneral Comment · PDF11 Nov 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-39Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-25Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED GROUND FLOOR PLAN (2) - 200.01Plans · PDF18 Oct 2019View
HOTEL - ELEVATION B - 410.10Plans · PDF18 Oct 2019View
KENT FIRE & RESCUE SERVICEConsultee · PDF6 Nov 2019View
SCENE 1Supporting Documents · PDF17 Oct 2019View
SUSTAINABILITY STATEMENTSupporting Documents · PDF17 Oct 2019View
ENGINE SHED - REAR ELEVATION - RETENTION & RESTORATION - 900.31 P1Plans · PDF26 Feb 2020View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - PART 2Supporting Documents · PDF19 Feb 2020View
PAINT SHOP BUILDING - RETENTION & RESTORATION - 900.60 P1Plans · PDF26 Feb 2020View
KCC: FLOOD & WATER MANAGEMENTConsultee · PDF13 Nov 2019View
DESIGN & ACCESS STATEMENT - PART 6Supporting Documents · PDF17 Oct 2019View
ENVIRONMENTAL PROTECTIONConsultee · PDF6 Mar 2020View
EXISTING SITE PLAN - 19.020.100.02 P2Amended Drawing · PDF28 May 2020View
VIABILITY REPORT REVIEWSupporting Documents · PDF6 Jan 2022View
FILM STUDIOS - ELEVATION 1 - 510.00 P1Plans · PDF18 Oct 2019View
STUART BROWNObjection Comment · PDF15 Nov 2019View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - APPENDICES E-JSupporting Documents · PDF18 Oct 2019View
FILM STUDIOS - SECTION 1 - 520.00Plans · PDF18 Oct 2019View
STRUCTURAL REPORTSupporting Documents · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-08Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-12Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-40Plans · PDF18 Oct 2019View
SITE INVESTIGATION WORKS REPORT - APPENDIX 13.3Supporting Documents · PDF18 Oct 2019View
PARKING, HIGHWAYS & TRANSPORTATIONConsultee · PDF12 Mar 2020View
ENVIRONMENTAL STATEMENT: VOLUME 3 NON-TECHNICAL SUMMARYSupporting Documents · PDF18 Oct 2019View
LOCOMOTIVE SHED - 100.06 REV P1Plans · PDF20 Mar 2020View
SITE INVESTIGATION WORKS REPORT - APPENDIX 13.3 1 OF 2Supporting Documents · PDF18 Oct 2019View
ETLA RESPONSE TO ASHFORD BOROUGH COUNCIL (Supporting Documents · PDF19 Feb 2020View
REPORT - ANNEX 5 ADDITIONAL DOCUMENTPlanning Committee · PDF20 Mar 2020View
FROUNT ELEVATION - SDS 206445-55Plans · PDF18 Oct 2019View
HOTEL - ELEVATION A - 410.00Plans · PDF18 Oct 2019View
LOCOMOTIVE SHEDS - SECTION 1 (2) - 220.01 REV 0Plans · PDF18 Oct 2019View
RIVER STOUR INTERNAL DRAINAGE BOARDConsultee · PDF2 Dec 2019View
MATTHEW WAITGeneral Comment · PDF6 Nov 2019View
ADDITIONAL SITE BUILDING 2 ELEVATIONS - SDS 206445-67Plans · PDF18 Oct 2019View
WORKSHOP - GROUND FLOOR - 300.00Plans · PDF18 Oct 2019View
PROPOSED SITE PLAN - 100.03 REV P6Plans · PDF19 Aug 2020View
HOTEL - 5-14TH FLOOR - 400.40Plans · PDF18 Oct 2019View
SHADOW STUDY - LOCOMOTIVE SHED - ATRIUMSupporting Documents · PDF26 Feb 2020View
WORKSHOP - ELEVATION 2 - 310.01Plans · PDF18 Oct 2019View
PROPOSED OPEN SPACE - 100.07 REV P3Plans · PDF19 Aug 2020View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 5 PLANSSupporting Documents · PDF18 Oct 2019View
STRUCTURAL REPORT - APPENDICES JSupporting Documents · PDF18 Oct 2019View
SCENE 5Supporting Documents · PDF17 Oct 2019View
STREETSCENE & OPEN SPACESConsultee · PDF12 Mar 2020View
D & A HAZLEDONObjection Comment27 Nov 2019View
COVER EMAIL WITH AMENDED DETAILSSupporting Documents · PDF27 Feb 2020View
HOTEL - 1ST - 2ND FLOOR - 400.10Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-32Plans · PDF18 Oct 2019View
TOPOGRAPHICAL LAND SURVEY - SDS 206445.02Plans · PDF18 Oct 2019View
REPTILE SURVEY REPORTSupporting Documents · PDF17 Oct 2019View
BLOCK PLAN - 19.020.100.01 P1Plans · PDF17 Oct 2019View
KCC: BIODIVERSITYConsultee · PDF21 Feb 2020View
ENGINE SHED - SECTION - 620.00 P1Amended Drawing · PDF3 Feb 2020View
ADDITIONAL SITE BUILDING 2 ELEVATIONS - SDS 206445-66Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 3 (1) - RETENTION & RESTORATION - 900.16 P1Plans · PDF26 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-33Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-38Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-29Plans · PDF18 Oct 2019View
PRESS EXTRACTOther7 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-46Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHEDS - SECTION 4 & 5 - 220.20 REV 0Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED FIRST FLOOR PLAN (2) - 200.11Plans · PDF18 Oct 2019View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 14 HISTORIC ENVIRONMENT ASSESSMENTSupporting Documents · PDF18 Oct 2019View
ENGINE SHED - GROUND FLOOR PLAN - 600.00Plans · PDF18 Oct 2019View
HOTEL - ELEVATION D - 410.30Plans · PDF18 Oct 2019View
ADDITIONAL SITE BUILDINGS FLOOR PLAN - SDS 206445-58Plans · PDF18 Oct 2019View
SHADOW STUDY - LOCOMOTIVE SHED - AERIAL VIEWSupporting Documents · PDF26 Feb 2020View
WORKSHOP - GROUND FLOOR - 300.00 P1Amended Drawing · PDF3 Feb 2020View
TN2: CONSIDERATION OF PLANNING CONSULTATION RESPONSES FROM TEMPLE AND KCC ECOLOGSupporting Documents · PDF3 Mar 2020View
ROSEMARY DAWKINSObjection Comment · PDF11 Nov 2019View
