Council planning record

Variation of conditions 2, 14, 15, 22 and 23 imposed under Y/52/23/PL relating to approved plans condition, proposed boundary treatments, proposed cycle storage, proposed ecological mitigation/enhancement measures and proposed energy/sustainability measures.

Land West of Bilsham Road Yapton

UndecidedReference: Y/80/25/S73Arun District Council

Last published check: 11 Oct 2026, 03:47. Check the council record for more recent changes.

Application location

Land West of Bilsham Road Yapton

This record has no verified map location.

Application summary

Status
Undecided
Application type
Not published
Received
19 Dec 2025
Validated
22 Dec 2025
Determination deadline
23 Oct 2026
Local authority
Arun District Council

Application overview

Variation of conditions 2, 14, 15, 22 and 23 imposed under Y/52/23/PL relating to approved plans condition, proposed boundary treatments, proposed cycle storage, proposed ecological mitigation/enhancement measures and proposed energy/sustainability measures.

Proposal details

Reference
Y/80/25/S73
Parish
Yapton
Agent
ECE Planning 64-68 Brighton Road Worthing

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 370 of 370

DocumentPublishedAction
ApplicationApplication23 Dec 2025View
GENERAL ARRANGEMENT 170 UNIT REPLAN 24-217-200 REVEPlans23 Dec 2025View
OVERALL ENGINEERING LAYOUT 170 UNIT REPLAN 24-217-260Plans23 Dec 2025View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 1 OF 2 5304-RPS-EX-XX-DR-L-9104 REVP10Plans23 Dec 2025View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 1 OF 2 5304-RPS-EX-XX-DR-L-9104 REVP10Plans23 Dec 2025View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 1 OF 3 5304-RPS-EX-XX-DR-L-9104 REVP10Plans23 Dec 2025View
ELECTRIC SUBSTATION FLOOR PLAN, EELVATIONS, ROOF PLAN 1502Plans23 Dec 2025View
TREE SURVEY 1 OF 2 701Plans23 Dec 2025View
TREE SURVEY SHEET 2 OF 2 702Plans23 Dec 2025View
LOCATION PLAN 1000Plans22 Dec 2025View
PLANTING LAYOUT 1100 REVHSubstitute Plan23 Sept 2026View
MATERIALS PLAN 1111 REVESubstitute Plan23 Sept 2026View
STOREY HEIGHTS P[LAN 1112 REVDSubstitute Plan23 Sept 2026View
ENCLOSURES PLAN 1113 REVESubstitute Plan23 Sept 2026View
AFFORDABLE HOUSING PLAN 1114 REVDSubstitute Plan23 Sept 2026View
PARKING PLAN 1115 REVDSubstitute Plan23 Sept 2026View
WASTE COLLECTION PLAN 1116 REVDSubstitute Plan23 Sept 2026View
COMPLIANCE PLAN 1117 REVDSubstitute Plan23 Sept 2026View
ACCESSIBILITY PLAN 118 REVDSubstitute Plan23 Sept 2026View
STREETSCENE SECTIONS 1170 REVDSubstitute Plan23 Sept 2026View
PLOTS AS 1, OPP 4; PLOT AS 70 OXFORD STYLE FLOOR PLANS AND ELEVATIONS RVT-M4(2)HTDCC-2 1241 REVBSubstitute Plan23 Sept 2026View
PLOTS AS 54,126; PLOTS AS 65,87,167, OPP 76,170 OVERTON FLOOR PLANS AND ELEVATIONS RVT HTDCC-2 1250REVCSubstitute Plan23 Sept 2026View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 1 OF 2 5304-TTE-EX-XX-DR-L-1904 REVP13Substitute Plan23 Sept 2026View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 2 OF 2 5304-TTE-EX-XX-DR-L-9105 REVP14Substitute Plan23 Sept 2026View
LANDSCAPE AND SERVICE PLAN SHEET 1 OF 2 5304-TTE-EX-XX-DR-L-9108 REVP09Substitute Plan23 Sept 2026View
LANDSCAPE AND SERVICES PLAN SHEET 2 OF 2 5304-TTE-EX-XX-DR-L-9109 REVP09Substitute Plan23 Sept 2026View
DETAILED SOFT LANDSCAPE STRATEGY NEAP 5304-TTE-EX-XX-DR-L-9111 REVP12Substitute Plan23 Sept 2026View
DETAILED SOFT LANDSCAPE STRATEGY LEAP 5304-TTE-EX-XX-DR-L-9112 REVP12Substitute Plan23 Sept 2026View
DETAILED SOFT LANDCAPE STRATEGY LAP1 5304-TTE-EX-XX-DR-L-9113 REVP12Substitute Plan23 Sept 2026View
DETAILED SOFT LANDSCAPE STRATEGY LAP2 5304-TTE-EX-XX-DR-L-9114 REVP12Substitute Plan23 Sept 2026View
5304-TTE-EX-XX-DR-L-9105 RevP13 - Detailed Soft Landscape Strategy Sheet 2 of 2Substitute Plan8 Jul 2026View
PLOTS AS 152; OPP 151 FLOOR PLANS AND ELEVATIONS BUXTON 1220 REVASubstitute Plan8 Jun 2026View