KCC: BIODIVERSITYConsultee · PDF6 May 2020View
PROPOSED SITE PLAN - 19.020.100.03 REV P1Plans · PDF18 Nov 2019View
MALCOLM WEBBObjection Comment · PDF2 Dec 2019View
SHADOW STUDY - PLAN VIEWSupporting Documents · PDF26 Feb 2020View
ADDITIONAL SITE BUILDING 3 GROUND FLOOR PLAN - SDS 206445-63Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-45Plans · PDF18 Oct 2019View
ADDITIONL SITE BUILDING 3 GROUND FLOOR PLAN - SDS 206445-65Plans · PDF18 Oct 2019View
PLANNING STATEMENT LANDSCAPE ADDENDUMSupporting Documents · PDF26 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-42Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-42Plans · PDF18 Oct 2019View
KCC: ECONOMIC DEVELOPMENTConsultee · PDF6 Nov 2019View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGYSupporting Documents · PDF18 Oct 2019View
PHASING DIAGRAMSupporting Documents · PDF17 Oct 2019View
LOCOMOTIVE SHEDS - SECTION 1 (3) - 220.02 REV 0Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 1 (2) - RETENTION & RESTORATION - 900.11 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED ELEVATION 3 (2) - 210.21Plans · PDF18 Oct 2019View
ECONOMIC BENEFITS OF DEVELOPMENT AT NEWTOWN WORKS, ASHFORDSupporting Documents · PDF17 Oct 2019View
LOCOMOTIVE SHEDS - SECTION 1 (1) - 220.00 REV 0Plans · PDF18 Oct 2019View
KCC HIGHWAYSConsultee · PDF10 Feb 2020View
LOCOMOTIVE SHED FIFTH FLOOR PLAN (3) - 200.52Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 2 (2) - 210.11Plans · PDF18 Oct 2019View
HOTEL - GROUND FLOOR - 400.00 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ROOF PLAN (3) - 200.62Plans · PDF18 Oct 2019View
HOTEL - ELEVATION C - 410.20Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-38Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED SECOND FLOOR PLAN (2) - 200.21 P1Amended Drawing · PDF3 Feb 2020View
KCC: ECOLOGICAL ADVICE SERVICEConsultee · PDF2 Dec 2019View
APPENDICES 8.1 TO 8.5Supporting Documents · PDF3 Feb 2020View
SHED ELEVATION 3 (2) - RETENTION & RESTORATION - 900.17 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED GROUND FLOOR PLAN (2) - RETENTION & RESTORATION - 900.01 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED SECOND FLOOR PLAN (2) - 200.21Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATIONS 4 & 5 - 210.30 P1Amended Drawing · PDF3 Feb 2020View
ALAN SOAMESObjection Comment · PDF7 Feb 2020View
SCENE 4Supporting Documents · PDF17 Oct 2019View
ENGINE SHED - GROUND FLOOR PLAN - 600.00 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED SECOND FLOOR PLAN (3) - 200.22Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 3 (1) - 210.20Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 1 (1) - RETENTION & RESTORATION - 900.10 P1Plans · PDF26 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-17Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED GROUND FLOOR PLAN (3) - 200.02Plans · PDF18 Oct 2019View
ADDITIONAL SITE BUILDING 3 GROUND FLOOR PLAN - SDS 206445-65Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 3 (3) - 210.22Plans · PDF18 Oct 2019View
LOUISE BAREHAMObjection Comment · PDF18 Nov 2019View
LOCOMOTIVE SHED ELEVATION 2 (1) - 210.10Plans · PDF18 Oct 2019View
KCC: ECONOMIC DEVELOPMENTConsultee · PDF6 Nov 2019View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - PART 1Supporting Documents · PDF19 Feb 2020View
LOCOMOTIVE SHED FOURTH FLOOR PLAN (3) - 200.42Plans · PDF18 Oct 2019View
HISTORIC BUILDINGS ASSESSMENT - PART 1Supporting Documents · PDF26 Feb 2020View
LANDSCAPE MASTERPLAN - 0215-L10Amended Drawing · PDF27 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-50Amended Drawing · PDF3 Feb 2020View
AIR QUALITYSupporting Documents · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATIONS 4 & 5 - 210.30Plans · PDF18 Oct 2019View
PHOTO'S PART 2Supporting Documents · PDF28 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-08Amended Drawing · PDF3 Feb 2020View
REPORTPlanning Committee · PDF17 Apr 2020View
SITE LOCATION PLAN - 19.020.100.00 P1Plans · PDF17 Oct 2019View
SOS TPT DECISIONConsultee15 Jun 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-44Plans · PDF18 Oct 2019View
SCENE 2Supporting Documents · PDF17 Oct 2019View
ENGINE SHED - SECTION - 620.00Plans · PDF18 Oct 2019View
AGENT: COVER LETTER WITH AMENDED PLANSSupporting Documents3 Feb 2020View
SHADOW STUDY - LOCOMOTIVE SHED - AERIAL VIEW 2Supporting Documents · PDF26 Feb 2020View
CLELIA MOUNTFORDSupport Comment · PDF17 Feb 2020View
FILM STUDIOS - THIRD FLOOR - 500.03Plans · PDF18 Oct 2019View
ACETYLENE STORE - RETENTION & RESTORATION - 900.50 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED FOURTH FLOOR PLAN (2) - 200.41Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED THIRD FLOOR PLAN (3) - 200.33 P1Amended Drawing · PDF3 Feb 2020View
ECONOMIC BENEFITS STATEMENTSupporting Documents · PDF18 Oct 2019View
PRELIMINARY ECOLOGICAL APPRAISAL:PRELIMINARY ECOLOGICAL APPRAISAL:PRELIMINARY ECSupporting Documents · PDF18 Oct 2019View
CLARIFICATIONS TO HERITAGE STATEMENT AND BUILT HERITAGE ES CHAPTERSupporting Documents · PDF26 Feb 2020View