PLOTS AS 18; AS MID 17; OPP 16 FLOOR PLANS BUXTON 1201 REVASubstitute Plan8 Jun 2026View
PLOTS AS 18; AS MID 17; OPP 16 ELEVATIONS BUXTON 1202 REVASubstitute Plan8 Jun 2026View
PLOTS AS 19; OPP 6, 20; AS 83,108; OPP 84, 109 LETCHWORTH FLOOR PLANS 1210 REVASubstitute Plan8 Jun 2026View
PLOTS AS 7,19; OPP 6,20 ELEVATIONS LETCHWORTH 1211 REVASubstitute Plan8 Jun 2026View
PLOTS AS 83,108; OPP 84,109 ELEVATIONS LETCHWORTH 1212 REVASubstitute Plan8 Jun 2026View
PLOTS OPP 35,37,39,41; OPP 138 FLOOR PLANS ANND ELEVATIONS WARWICK 1220 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 44,51; PLOTS AS 110,112,150; OPP 138,141,143 FLOOR PLANS AND ELEVATIONS 1221 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 53; OPP 5,32; PLOTS AS 113,149 FLOOR PLANS AND ELEVATIONS AMBERLEY 1230 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 90,91 FLOOR PLANS AND ELEVATIONS AMBERLEY 1231 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 2,104; AS 98,117,119; OPP 101 FLOOR PLANS AND ELEVATIONS OXFORD LIFESTYLE RVT-M4(S)HT DCC-2 1240 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 36,40,42,56; OPP 47,49,52; AS 1456; OPP 154 FLOOR PLANS AND ELEVATIONS LEAMIGTON LIFESTYLE HT DCC-2 1260 REVASubstitute Plan8 Jun 2026View
PLOTS AS 128; OPP 50; AS 142,155 FLOOR PLANS AND ELEVATIONS HARROGATE RVT HT DCC-2 1270 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 38,57,127; OPP 46; AS 115,165; OPP 111,114 FLOOR PLANS AND ELEVATIONS HARROGATE RVT HT DCC-2 1271 REVBSubstitute Plan8 Jun 2026View
PLOTS OPP 45,85 FLOOR PLANS AND ELEVATIONS CAMBRIDGE RVT HT DCC-2 1280 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 34,130; AS 144;OPP 140,153 FLOOR PLANS AND ELEVATIONS CAMBRIDGE RVT HT DCC-2 1281 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 55,129; OPP 103; OPP 88,92,97,99,118 FLOOR PLANS AND ELEVATIONS RVT-M4(20 HT DCC-2 1290 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 3; OPP 124; AS 69,72,89,96,100,120,123,166,168; OPP 71,86,94,105,107 FLOOR PLAN SHENLEY RVT-M4(2) HT DCC-2 1300 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 3; OPP 124; AS 69,72,89,96,100,120,123,166,168; OPP 71,86,94,105,107 ELEVATIONS HENLEY RVT-M4(2) JT DCC-2 1301 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 125; AS 67,73,93,95,122; OPP 106 FLOOR PLANS RICHMOND HT DCC-2 1310 REVASubstitute Plan8 Jun 2026View
PLOT AS 126; AS 67,73,93,95,122; OPP 106 ELEVATIONS RICHMOND HT DCC-2 1311 REVASubstitute Plan8 Jun 2026View
PLOTS AS 74,75,85; OPP 66,68,121,169 FLOOR PALNS HAMBSTEAD HT DCC-3 1320 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 74,75,85;,OPP 66,68,121,169 ELEVATIONS HAMPSTEAD HT DCC-3 1321 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 63,134,132,164; OPP 64,133,131,163 FLOOR PLANS TRENT HT DCC-2 1400 REVASubstitute Plan8 Jun 2026View
PLOTS AS 63,134; OPP 64,133 ELEVATIONS TRENT HT DCC-2 1401 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 132,164; OPP 131,163 ELEVATIONS TRENT HT DCC-2 1402 REVASubstitute Plan8 Jun 2026View
PLOTS AS 28; AS MID 30; OPP MID 29; OPP 31 FLOOR PLANS TRENT HT DCC-2 1403 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 28; AS MID 30; OPP MID 29; OPP 31 ELEVATIONS TRENT HT DCC-2 1404 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 23; OPP MID 24 OPP 25; AS 60,77,80; OPP MID 61,78,81; OPP 62,79,82 FLOOR PALNS TRENT HT DCC-2 1405 REVASubstitute Plan8 Jun 2026View
PLOTS AS 60,80; OPP MID 61,81; OPP 92,82 ELEATIONS TRENT HT DCC-2 1406 REVASubstitute Plan8 Jun 2026View
PLOTS AS 23, OPP MID 24, OPP 25; AS 77, OPP 78, OPP 79 ELEATIONS TRENT HT DCC-2 1407 REVASubstitute Plan8 Jun 2026View
PLOTS AS 8,14,21,26; OPP 9,15,22,27 FLOOR PLANS BRUE RVT-44(3) JT DCC-1 1410 REVASubstitute Plan8 Jun 2026View
PLOTS AS 8,14,21,26; OPP 9,15,22,27 ELEVATIONS BRUE RVT M4(3) HT DCC-1 1411 REVASubstitute Plan8 Jun 2026View
PLOTS AS 10,12,58; OPP 11,13,59; AS 160,162; OPP 159,161 FLOOR PLANS STOUR HT DCC-2 1420 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 58; OPP 59 ELEVATIONS STOUR HT DCC-2 1421 REVASubstitute Plan8 Jun 2026View
PLOTS AS 10,12; OPP 11,13; AS 160,162; OPP 159,161 ELEVATIONS STOUR HT DCC-2 1422 REVCSubstitute Plan8 Jun 2026View
PLOTS AS 135, AS MID 136, OPP 137 FLOOR PLANS BILSHAM RVT HT DCC-2 1425 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 135, AS MID 136, OPP 137 ELEVAITONS STOUR RVT HTDCC-2 1426REVBSubstitute Plan8 Jun 2026View
PLOT AS 148, OP MID 147, AS MID 146, OPP 145 FLOOR PLANS STOUR HT DCC-2 1427 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 148, OPP MID 147, AS MID 146, OPP 145 ELEVATIONS STOUR HT DCC-2 1428 REVBSubstitute Plan8 Jun 2026View
PLOTS AS 158; OPP 157 FLOOR PLANS TYNE HT DCC-2 1430 REVASubstitute Plan8 Jun 2026View
PLOTS AS 158; OPP 157 ELEVAITONS TYNE HT DCC-2 1431 REVASubstitute Plan8 Jun 2026View
PLOTS 5,32,33,34,35,36,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,56,57,90,91,110,111,116,127,128,130,138,139,142,143,444,153,156,165 FLOOR PLANS AND ELEVATIONS SINGLE GARAGE SGS2 1500 REVASubstitute Plan8 Jun 2026View
PLOTS 112/113,114,/115,140/141,154/155 FLOOR PLANS AND ELEVATIONS TWIN GARAGE DGT4 1501 REVASubstitute Plan8 Jun 2026View
TRANSPORT ASSESSMENT PART 1Statement23 Dec 2025View
TRANSPORT ASSESSMENT PART 2Statement23 Dec 2025View
TRANSPORT ASSESSMENT PART 3Statement23 Dec 2025View
TRANSPORT ASSESSMENT PART 4Statement23 Dec 2025View
TRANSPORT ASSESSMENT PART 4Statement23 Dec 2025View
TRANSPORT ASSESSMENT PART 6Statement23 Dec 2025View
TRANSPORT ASSESSMENT PART 7Statement23 Dec 2025View
COVER LETTERStatement23 Dec 2025View
PLANNING AND AFFORDABLE HOUSING STATEMENTStatement23 Dec 2025View
ECOLOGICAL IMPACT ASSESSMENTStatement23 Dec 2025View
AGRICULTURAL IMPACT ASSESSMENTStatement23 Dec 2025View
PHASE 1 DESK STUDY, SITE RECONNAISSANCE ADN PHASE 2 SITE INVESTIGATION REPORT PART 2Statement23 Dec 2025View
PHASE 1 DESK STUDY, SITE RECONNAISSANCE AND PHASE 2 SITE INVESTIGATION REPORT PART 4Statement23 Dec 2025View
PHASE 1 DESK STUDY, SITE RECONNAISSANCE AND PHASE 2 SITE INVESTIGATION REPORT PART 5Statement23 Dec 2025View
STATEMENT OF COMMUNITY INVOLVEMENTStatement23 Dec 2025View
PHASE 3 ARCHAEOLOGICAL STRIP, MAP AND RECORD EXCAVATIONStatement23 Dec 2025View
SUSTAINABILITY STATEMENTStatement23 Dec 2025View
BUILT HERITAGE STATEMENTStatement22 Dec 2025View
DASStatement22 Dec 2025View
DAS PART 2Statement22 Dec 2025View
DAS PART 3Statement22 Dec 2025View
DAS PART 4Statement22 Dec 2025View
FRA AND DRAINAGE STRATEGYSubstitute Document23 Sept 2026View
NEAP, LEAP AND LAP LANDSCAPE STATEMENT P03Substitute Document23 Sept 2026View
Biodiversity Net Gain Assessment Rev ESubstitute Document15 Jun 2026View
Bilsham Road Yapton The_Statutory_Biodiversity_Metric_Calculation_Tool 02.06.2026Substitute Document15 Jun 2026View
Bilsham Road Yapton The_Statutory_Biodiversity_Metric_Calculation_Tool 02.06.2026Substitute Document15 Jun 2026View
ARBORICULTURAL IMPACT ASSESSMENTSubstitute Document8 Jun 2026View
TREE SURVEY SCHEDULESubstitute Document8 Jun 2026View
CIL1 FORMSubstitute Document8 Jun 2026View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 1 OF 2 5304-RPS-EX-XX-DR-L-9104 REVP11Substitute Document23 Dec 2025View
GROUNDWATER IMPACT ASSESSMENTAdditional Docs29 Sept 2026View
SITE BOUNDARY SECTIONS 1171Additional Docs23 Sept 2026View
POS PLAN 5001 REVAAdditional Docs23 Sept 2026View
ILLISTRATIVE TREE, SHRUB AND GRASSLAND PALETTE 5304-TTE-EX-XX-DR-L-9140 & 9105 REVP04Additional Docs23 Sept 2026View
SUMMARY OF CHANGESAdditional Docs23 Sept 2026View
COVER LETTERAdditional Docs8 Jun 2026View
TREE CONSTRAINTS PLAN SHEET 1 OF 2 5304-RPS-EX-SS-DR-AR-9101 REVP02Additional Docs8 Jun 2026View