PHOTO'S PART 1Supporting Documents · PDF28 Feb 2020View
NOISE & VIBRATION - APPENDICES 9.1 TO 9.8Supporting Documents · PDF3 Feb 2020View
ENVIRONMENTAL STATEMENT ADDENDUM: VOLUME 1, MAIN TEXTSupporting Documents · PDF3 Feb 2020View
FILM STUDIOS - ROOF PLAN - 500.05 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ROOF PLAN (2) - 200.61 P1Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-30Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-06Plans · PDF18 Oct 2019View
LOCOMOTIVE SHEDS - SECTION 1 (2) - 220.01 P1Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - SECOND FLOOR PLAN - 600.20Plans · PDF18 Oct 2019View
FILM STUDIOS - SECOND FLOOR - 500.02Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED FOURTH FLOOR PLAN (1) - 200.40Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED GROUND FLOOR PLAN (1) - 200.00 P1Plans · PDF18 Oct 2019View
SCI APPENDICIESSupporting Documents · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-46Plans · PDF18 Oct 2019View
FILM STUDIOS - ELEVATION 2 - 510.01 P1Amended Drawing · PDF3 Feb 2020View
CLOCK TOWER - RETENTION & RESTORATION - 900.40 P1Plans · PDF26 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-48Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-22Plans · PDF18 Oct 2019View
PROPOSED - PAINT STORE BUILDING - 720.00Plans · PDF18 Oct 2019View
PROPOSED - ACETYLENE STORE - 710.00Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-51Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED THIRD FLOOR PLAN (2) - 200.31Plans · PDF18 Oct 2019View
AGENT: COVER LETTER WITH APPLICATIONSupporting Documents · PDF17 Oct 2019View
HISTORIC BUILDINGS ASSESSMENT - PART 2Supporting Documents · PDF26 Feb 2020View
LOCOMOTIVE SHED ELEVATION 2 (2) - RETENTION & RESTORATION - 900.14 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED GROUND FLOOR PLAN (3) - RETENTION & RESTORATION - 900.02 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED ELEVATION 1 (1) - 210.00Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-36Plans · PDF18 Oct 2019View
AGENT: COVER EMAIL WITH ADDITIONAL INFOSupporting Documents · PDF26 Feb 2020View
LOCOMOTIVE SHED ELEVATIONS 4 & 5 - RETENTION & RESTORATION - 900.19 P1Plans · PDF26 Feb 2020View
LOCOMOTIVE SHED ELEVATION 3 (3) - RETENTION & RESTORATION - 900.18 P1Plans · PDF26 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-45Amended Drawing · PDF3 Feb 2020View
FILM STUDIOS - SECTION 1 - 520.00Amended Drawing · PDF3 Feb 2020View
TECHNICAL NOTE - CAR PARK VENTILATION STRATEGYSupporting Documents · PDF26 Feb 2020View
HOTEL - SECTION A - 420.00Plans · PDF18 Oct 2019View
ARBORICULTURAL IMPACT ASSESSMENT - 10352_AIA.001 REV ASupporting Documents · PDF18 Oct 2019View
KENT POLICEConsultee · PDF17 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-15Plans · PDF18 Oct 2019View
RICHARD WATKINSSupport Comment · PDF16 Apr 2020View
RSD DESIGNERS RESPONSESupporting Documents · PDF28 Feb 2020View
HOTEL - 15-17TH FLOOR - 400.50Plans · PDF18 Oct 2019View
KEITH BICKLEGeneral Comment · PDF8 Nov 2019View
HOTEL - THIRD FLOOR - 400.30Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED THIRD FLOOR PLAN (3) - 200.32Plans · PDF18 Oct 2019View
GROUND INVESTIGATION - APPENDIX 13.1Supporting Documents · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-04Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-10Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-03Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 1 (3) - 210.02Plans · PDF18 Oct 2019View
HOTEL - ROOF PLAN - 400.60Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED FIFTH FLOOR PLAN (1) - 200.50Plans · PDF18 Oct 2019View
ADDITIONAL SITE BUILDING 2 FGROUND FLOOR PLAN - SDS 206445-61Plans · PDF18 Oct 2019View
NHS REVISED RESPONSEConsultee · PDF8 Jan 2020View
MIKE THORNTONSupport Comment · PDF12 Feb 2020View
DESIGN & ACCESS STATEMENT - PART 2Supporting Documents · PDF17 Oct 2019View
ADDITIONAL SITE BUILDINGS FLOOR PLAN - SDS 206445-57Plans · PDF18 Oct 2019View
KCC: ECONOMIC DEVELOPMENTConsultee · PDF6 Feb 2020View
SOUTH WILLESBOROUGH & NEWTOWN PARISH COUNCILConsultee · PDF2 Mar 2020View
FILM STUDIOS - FIRST FLOOR - 500.01Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-07Plans · PDF18 Oct 2019View
ENVIRONMENTAL STATEMENT: VOLUME 1, MAIN TEXTSupporting Documents · PDF18 Oct 2019View
FILM STUDIOS - ELEVATION 2 - 510.01 P1Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-47Plans · PDF18 Oct 2019View
STRUCTURAL REPORT - APPENDICES K-NSupporting Documents · PDF18 Oct 2019View
ENGINE SHED - SIDE ELEVATIONS - 610.02Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 1 (3) - RETENTION & RESTORATION - 900.12 P1Plans · PDF26 Feb 2020View
STRUCTURAL REPORT - APPENDICES A-HSupporting Documents · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-16Plans · PDF18 Oct 2019View
VERIFICATION REPORT - APPENDIX 13.2Supporting Documents · PDF18 Oct 2019View
SITE SECTION B-B - 800.01Plans · PDF18 Oct 2019View
FROUNT ELEVATION - SDS 206445-54Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-05Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED GROUND FLOOR PLAN (1) - 200.00 P1Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-48Amended Drawing · PDF3 Feb 2020View
ECONOMIC DEVELOPMENTConsultee · PDF15 Jan 2020View
ADDITIONAL SITE BUILDING 2 FIRST FLOOR PLAN - SDS 206445-62Amended Drawing · PDF3 Feb 2020View
ANDY HUNTERSupport Comment · PDF7 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-37Amended Drawing · PDF3 Feb 2020View
NATHANAEL LOWDENSupport Comment · PDF10 Mar 2020View
COVER EMAIL WITH AMENDED DETAILSSupporting Documents · PDF27 Feb 2020View
PROPOSED SITE PLAN - APPENDIX 5 (FIGURES)Supporting Documents · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-11Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ROOF PLAN (2) - 200.61Plans · PDF18 Oct 2019View
SITE LOCATION PLAN - APPENDIX 5 (FIGURES)Supporting Documents · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 2 (3) - RETENTION & RESTORATION - 900.15 P1Plans · PDF26 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-43Plans · PDF18 Oct 2019View
PHOTO'S PART 4Supporting Documents · PDF28 Feb 2020View
SITE SECTIONS C-C, D-D & E-E - 800.02Plans · PDF18 Oct 2019View
ENVIRONMENT AGENCYConsultee · PDF11 Nov 2019View
ARTICLE 31 PLANNING DIRECTION 2018Supporting Documents · PDF15 Jun 2020View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 16 ADDITIONALITY CALCULATIONSSupporting Documents · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-41Plans · PDF18 Oct 2019View
REMEDIATION STRATEGY - APPENDIX 13.4Supporting Documents · PDF18 Oct 2019View
CLARIFICATIONS TO THE TOWNSCAPE VISUAL IMPACT ASSESSMENTSupporting Documents · PDF27 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-32Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED DEMOLITION GROUND FLOOR PLAN (1) - 900.00Amended Drawing · PDF26 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-07Amended Drawing · PDF3 Feb 2020View
EKC GROUPSupport Comment · PDF16 Apr 2020View
REPORTPlanning Committee · PDF20 Mar 2020View
LOCOMOTIVE SHEDS - SECTIONS 2 & 3 - 220.10 REV 0Plans · PDF18 Oct 2019View
VERIFICATION REPORT - APPENDICES 13.2 (PART 1)Supporting Documents3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-18Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED SECOND FLOOR PLAN (1) - 200.20Plans · PDF18 Oct 2019View
ADDITIONAL SITE BUILDINGS ELEVATIONS - SDS 206445-59Amended Drawing · PDF3 Feb 2020View
FILM STUDIOS - GROUND FLOOR - 500.00 P1Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-20Plans · PDF18 Oct 2019View
SITE SECTION A-A - 800.00 P1Plans · PDF18 Oct 2019View
WORKSHOP - ELEVATION 1 - 310.00Plans · PDF18 Oct 2019View
MICHAEL BURTONObjection Comment · PDF1 Nov 2019View
WORKSHOP - THIRD FLOOR - 300.30 P1Amended Drawing · PDF3 Feb 2020View
WORKSHOP - SECOND FLOOR - 300.20Plans · PDF18 Oct 2019View
DESIGN & ACCESS STATEMENT - PART 1Supporting Documents · PDF17 Oct 2019View
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY - APPENDICES A-DSupporting Documents · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-16Amended Drawing · PDF3 Feb 2020View
DANIELLE VINEGeneral Comment · PDF18 Nov 2019View
TOM AVISONSupport Comment · PDF16 Apr 2020View
JOE DIVESSupport Comment · PDF16 Apr 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-44Amended Drawing · PDF3 Feb 2020View
DECISION NOTICEDecision Notice · PDF1 Sept 2020View
FILM STUDIOS - THIRD FLOOR - 500.03 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-17Amended Drawing · PDF3 Feb 2020View
RESPONSE TO CONSULTATION RESPONSES FROM KCC DATED 27TH FEBRUARY 2020 AND 2ND MARSupporting Documents · PDF5 Mar 2020View
LOCOMOTIVE SHEDS - SECTIONS 6 - 220.30 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 2 (3) - 210.12Plans · PDF18 Oct 2019View
HOTEL - ROOF PLAN - 400.60 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ROOF PLAN (1) - 200.60 P1Amended Drawing · PDF3 Feb 2020View
RESPONSE TO CONSULTATION RESPONSES FROM KCC DATED 5TH NOVEMBER AND HE DATED 21ST - PART 1Supporting Documents · PDF3 Feb 2020View
HISTORIC ENVIRONMENT ASSESSMENT - APPENDIX 14.1Supporting Documents · PDF3 Feb 2020View
TOPOGRPHICAL LAND SURVEY - SDS 206445.02Amended Drawing · PDF3 Feb 2020View
WORKSHOP - ROOF PLAN - 310.40Plans · PDF18 Oct 2019View
KCC HIGHWAYSConsultee · PDF7 Feb 2020View
HOTEL - FOURTH FLOOR - 400.30Plans · PDF18 Oct 2019View
ADDITIONAL SITE BUILDING 3 ELEVATIONS - SDS 206445-65Plans · PDF18 Oct 2019View
NHS E-MAILConsultee · PDF6 Jan 2020View
GROUND INVESTIGATION - APPENDICES 13.1Supporting Documents · PDF3 Feb 2020View
FILM STUDIOS - FOURTH FLOOR - 500.04 P1Amended Drawing · PDF3 Feb 2020View
FROUNT ELEVATION - SDS 206445-56Plans · PDF18 Oct 2019View
SOUTH WILLESBOROUGH & NEWTON COMMUNITY COUNCILConsultee · PDF14 Jan 2020View
FAYE MURRAYGeneral Comment · PDF10 Dec 2019View
GROUND FLOOR PLAN - SDS 206445-22Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-06Amended Drawing · PDF3 Feb 2020View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 15 ES TECHNICALSupporting Documents · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-50Plans · PDF18 Oct 2019View
SITE LOCATION - 100.00 REV P5Plans · PDF19 Aug 2020View