TREE CONSTRAINTS PLAN SHEET 2 OF 2 5304-RPS-EX-SS-CR-AR-1902 REVP02Additional Docs8 Jun 2026View
TREE REMOVAL AND PROTECTION PLAN 5034-RPS-XX-EX-DR-AR-1909 REVP06Additional Docs8 Jun 2026View
TREE REMOVAL AND PROTECTION PLAN SHEET 2 OF 2 5304-RPS-XX-EX-DR-AR-9110 REVP06Additional Docs8 Jun 2026View
TREE PROTECTION FENCING AND HOARDING PLAN 5304-RPS-XX-EX-DR-AR-9115 REVP02Additional Docs8 Jun 2026View
ILLUSTRATIVE TREE, SHRUB AND GRASSLAND PALETTEAdditional Docs8 Jun 2026View
PRELIMINARY CONCEPT PLAN STANDARED INTERCEPTION AREAS P25-3048-PEG-XX-XX-DR-C-001-P5Additional Docs8 Jun 2026View
ENGINEERING LAYOUT SHEET 1 OF 4 P25-3048-PEG-XX-XX-DR-C-101-P1Additional Docs8 Jun 2026View
ENGINEERING LAYOUT SHEET 2 OF 4 P25-3048-PEG-XX-XX-DR-C-102-P1Additional Docs8 Jun 2026View
ENGINEERING LAYOUT SHEET 3 OF 4 P25-3048-PEG-XX-XX-DR-C-103-P1Additional Docs8 Jun 2026View
ENGINEERING LAYOUT SHEET 4OF 4 P25-3048-PEG-XX-XX-DR-C-104-P1Additional Docs8 Jun 2026View
OVERALL ENGINEERING LAYOUT P25-3048-PEG-XXX-XX-DR-C-105-P1Additional Docs8 Jun 2026View
GENERAL ARRANGEMENT SHEET 1 OF 4 P25-3048-PEG-XX-XX-DR-C-106-P1Additional Docs8 Jun 2026View
GENERAL ARRANGEMENT SHEET 2 OF 4 P25-3048-PEG-XX-XX-DR-C-107-P1Additional Docs8 Jun 2026View
GENERAL ARRANGEMENT SHEET 3 OF 4 P25-3048-PEG-XX-XX-DR-C-108-P1Additional Docs8 Jun 2026View
GENERAL ARRANGEMENT SHEET 4 OF 4 P25-3048-PEG-XX-XX-DR-C-109-P1Additional Docs8 Jun 2026View
FIRE TENDER SWEPT PATH ANALYSIS P25-3048-PEG-XX-XX-DR-C-110-P1Additional Docs8 Jun 2026View
PRIVATE CAR SWEPT PATH ANALYSIS P25-3048-PEG-XX-XX-DR-C-112-P1Additional Docs8 Jun 2026View
PUMPING STATION SWEPT PATH ANALYSIS P25-3048-PEG-XX-XX-DR-C-113-P1Additional Docs8 Jun 2026View
SCHEMATIC SITE SECTIONS P25-3048-PEG-XX-XX-DR-C-114-P1Additional Docs8 Jun 2026View
IMPERMEABLE AREAS CATCHMENT PLAN P25-3048-PEG-XX-XX-DR-C-115-P1Additional Docs8 Jun 2026View
TECHNICAL NOTEAdditional Docs8 Jun 2026View
Conservation OfficerConsultation1 Oct 2026View
Engineers Comments Regarding Surface Water DrainageConsultation15 Jul 2026View
National Highways responseConsultation13 Jul 2026View
National Highways responseConsultation10 Jul 2026View
Ecology OfficerConsultation30 Jun 2026View
Conservation OfficerConsultation26 Jun 2026View
WSCC - Flood Risk Management TeamConsultation26 Jun 2026View
WSCC HighwaysConsultation25 Jun 2026View
FS further commentConsultation15 Jun 2026View
Environment Agency responseConsultation11 Jun 2026View
Active Travel England responseConsultation11 Jun 2026View
FRS Water and AccessConsultation10 Jun 2026View
Conservation Officer responseConsultation26 Feb 2026View
National Highways responseConsultation27 Jan 2026View
Environmental Health responseConsultation19 Jan 2026View
Ecologist responseConsultation16 Jan 2026View
Surface Water Drainage (WSCC) responseConsultation14 Jan 2026View
West Sussex Highways responseConsultation13 Jan 2026View
Archaeology advisorConsultation13 Jan 2026View
Active Travel England responseConsultation9 Jan 2026View
West Sussex Fire and Rescue responseConsultation8 Jan 2026View
Rep LettersRep Letters9 Oct 2026View
Rep LettersRep Letters9 Oct 2026View
Rep LettersRep Letters2 Oct 2026View
Rep LettersRep Letters1 Oct 2026View
Rep LettersRep Letters1 Oct 2026View
Rep LettersRep Letters1 Oct 2026View
Rep LettersRep Letters29 Sept 2026View
Rep LettersRep Letters23 Sept 2026View
Rep LettersRep Letters11 Sept 2026View
Rep LettersRep Letters4 Sept 2026View
Rep LettersRep Letters21 Aug 2026View
Rep LettersRep Letters20 Aug 2026View
Rep LettersRep Letters28 Jul 2026View
Rep LettersRep Letters28 Jul 2026View
Rep LettersRep Letters28 Jul 2026View
Rep LettersRep Letters24 Jul 2026View
Rep LettersRep Letters21 Jul 2026View
Rep LettersRep Letters10 Jul 2026View
Rep LettersRep Letters10 Jul 2026View
Rep LettersRep Letters8 Jul 2026View
Rep LettersRep Letters7 Jul 2026View
Rep LettersRep Letters3 Jul 2026View