LOCOMOTIVE SHED FOURTH FLOOR PLAN (1) - 200.40 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-14Plans · PDF18 Oct 2019View
WORKSHOP - FIRST FLOOR - 300.10Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 2 (1) - RETENTION & RESTORATION - 900.13 P1Plans · PDF26 Feb 2020View
KCC: FLOOD & WATER MANAGEMENTConsultee · PDF18 Mar 2020View
BILLY JOHNSONSupport Comment · PDF19 Feb 2020View
ADDITIONAL SITE BUILDINGS ELEVATIONS - SDS 206445-58Amended Drawing · PDF3 Feb 2020View
FILM STUDIOS - FIRST FLOOR - 500.01 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-12Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHEDS - SECTIONS 4 & 5 - 220.20 P1Amended Drawing · PDF3 Feb 2020View
DRAWING ISSUE SHEETSupporting Documents · PDF17 Oct 2019View
HIGHWAYS ENGLANDConsultee · PDF20 Feb 2020View
ENGINE SHED - ROOF PLAN - 600.30Plans · PDF18 Oct 2019View
WORKSHOP - ELEVATION 3 - 310.02Plans · PDF18 Oct 2019View
EXISTING SITE PLAN - 19.020.100.02 P1Plans · PDF17 Oct 2019View
ENGINE SHED - GROUND FLOOR PLAN - RETENTION & RESTORATION - 900.20 P1Plans · PDF26 Feb 2020View
VERIFICATION REPORT - APPENDICES 13.2 (PART 2)Supporting Documents3 Feb 2020View
PROPOSED REPTILE MITIGATION STRATEGY - TECHNICAL BRIEFING NOTEAmended Drawing · PDF25 Feb 2020View
ENGINE SHED - FRONT ELEVATION - 610.00 P1Amended Drawing · PDF3 Feb 2020View
HOTEL - FOURTH FLOOR - 400.40 P2Amended Drawing · PDF3 Feb 2020View
ECOLOGY TECHNICAL NOTESupporting Documents · PDF25 Feb 2020View
WORKSHOP - ELEVATION 4 - 320.00 P1Amended Drawing · PDF3 Feb 2020View
FROUNT ELEVATION - SDS 206445-78Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-19Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-37Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 2 (2) - 210.11 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 3 (1) - 210.20 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-24Amended Drawing · PDF3 Feb 2020View
SOUTHERN WATERConsultee · PDF29 Nov 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-34Plans · PDF18 Oct 2019View
JOEL TODAROSupport Comment · PDF19 Feb 2020View
ENVIRONMENT AGENCYConsultee · PDF19 Feb 2020View
HOTEL - ELEVATION A - 410.00 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 1 (2) - 210.01Plans · PDF18 Oct 2019View
TECHNICAL BRIEFING NOTE TN1: PROPOSED REPTILE MITIGATION STRATEGY - APPENDICES 11.4Supporting Documents · PDF3 Feb 2020View
LOCOMOIVE SHED FIRST FLOOR PLAN (2) - 200.11 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED FIFTH FLOOR PLAN (2) - 200.51Plans · PDF18 Oct 2019View
SITE INVESTIGATION WORKS - APPENDICES 13.3 (PART 1)Supporting Documents · PDF3 Feb 2020View
ADDITIONAL SITE BUILDING 4 ELEVATIONS - SDS 206445-67Plans · PDF18 Oct 2019View
SIOBHAN MURPHYSupport Comment · PDF11 Feb 2020View
TOWNSCAPE & VISUAL IMPACT - APPENDICES 10.1 TO 10.08Supporting Documents · PDF3 Feb 2020View
DEPARTMENT OF TRANSPORTConsultee · PDF15 Jun 2020View
SHARON HORGANSupport Comment · PDF11 Feb 2020View
HOTEL - 19TH FLOOR - 400.80 0Amended Drawing · PDF3 Feb 2020View
SITE LOCATION PLAN - 100.00 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-20Amended Drawing · PDF3 Feb 2020View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 9 NOISE AND VIBRATIONSupporting Documents · PDF18 Oct 2019View
JEREMY RAINBIRDSupport Comment · PDF11 Feb 2020View
LOCOMOTIVE SHED SECOND FLOOR PLAN (1) - 200.20 P1Amended Drawing · PDF3 Feb 2020View
THOMAS ADAMSSupport Comment · PDF11 Feb 2020View
PROPOSED SITE PLAN - 100.03 P2Amended Drawing · PDF3 Feb 2020View
THE VICTORIAN SOCIETYConsultee · PDF16 Dec 2019View
HOTEL - ELEVATION B - 410.10 P1Amended Drawing · PDF3 Feb 2020View
HOTEL - SECTION B - 420.10 0Amended Drawing · PDF3 Feb 2020View
REBECCA PARKINSONSupport Comment · PDF11 Feb 2020View
LOCOMOTIVE SHED THIRD FLOOR PLAN (2) - 200.31 P1Amended Drawing · PDF3 Feb 2020View
DESIGN & ACCESS STATEMENT - PART 4Supporting Documents · PDF17 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-26Plans · PDF18 Oct 2019View
FILM STUDIOS - ELEVATION 3 & 4 - 510.02 P1Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-52Plans · PDF18 Oct 2019View
GARATH WHYTESupport Comment · PDF11 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-13Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ROOF PLAN (1) - 200.60Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ROOF PLAN (3) - 200.62 P1Amended Drawing · PDF3 Feb 2020View
HERITAGE STATEMENT - APPENDIX 15.1Supporting Documents · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-04Amended Drawing · PDF3 Feb 2020View
ADDITIONAL SITE BUILDING 2 ELEVATIONS - SDS 206445-66Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED SECOND FLOOR PLAN (3) - 200.22 P1Amended Drawing · PDF3 Feb 2020View
WORKSHOP - ELEVATION 3 - 310.02 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED FIFTH FLOOR PLAN (2) - 200.51 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED FIFTH FLOOR PLAN (1) - 200.50 P1Amended Drawing · PDF3 Feb 2020View
WORKSHOP - ELEVATION 4 - 310.03 P1Amended Drawing · PDF3 Feb 2020View