Rep LettersRep Letters26 Jun 2026View
Rep LettersRep Letters25 Jun 2026View
Rep LettersRep Letters27 Apr 2026View
Rep LettersRep Letters27 Apr 2026View
Rep LettersRep Letters10 Mar 2026View
Rep LettersRep Letters17 Feb 2026View
REPRep Letters16 Feb 2026View
REPRep Letters9 Feb 2026View
Rep LettersRep Letters6 Feb 2026View
Rep LettersRep Letters5 Feb 2026View
Rep LettersRep Letters4 Feb 2026View
Rep LettersRep Letters4 Feb 2026View
REPRep Letters3 Feb 2026View
Rep LettersRep Letters27 Jan 2026View
Rep LettersRep Letters27 Jan 2026View
Rep LettersRep Letters27 Jan 2026View
Rep LettersRep Letters27 Jan 2026View
Rep LettersRep Letters26 Jan 2026View
Rep LettersRep Letters23 Jan 2026View
Rep LettersRep Letters13 Jan 2026View
Rep LettersRep Letters12 Jan 2026View
Rep LettersRep Letters12 Jan 2026View
Rep LettersRep Letters6 Jan 2026View
Rep LettersRep Letters2 Jan 2026View
Planning CorrespondencePlanning Correspondence9 Oct 2026View
Planning CorrespondencePlanning Correspondence6 Oct 2026View
Regarding change to Ctte DatePlanning Correspondence6 Oct 2026View
Planning CorrespondencePlanning Correspondence30 Sept 2026View
Planning CorrespondencePlanning Correspondence24 Sept 2026View
18 Sept ref Scheme Changes and request for clarificationPlanning Correspondence24 Sept 2026View
Planning CorrespondencePlanning Correspondence24 Sept 2026View
Extension of Time until 23/10/26Planning Correspondence23 Sept 2026View
Planning CorrespondencePlanning Correspondence23 Sept 2026View
Planning CorrespondencePlanning Correspondence21 Sept 2026View
With a local resident regarding current situation of the applicationPlanning Correspondence16 Sept 2026View
Planning CorrespondencePlanning Correspondence9 Sept 2026View
Planning CorrespondencePlanning Correspondence19 Aug 2026View
Extension of Time until 24 September 2026Planning Correspondence28 Jul 2026View
Planning CorrespondencePlanning Correspondence10 Jul 2026View
EMAIL 7.7.26 subplansPlanning Correspondence8 Jul 2026View
Response to Objection ref Hemlock Drop WortPlanning Correspondence26 Jun 2026View
EMAIL 11.6.26 subplansPlanning Correspondence15 Jun 2026View
Response to Resident Objections Raised so farPlanning Correspondence3 Jun 2026View
Planning CorrespondencePlanning Correspondence29 May 2026View
Including Agreement to an Extension of Time until 24 July 2026Planning Correspondence29 Apr 2026View
Update on ProgressPlanning Correspondence28 Apr 2026View
Planning CorrespondencePlanning Correspondence23 Apr 2026View
Extension of Time until 18 MayPlanning Correspondence18 Mar 2026View
Update on Drainage SubmissionPlanning Correspondence12 Mar 2026View
Ref scope of S73 to amend conditions/consider drainage issuesPlanning Correspondence16 Jan 2026View
Confirming that the Scheme/Plans are exactly the same as Y/32/25/PLPlanning Correspondence16 Jan 2026View
FRA AND DRAINAGE STRAGEGY PART 2Planning Correspondence23 Dec 2025View
Systems CorrespondenceSystems Correspondence23 Dec 2025View
Systems CorrespondenceSystems Correspondence23 Dec 2025View
5304-TTE-EX-XX-DR-L-9109 RevP09 - Landscape and Services Plan Sheet 2 of 2Superseded Document8 Jul 2026View
PLANNING LAYOUT 1100 REVFSuperseded Document8 Jun 2026View
MATERIALS PLAN 1111 REVDSuperseded Document8 Jun 2026View
STOREY HEIGHTS PLAN 1112 REVCSuperseded Document8 Jun 2026View
ENCLOSURES PLAN 1113 REVDSuperseded Document8 Jun 2026View
AFFORDABLE HOUSING PLAN 1114 REVCSuperseded Document8 Jun 2026View
PARKING PLAN 1115 REVCSuperseded Document8 Jun 2026View
WASTE COLLECTION PLAN 1116 REVCSuperseded Document8 Jun 2026View
COMPLIANCE PLAN 1117 REVCSuperseded Document8 Jun 2026View
ACCESSIBILITY PLAN 1118 REVCBSuperseded Document8 Jun 2026View
STREET SCENES SECTIONS 1170 REVCSuperseded Document8 Jun 2026View
PLOT OPP 4; AS 70 FLOOR PLANS AND ELEVATIONS OXFORD LIFESTYLE RVT-M4(S)HT DCC-2 1241 REVASuperseded Document8 Jun 2026View
PLOTS AS 1,5,126; AS 65,87,167; OPP 76,170 FLOOR PLANS AND ELEVATIONS OVERTON RVT HTDCC-2 1250 REVBSuperseded Document8 Jun 2026View
DETAILED SOFT LANDSCAPE STRATEGY LAP2 5304-RPS-EX-XX-DR-L-9114 REVP11Superseded Document8 Jun 2026View
DETAILED SOFT LANDSCAPE STRATEGY LAP 1 5304-RPS-EX-XX-DR-L-9113 REVP11Superseded Document8 Jun 2026View
DETAILED SOFT LANDSCAPE STRATEGY LEAP 5304-RPS-EX-XX-DR-L-9112 REVP11Superseded Document8 Jun 2026View
DETAILED SOFT LANDSCAPE STRATEGY NEAP 5304-RPS-EX-XX-DR-L-9111 REVP11Superseded Document8 Jun 2026View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 1 OF 2 5304-RPS-EX-XX-DR-L-9104 REVP12Superseded Document8 Jun 2026View
DETAILED SOFT LANDSDCAPE STRATEGY SHEET 2 OF 2 5304-RPS-EX-XX-DR-L-9105 REVP12Superseded Document8 Jun 2026View
LANDSCAPE AND SERVICES PLAN SHEET 1 OF 2 5304-RPS-EX-XX-DR-L-1908 REVP08Superseded Document8 Jun 2026View
LANDSCAPE AND SERVICES PLAN SHEET 2 OF 2 5304-RPS-EX-XX-DR-L-9109 REVP08Superseded Document8 Jun 2026View
FRA AND DRAINAGE STRATEGYSuperseded Document8 Jun 2026View
NEAP, LEAP AND LAP LANDSCAPE STATEMENT P02Superseded Document8 Jun 2026View
NEAP, LEAP AND LAP LANDSCAPE STATEMENT P02Superseded Document8 Jun 2026View
PLOTS AS 121,155; OPP 35,37,39,116,125,134 WARWICK FLOOR PLANS AND E3LEVATIONS 1220 REVBSuperseded Document23 Dec 2025View
PLOTS AS 44,51,152,165; OPP 35,43,124,133,143,145,158 WARWICK FLOOR PLANS AND ELEVATIONS 1221 REVBSuperseded Document23 Dec 2025View
PLOTS AS 53,151; OPP 5,32,166 AMBERLEY FLOOR PLANS AND ELEVATIONS 1230 REVBSuperseded Document23 Dec 2025View
PLOTS AS 2, 99,112,114; OPP 73,102,128 OXFORD LIFESTYLE FLOOR PLANS AND ELEVATIONS 1240 REVASuperseded Document23 Dec 2025View
PLOTS AS 1,54,67,108,167; OPP 170 OVERTON FLOOR PLANS AND ELEVATIONS 1250 REVASuperseded Document23 Dec 2025View
PLOTS AS 3,68,69,72,84,97,101,105; OPP 71,87,89,91,95,106,127,128 HENLEY FLOOR PLANS 1300 REVASuperseded Document23 Dec 2025View
PLOTS AS 3,68,69,72,84,97,101,105; OPP 71,87,89,91,93,95,106,127,168 HENLEY ELEVATIONS 301 REVASuperseded Document23 Dec 2025View
PLOTS AS 66,86,90,92,103,169; OPP 111 FLOOR PLANS 1320 REVASuperseded Document23 Dec 2025View
PLOTS AS 66,86,90,92,103; OPP 111 HAMPSTEAD ELEVATIONS 1321 REVASuperseded Document23 Dec 2025View
PLOTS AS 28; AS MID 30; OP MID 29, OP 31 ELEVATIONS TRENT 1404 REVBSuperseded Document23 Dec 2025View
PLOTS AS 10,12,58,159,161; OPP 11,13,59,160,162 STOUR FLOOR PLANS 2138 REVBSuperseded Document23 Dec 2025View
PLOTS AS 10,12,159,161; OPP 11,13,160,162 STOUR ELEVATIONS 1422 REVBSuperseded Document23 Dec 2025View
PLOTS AS 147; OPP MID 148; AS MID 149; OPP 150 STOURE FLOOR PLANS 1427 REVASuperseded Document23 Dec 2025View
PLOTS AS 147; OPP MID 148; AS MID 149; OPP 150 STOUR ELEVATIONS 1428 REVASuperseded Document23 Dec 2025View
FRA AND DRAINAGE STRATEGY PART 1Superseded Document23 Dec 2025View
FRA AND DRAINAGE STRATEGY PART 3Superseded Document23 Dec 2025View
REFUSE VEHICLE SWWEPT PATH ANALYSIS SHEET 1 24-217-202 REVDSuperseded Document23 Dec 2025View
REFUSE VEHICLE SWEPT PATH ANALYSIS SHEET 2 24-217-203 REVDSuperseded Document23 Dec 2025View
FIRE TENDER SWEPT PATH ANALYSIS SHEET 1 24-217-204 REVDSuperseded Document23 Dec 2025View
FIRE TENDER SWEPT PATH ANALYSIS SHEET 2 24-217-205 REVDSuperseded Document23 Dec 2025View
CAR SWEPT PATH ANALYSIS SHEET 1 OF 2 24-217-206 REVDSuperseded Document23 Dec 2025View
CAR SWEPT PATH ANALYSIS SHEET 2 OF 2 24-217-207 REVDSuperseded Document23 Dec 2025View
WASTE TANKER ACCESS TO PUMPING STATION SHEET 1 24-217-208 REVDSuperseded Document23 Dec 2025View
WASTE TANKER ACCESS TO PUMPING STATION SHEET 2 24-217-209 REVDSuperseded Document23 Dec 2025View