KCC: HIGHWAYS & TRANSPORTATIONConsultee · PDF2 Mar 2020View
OPEN SPACE PLAN A4 FOR LEGAL AGREEMENT - 100.08Plans · PDF19 Aug 2020View
STEVEN LENNONSupport Comment · PDF11 Feb 2020View
WORKSHOP - ROOF PLAN - 300.40 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-10Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-09Amended Drawing · PDF3 Feb 2020View
COMMERCIAL TRIP GENERATION AND FLOOR AREASupporting Documents · PDF11 Feb 2020View
LOCOMOTIVE SHED ELEVATION 1 (1) - 210.00 P1Amended Drawing · PDF3 Feb 2020View
NETWORK RAILConsultee · PDF2 Jan 2020View
GROUND FLOOR PLAN - SDS 206445-03Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 3 (3) - 210.22 P1Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - SIDE ELEVATIONS - 610.02 P1Amended Drawing · PDF3 Feb 2020View
CREATIVE ENGLANDSupport Comment17 Mar 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-51Amended Drawing · PDF3 Feb 2020View
FILM STUDIOS - GROUND FLOOR - 500.00 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-23Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-40Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-47Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-23Plans · PDF18 Oct 2019View
TOPOGRAPHICAL LAND SURVEY - SDS 206445.01Plans · PDF18 Oct 2019View
ANDREW LAUGHLANDSupport Comment · PDF22 Apr 2020View
UNIVERSITY OF KENTSupport Comment26 Feb 2020View
LOCOMOTIVE SHED FOURTH FLOOR PLAN (2) - 200.41 P1Amended Drawing · PDF3 Feb 2020View
POLICE PLANNING LIAISONConsultee · PDF4 Mar 2020View
KENT POLICEConsultee · PDF13 Feb 2020View
ADDITIONAL SITE BUILDING 4 GROUND FLOOR PLAN - SDS 206445-64Plans · PDF18 Oct 2019View
ACCOMMODATION SCHEDULE. - REV BSupporting Documents · PDF17 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-31Amended Drawing · PDF3 Feb 2020View
TRANSPORT ASSESSMENTSupporting Documents · PDF17 Oct 2019View
ADDITIONAL SITE BUILD SITE BUILDING 4 GROUND FLOOR PLAN - SDS 206445-64Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-29Amended Drawing · PDF3 Feb 2020View
JASON DEVINESupport Comment · PDF12 Feb 2020View
LOCOMOTIVE SHED GROUND FLOOR PLAN (1) - 200.00 P1Amended Drawing · PDF3 Feb 2020View
ADDITIONAL SITE BUILDING 2 FIRST FLOOR PLAN - SDS 206445-62Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-25Amended Drawing · PDF3 Feb 2020View
ADDITIONAL SITE BUILDING 2 GROUND FLOOR PLAN - SDS 206445-61Amended Drawing · PDF3 Feb 2020View
ENVIRONMENTAL PROTECTIONConsultee · PDF14 Nov 2019View
LOCOMOTIVE SHED ELEVATION 2 (1) - 210.10 P1Amended Drawing · PDF3 Feb 2020View
HISTORIC BUILDINGS ASSESSMENT - PART 3Supporting Documents26 Feb 2020View
MINUTESPlanning Committee · PDF4 May 2020View
HOTEL - 14-17TH FLOOR - 400.50 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED GROUND FLOOR PLAN (3) - 200.02 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED FIFTH FLOOR PLAN (3) - 200.52 P1Amended Drawing · PDF3 Feb 2020View
CLIMATE CHANGE STATEMENT. - APPENDIX 3.1Supporting Documents · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-35Amended Drawing · PDF3 Feb 2020View
SITE LOCATION PLAN - 19.020.100.00 P2Amended Drawing · PDF28 May 2020View
HOTEL - 1ST - 2ND FLOOR - 400.10 P1Amended Drawing · PDF3 Feb 2020View
HOTEL - THIRD FLOOR - 400.20 P1Amended Drawing · PDF3 Feb 2020View
LISA KNIGHT-SMITHSupport Comment · PDF11 Feb 2020View
HOTEL - ELEVATION C - 410.20 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 3 (2) - 210.21 P1Amended Drawing · PDF3 Feb 2020View
HOTEL - FOURTH FLOOR - 400.30 P1Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - SECOND FLOOR PLAN - 600.20 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-15Amended Drawing · PDF3 Feb 2020View
LANDSCAPE MASTERPLAN - 0215-DR-01-V06Plans · PDF22 Nov 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-52Amended Drawing · PDF3 Feb 2020View
STATEMENT OF COMPETENCE - APPENDIX 3.2Supporting Documents · PDF3 Feb 2020View
HERITAGE STATEMENT_REVISEDSupporting Documents · PDF3 Feb 2020View
MATTHEW HARRISObjection Comment · PDF12 Dec 2019View
RESPONSE TO CONSULTATION RESPONSES FROM KCC DATED 5TH NOVEMBER AND HE DATED 21ST - PART 3Supporting Documents · PDF3 Feb 2020View
ADDITIONAL SITE BUILDING 4 ELEVATIONS - SDS 206445-67Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 1 (2) - 210.01 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-11Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-33Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-14Amended Drawing · PDF3 Feb 2020View
ADDITIONALITY CALCULATIONS - APPENDIX 16.1Supporting Documents · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-19Amended Drawing · PDF3 Feb 2020View
WORKSHOP - SECOND FLOOR - 300.20 P1Amended Drawing · PDF3 Feb 2020View
END ELEVATION - SDS 206445-78Amended Drawing · PDF3 Feb 2020View
FRONT ELEVATION - SDS 206445-54Amended Drawing · PDF3 Feb 2020View
LINDA CHRISTIESupport Comment · PDF3 Feb 2020View
LAND AT NEWTOWN WORKS, ASHFORD - 0215-L10Supporting Documents · PDF3 Feb 2020View
BAT SURVEY REPORT BAT SURVEY REPORT BAT SURVEY REPORT BAT SURVEY REPORT BAT SURV - APPENDICES 11.2Supporting Documents · PDF3 Feb 2020View