INDICATIVE SERVICE AND DRAINAGE CORRIDORS 24-217-210 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS CONSTRUCTION DTAILS 24-217-213Superseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 1 OF 8 24-217-214 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 2 OF 8 24-217-215 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 3 OF 8 24-217-216 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 4 OF 8 24-217-217 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 5 OF 8 24-217-218 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 6 OF 8 24-217-219 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 7 OF 8 24-217-220 REVCSuperseded Document23 Dec 2025View
PROPOSED LEVELS LAYOUT SHEET 8 OF 8 24--217-221 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 1 OF 8 24-217-222 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 2 OF 8 24-217-223 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 3 OF 8 24-217-224 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 4 OF 8 24-217-225 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 5 OF 8 24-217-226 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 6 OF 8 24-217-227 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAIANGE LAYOUT SHEET 7 OF 8 24-217-238 REVCSuperseded Document23 Dec 2025View
PROPOSED SURFACE WATER DRAINAGE LAYOUT SHEET 7 OF 8 24-217-229 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAYOUT SHEET 1 OF 8 24-217-230 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAYOUT SHEET 2 OF 8 24*217-231 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAIANGE LAUOUT SHEET 3 OF 8 24-217-232 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAYOUT SHEET 4 OF 8 24-217-233 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAUOUT SHEET 5 OF 8 24-217-234 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAYOUT SHEET 6 OF 8 24-217-235 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAYOUT SHEET 7 OF 8 24-217-236 REVCSuperseded Document23 Dec 2025View
PROPOSED FOUL WATER DRAINAGE LAYOUT SHEET 8 OF 8 24-217-237 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 1 OF 8 24-217-238 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 2 OF 8 24-217-239 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 3OF 8 24-217-240 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 4 OF 8 24-217-241 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 5 OF 8 24-217-242 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 6 OF 8 24-217-243 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 6 OF 8 24-217-244 REVCSuperseded Document23 Dec 2025View
PRELIMINARY EXTERNAL WORKS SHEET 6 OF 8 24-217-245 REVCSuperseded Document23 Dec 2025View
PRELIMINARY DRAINAGE CONSTRUCTION DETAILS HSEET 1 24-217-253Superseded Document23 Dec 2025View
PRELIMINARY DRAINAGE CONSTRUCITON DETAILS SHEET 2 24-217-154Superseded Document23 Dec 2025View
OVERALL LEVELS LAYOUT 170 UNIT REPLAN 24-217-255 REVCSuperseded Document23 Dec 2025View
OVERALL DRAINAGE LAYOUT 170 UNIT REPLAN 24-217-256 REVCSuperseded Document23 Dec 2025View
PROPOSED EXTERNAL WORKS 170 UNIT REPLAN 24-217-257 REVCSuperseded Document23 Dec 2025View
SCHEMATIC SITE CROSS SECTIONS SHEET 1 OF 2 24-217-258 REVBSuperseded Document23 Dec 2025View
SCHEMATIC SITE CROSS SECTIONS SHEET 2 OF 2 24-217-259 REVBSuperseded Document23 Dec 2025View
CIL 1 FORMSuperseded Document23 Dec 2025View
DETAILED SOFT LANDSCAPE STRATEGY SHEET 2 OF 2 5304-RPS-EX-XX-DR-L-9105 REVP11Superseded Document23 Dec 2025View
LANDSCAPE AND SERVICE PLAN SHEET 1 OF 2 9304-RPS-EX-XX-DR-L-9108 REVP07Superseded Document23 Dec 2025View
LANDSCAPE AND SERVICES PLAN SHEET 2 OF 2 5304-RPS-EX-XX-DR-L-9109 REVP07Superseded Document23 Dec 2025View
BIODIVERSITY NET GAIN ASSESSMENTSuperseded Document23 Dec 2025View
PLOTS AS 115 AMBERLEY FLOOR PLANS AND ELEVATIONS 1231 REVASuperseded Document23 Dec 2025View
BNG METRIC EXCELSuperseded Document23 Dec 2025View
BNG METRIC PDFSuperseded Document23 Dec 2025View