WORKSHOP - FIRST FLOOR - 300.10 P1Amended Drawing · PDF3 Feb 2020View
ASHFORD ACCESSConsultee · PDF25 Feb 2020View
ADDITIONAL SITE BUILDINGS ELEVATIONS - SDS 206445-60Amended Drawing · PDF3 Feb 2020View
OPERATIONS NOTESupporting Documents · PDF12 May 2020View
REMEDIATION STRATEGY - APPENDICES 13.4Supporting Documents · PDF3 Feb 2020View
HOTEL 14TH - 17TH FLOOR - 19.020.400.50 REV P3Plans · PDF25 Aug 2020View
GROUND FLOOR PLAN - SDS 206445-05Amended Drawing · PDF3 Feb 2020View
FRONT ELEVATION - SDS 206445-53Amended Drawing · PDF3 Feb 2020View
SCREEN SOUTHSupport Comment · PDF14 Feb 2020View
ADDITIONAL SITE BUILDINGS FLOOR PLAN - SDS 206445-57Amended Drawing · PDF3 Feb 2020View
RUSLAN JELSIBEKOVGeneral Comment · PDF14 Nov 2019View
REPTILE SURVEY REPORT - APPENDICES 11.3Supporting Documents · PDF3 Feb 2020View
NEIL CHALMERSSupport Comment · PDF16 Apr 2020View
HERITAGE AND TVIA REVIEWOther · PDF14 Apr 2020View
ADDITIONAL SITE BUILDING 3 ELEVATIONS - SDS 206445-65Amended Drawing · PDF3 Feb 2020View
SUSANNA SAITObjection Comment · PDF5 Dec 2019View
LOCOMOTIVE SHED GROUND FLOOR PLAN (2) - 200.01 P1Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - FIRST FLOOR PLAN - 600.10 P1Amended Drawing · PDF3 Feb 2020View
MARCO COHENSupport Comment · PDF11 Feb 2020View
COMPARISION BETWEEN COMMERCIAL FLOOR AREASSupporting Documents · PDF7 Feb 2020View
JO NOLANSupport Comment · PDF11 Feb 2020View
RESPONSE TO CONSULTATION RESPONSES FROM KCC DATED 5TH NOVEMBER AND HE DATED 21ST - PART 2Supporting Documents · PDF3 Feb 2020View
LOCOMOTIVE SHED FOURTH FLOOR PLAN (3) - 200.42 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-21Amended Drawing · PDF3 Feb 2020View
TOPOGRPHICAL LAND SURVEY - SDS 206445.01Amended Drawing · PDF3 Feb 2020View
PHOTO'S PART 3Supporting Documents · PDF28 Feb 2020View
FILM STUDIOS - ELEVATION 1 - 510.00 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED ELEVATION 1 (3) - 210.02 P1Amended Drawing · PDF3 Feb 2020View
ANDREW DEERGeneral Comment · PDF1 Nov 2019View
LOCOMOTIVE SHEDS - SECTION 1 (1) - 220.00 P1Amended Drawing · PDF3 Feb 2020View
LANDSCAPE MASTERPLAN - 02510-L10 VO7Amended Drawing · PDF3 Feb 2020View
EXISTING SITE SURVEYAmended Drawing · PDF3 Feb 2020View
FILM STUDIOS - SECOND FLOOR - 500.02 P1Amended Drawing · PDF3 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-26Amended Drawing · PDF3 Feb 2020View
PRESS EXTRACTOther15 Nov 2019View
FRONT ELEVATION - SDS 206445-56Amended Drawing · PDF3 Feb 2020View
WORKSHOP - THIRD FLOOR - 310.30Plans · PDF18 Oct 2019View
DAN SETFORDSupport Comment · PDF11 Feb 2020View
PORPOSED SITE PLAN - 19.020.100.03 P4Amended Drawing · PDF28 May 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-36Amended Drawing · PDF3 Feb 2020View
ADAM BOYDSupport Comment · PDF12 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-34Amended Drawing · PDF3 Feb 2020View
WORKSHOP - ELEVATION 1 - 310.00 P1Amended Drawing · PDF3 Feb 2020View
ROBIN STALKERObjection Comment · PDF20 Nov 2019View
GROUND FLOOR - 200.00 REV P3Plans · PDF12 May 2020View
KCC: HIGHWAYS & TRANSPORTATIONConsultee · PDF6 Feb 2020View
GROUND FLOOR PLAN - SDS 206445-21Plans · PDF18 Oct 2019View
HOTEL - 18TH FLOOR - 400.70 0Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - FIRST FLOOR PLAN - 600.10Plans · PDF18 Oct 2019View
ENVIRONMENTAL STATEMENT ADDENDUM: VOLUME 3, NON TECHNICAL SUMMARYSupporting Documents · PDF4 Feb 2020View
EXISTING SITE PLAN - 100.02 P1Amended Drawing · PDF3 Feb 2020View
SKETCH VISUAL - 0215-SK-03-V1Plans · PDF22 Nov 2019View
PRELIMINARY ECOLOGICAL APPRAISAL:PRELIMINARY ECOLOGICAL APPRAISAL:PRELIMINARY EC - APPENDICES 11.1Supporting Documents · PDF3 Feb 2020View
PRESS EXTRACTOther14 Feb 2020View
HOTEL - ELEVATION D - 410.30 P1Amended Drawing · PDF3 Feb 2020View
REPORT - ANNEX 2 ADDITIONAL DOCUMENTPlanning Committee · PDF20 Mar 2020View
GEORGIOS CHRYSOCHOIDISGeneral Comment · PDF12 Nov 2019View
BRIAN WEBBObjection Comment · PDF2 Dec 2019View
HS1Consultee · PDF11 Feb 2020View
EXTENSION OF TIME AGREEMENT & SCHEDULESConsultee28 Aug 2020View
HOTEL - GROUND FLOOR - 400.00Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-13Plans · PDF18 Oct 2019View
FILM STUDIOS - ROOF PLAN - 500.05Plans · PDF18 Oct 2019View
ENVIRONMENTAL STATEMENT: VOLUME 2 - APPENDIX 10 LVIA 1 OF 2Supporting Documents · PDF18 Oct 2019View
WORKSHOP - ELEVATION 2 - 310.01 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHEDS - SECTION 6 - 220.30 REV 0Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-43Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-41Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED THIRD FLOOR PLAN (1) - 200.30Plans · PDF18 Oct 2019View
KCC: HIGHWAYS & TRANSPORTATIONConsultee · PDF6 Nov 2019View
VIABILITY REVIEW BY BESPOKE FOR ABC - EXEC SUMMARYSupporting Documents · PDF9 Apr 2020View
FRONT ELEVATION - SDS 206445-55Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED FIRST FLOOR PLAN (1) - 200.10Plans · PDF18 Oct 2019View
GROUND FLOOR PLAN - SDS 206445-09Plans · PDF18 Oct 2019View
LOCOMOTIVE SHEDS - SECTION 1 (3) - 220.02 P1Amended Drawing · PDF3 Feb 2020View
PROPOSED BLOCK PLAN - 100.01 P2Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - REAR ELEVATION - 610.01 P1Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-30Amended Drawing · PDF3 Feb 2020View
FILM STUDIOS - ELEVATION 3 & 4 - 510.02Plans · PDF18 Oct 2019View
REPORT - ANNEX 1 ADDITIONAL DOCUMENTPlanning Committee · PDF20 Mar 2020View
MATTHEW COOKSupport Comment · PDF11 Nov 2019View
LOCOMOTIVE SHED THIRD FLOOR PLAN (1) - 200.30 P1Amended Drawing · PDF3 Feb 2020View
CLARA STATHAM (BENNETT)Support Comment · PDF11 Feb 2020View
HOTEL - SECTION A - 420.00 P1Amended Drawing · PDF3 Feb 2020View
STANTEC RESPONSE TO IDB AND LLFASupporting Documents · PDF19 Feb 2020View
WIND MICROCLIMATE DESKTOP ASSESSMENTSupporting Documents · PDF4 Feb 2020View
BAT SURVEY REPORTSupporting Documents · PDF17 Oct 2019View
NHS RESPONSEConsultee6 Jan 2020View
LANDSCAPE PROPOSALS - 0215-L05Plans · PDF22 Nov 2019View
NEWTOWN WORKS - RESPONSE TO TEMPLE COMMENTSSupporting Documents · PDF3 Feb 2020View
ES TECHNICAL APPENDIX 9.1: HERITAGE STATEMENTSupporting Documents · PDF17 Oct 2019View
DRAWING ISSUE SHEETSupporting Documents · PDF3 Feb 2020View
H GALLAGHERSupport Comment · PDF2 Dec 2019View
DESIGN & ACCESS STATEMENT - PART 3Supporting Documents · PDF17 Oct 2019View
LYNN SENCICLEGeneral Comment · PDF1 Nov 2019View
KCC: HIGHWAYS & TRANSPORTATIONConsultee · PDF10 Mar 2020View
LOCOMOIVE SHED FIRST FLOOR PLAN (3) - 200.12 P1Amended Drawing · PDF3 Feb 2020View
FILM STUDIOS - FOURTH FLOOR - 500.04Plans · PDF18 Oct 2019View
SKETCH VISUAL - 0215-SK-02-V3Plans · PDF22 Nov 2019View
TRANSPORT ASSESSMENT - APPENDICES A-HSupporting Documents · PDF17 Oct 2019View
JOHN THOMASObjection Comment · PDF22 Apr 2020View
GROUND FLOOR PLAN - SDS 206445-24Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED ELEVATION 2 (3) - 210.12 P1Amended Drawing · PDF3 Feb 2020View
FROUNT ELEVATION - SDS 206445-53Plans · PDF18 Oct 2019View
FIGURES 10.37 TO 10.42 WIRELINE VIEWS 2 - APPENDICES 10.1 TO 10.08Supporting Documents · PDF3 Feb 2020View
TRANSPORT ASSESSMENT - APPENDICES T-ZSupporting Documents · PDF17 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-49Amended Drawing · PDF3 Feb 2020View
ENGINE SHED - ROOF PLAN - 600.20 P1Amended Drawing · PDF3 Feb 2020View
LOCOMOTIVE SHED FIRST FLOOR PLAN (1) - 200.10 P1Amended Drawing · PDF3 Feb 2020View
KCC: HIGHWAYS & TRANSPORTATIONConsultee · PDF2 Mar 2020View
HGHWAYS ENGLANDConsultee · PDF22 Apr 2020View
WORKSHOP - ELEVATION 4 - 310.03Plans · PDF18 Oct 2019View
LOCOMOTIVE SHEDS - SECTIONS 2 & 3 - 220.10 P1Amended Drawing · PDF3 Feb 2020View
BLOCK PLAN - 19.020.100.01 P3Amended Drawing · PDF28 May 2020View
CAROLINE HILLSGeneral Comment · PDF14 Nov 2019View
S106 AGREEMENTDecision Notice · PDF2 Sept 2020View
WATCHING BRIEF REPORT NOV 2013Consultee · PDF3 Mar 2020View
HIGHWAYS ENGLANDConsultee · PDF21 Nov 2019View
STATEMENT OF COMMUNITY INVOLVEMENTSupporting Documents · PDF17 Oct 2019View
LIST OF DOCUMENTSSupporting Documents · PDF31 Jul 2020View
KCC: HIGHWAYS & TRANSPORTATIONConsultee · PDF2 Mar 2020View
RESIDENTIAL/DWELLING UNITS - SUPPLEMENTARY INFORMATIONSupporting Documents · PDF17 Oct 2019View
HOTEL 5 - 13TH FLOOR - 19.020.400.40 REV P4Plans · PDF25 Aug 2020View
PROPOSED - CLOCK TOWER - 700.00Plans · PDF18 Oct 2019View
WORKSHOP - SECTIONS - 320.00Plans · PDF18 Oct 2019View
ENGINE SHED - FRONT ELEVATION - RETENTION & RESTORATION - 900.30 P2Plans · PDF26 Feb 2020View
KCC ARCHAEOLOGY COMMENTSConsultee · PDF3 Mar 2020View
KCC: HERITAGEConsultee · PDF4 Dec 2019View
PROPOSED SITE PLAN - 19.020.100.03 P1Plans · PDF17 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-49Plans · PDF18 Oct 2019View
SCENE 3Supporting Documents · PDF17 Oct 2019View
NICHOLAS CRANEObjection Comment17 Dec 2019View
TRANSPORT ASSESSMENT - APPENDICES AA-GGSupporting Documents · PDF17 Oct 2019View
TRANSPORT ASSESSMENT - APPENDICES I-KSupporting Documents · PDF17 Oct 2019View
ENGINE SHED - FRONT ELEVATION - 610.00Plans · PDF18 Oct 2019View
LOCOMOTIVE SHED - M4(2) FLATS - 100.06 P1Amended Drawing · PDF17 Mar 2020View
ENGINE SHED - REAR ELEVATION - 610.01Plans · PDF18 Oct 2019View
HISTORIC ENGLANDConsultee · PDF26 Feb 2020View
NICHOLAS CRANEObjection Comment · PDF18 Apr 2020View
DAYLIGHT ADVICESupporting Documents · PDF17 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-31Plans · PDF18 Oct 2019View
FIRST FLOOR BUILDING PLAN - SDS 206445-39Plans · PDF18 Oct 2019View
APPLICATIONApplication Form · PDF17 Oct 2019View
TOM LEWIN SMITHSupport Comment · PDF16 Apr 2020View
GROUND FLOOR PLAN - SDS 206445-18Amended Drawing · PDF3 Feb 2020View
FIRST FLOOR BUILDING PLAN - SDS 206445-35Plans · PDF18 Oct 2019View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Received Date

    Published milestoneCouncil source
  3. Latest Decision Date (Calculated)

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Date of Committee

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permit
SOS TPT DECISION DECISION NOTICE S106 AGREEMENT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.