PLOTS AS 8,14,21,26; OPP 9,15,22,27 BRUE ELEVATIONS 2138Superseded Document23 Dec 2025View
PLOTS AS 8,14,21,26; OPP 9,15,22,27 BRUE ELEVATIONS 1411Superseded Document23 Dec 2025View
PLOTS AS 154; OP 153 BUXTON FLOOR PLANS AND ELEVATIONS 1200Superseded Document23 Dec 2025View
PLOTS AS 18; ASMID 17; OP 16 BUXTON FLOOR PLANS 1201Superseded Document23 Dec 2025View
PLOTS AS 18; AS MID 17; OP 16 BUXTON ELEVATIONS 1202Superseded Document23 Dec 2025View
PLOTS AS 41; OP 45,48 CAMBRIDGE FLOOR PLANS AND ELEVAIONS 1280 REVASuperseded Document23 Dec 2025View
PLOTS AS 24,38,117,119,129,146; OP 142 CAMBRIDGE FLOOR PLANS AND ELEVAITONS 1281 REVASuperseded Document23 Dec 2025View
PLOTS AS 131,144,157; OP 50 HARROGATE FLOOR PLANS AND ELEVATIONS 1270 REVASuperseded Document23 Dec 2025View
PLOTS AS 57,118,132; OP 46 HARROGATE FLOOR PLANS AND ELEVATIONS 1271 REVASuperseded Document23 Dec 2025View
PLOTS AS 36,40,42,56,120,126; OP 40,49,52,109,156 LEAMINGTON LIFESTYLE FLOOR PLANS AND ELEVATIONS 1260Superseded Document23 Dec 2025View
PLOTS AS 7,19,82,123; OP 6,20,83,122 LETCHWORTH FLOOR PLANS 1210Superseded Document23 Dec 2025View
PLOTS AS 7,19; OP 6,20 LETCHWORTH ELEVATIONS 1211Superseded Document23 Dec 2025View
PLOTS AS 82,123; OP 83,122 LETCHWORTH ELEVATIONS 1212Superseded Document23 Dec 2025View
PLOTS AS 55,130; OP 98,100,110,113 MARLOW FLOOR PLANS AND ELEVATIONS 1290 REVASuperseded Document23 Dec 2025View
PLOTS AS 10; OP 4 OXFORD LIFESTYLE FLOOR PLANS AND ELEVATIONS 1241Superseded Document23 Dec 2025View
PLOTS AS 85,88,96,104,107; OP 67,94 RICHMOND FLOOR PLANS 1310Superseded Document23 Dec 2025View
PLOTS AS 85,88,96,104,107; OP 67,94 RICHMOND ELEVATIONS 1311Superseded Document23 Dec 2025View
PLOTS 5,312,33,34,35,36,37339,39,40,41,42,43,44,45,43,47,48,49,50,51,52,53,56,57,109,115,116,117,118,119,124,125,126,129,131,132,133,134,144,145,146,155,158 SINGLE GAREGE FLOOR PLAN AND ELEVATIONS 1500Superseded Document23 Dec 2025View
PLOTS AS 58; OP 59 STOUR ELEVATIONS 1421Superseded Document23 Dec 2025View
PLOTS AS 139; AS MIOD 140; OPP 141 STOUR FLOOR PLANS 1425 REVASuperseded Document23 Dec 2025View
PLOTS AS 139; AS MID 140; OP 141 STOUR ELEVATIONS 1426 REVASuperseded Document23 Dec 2025View
TREE SURVEY SCHEDULESuperseded Document23 Dec 2025View
PLOTS AS 63,136,138,164; OPP 64,135,137,163 TRENT FLOOR PLANS 1400Superseded Document23 Dec 2025View
PLOTS AS 63,138; OP 64,137 TRENT ELEVATIONS 1401Superseded Document23 Dec 2025View
PLOTS AS 136,164; OP 135,163TRENT ELEVATIONS 1402Superseded Document23 Dec 2025View
PLOTS AS 28; ASMID 30;OPMID 29; OP 31 TRENT FLOOR PLANS 1403 REVASuperseded Document23 Dec 2025View
PLOTS AS 23,76,60,79; LP MID 24,75,61,80; OP 25,62,76,81 TRENT FLOOR PLANS 1405Superseded Document23 Dec 2025View
PLOTS AS 60,74,79; OP MID 61,75,80; OP 62,76,81 TRENT ELEVATIONS 1406Superseded Document23 Dec 2025View
PLOTS AS 23; OP MID 24; OP 25 TRENT ELEVATIONS 1407Superseded Document23 Dec 2025View
PLOTS 120/121, 142/143, 156/157,165/166 TWIN GARAGE FLOOR PLAN AND ELEVATIONS 1501Superseded Document23 Dec 2025View
PLOTS AS 77; OP 78 TYNE FLOO RPLANS 1430Superseded Document23 Dec 2025View
PLOTS AS 77; OP 78 TYNE ELEVATIONS 1431Superseded Document23 Dec 2025View
PLANNING LAYOUT 1100 REVBSuperseded Document22 Dec 2025View
MATERIALS PLAN 1111 REVBSuperseded Document22 Dec 2025View
STOREY HEIGHTS PLAN 1112 REVBSuperseded Document22 Dec 2025View
ENCLOSURES PLAN 1113 REVBSuperseded Document22 Dec 2025View
AFFORDABLE HOUSING PLAN 1114 REVBSuperseded Document22 Dec 2025View
PARKING PLAN 1115 REVBSuperseded Document22 Dec 2025View
WASTE COLLECTION PLAN 1116 REVBSuperseded Document22 Dec 2025View
COMPLIANCE PLAN 1117 REVBSuperseded Document22 Dec 2025View
ACCESSIBILITY PLAN 1118 REVBSuperseded Document22 Dec 2025View
STREET SCENE SECTIONS 1170 REVBSuperseded Document22 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.