Council planning record

Approval of details reserved by condition imposed under ref Y/49/18/PL relating to Condition No.6 Construction & Environment Management, No.7 contamination, No.9 surface water drainage, No.10 maintenance & management of surface water drainage, No.12 materials & finishes and No.16 surface water onto public highway.

Land East of North End Road Yapton BN18 0AG

DOC ApprovedReference: Y/21/19/DOCArun District Council

Last published check: 3 Oct 2026, 18:20. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decided

    Published milestoneCouncil source

Application summary

Status
DOC Approved
Application type
Not published
Received
11 Mar 2019
Validated
12 Mar 2019
Determination deadline
7 May 2019
Local authority
Arun District Council

Application overview

Approval of details reserved by condition imposed under ref Y/49/18/PL relating to Condition No.6 Construction & Environment Management, No.7 contamination, No.9 surface water drainage, No.10 maintenance & management of surface water drainage, No.12 materials & finishes and No.16 surface water onto public highway.

Proposal details

Reference
Y/21/19/DOC
Parish
Yapton
Agent
Crayfern Homes Ltd Victoria House 14 St Johns Road Hedge End Southampton SO304AB

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land East of North End Road Yapton BN18 0AG

This record has no verified map location.

Documents 54 of 54

DocumentPublishedAction
DecisionDecision3 Jul 2019View
DecisionDecision3 Jul 2019View
DecisionDecision3 Jul 2019View
DecisionDecision3 Jul 2019View
DecisionDecision3 Jul 2019View
DecisionDecision3 Jul 2019View
DecisionDecision3 Jul 2019View
Covering email re substitute SuDS Manual and external wall design 25/03/19Application8 Apr 2019View
Application FormApplication15 Mar 2019View
Site Layout plan dwg. 14_16_102Plans14 Mar 2019View
Engineering Details Levels Layout plan dwg. ES1801 509-01 Rev CPlans14 Mar 2019View
Channel Levels & Road 2 added plan dwg. ES1801 503-01 Rev BPlans14 Mar 2019View
Engineering Details Kerb and Surface Finishes plan dwg. ES1801 504-01 Rev CPlans14 Mar 2019View
Engineering Details Drainage Proposals plan dwg. ES1801 502-01 rev EPlans14 Mar 2019View
Engineering Details Standard Construction Details plan dwg. Dwg. ES1801 501-01Plans14 Mar 2019View
Drainage planPlans14 Mar 2019View
Engineering Details Standard Construction Details plan dwg. ES1801 501-02 Rev BPlans14 Mar 2019View
Materials SchedulePlans14 Mar 2019View
Engineering Details Drainage Proposals plan dwg. ES1801 502-01 Rev EPlans14 Mar 2019View
Phase II Ground Investigation Report (Feb 2018) Ref: 16671/GIRStatement14 Mar 2019View
Covering Letter - Soil Drainage Investiagtion plansStatement14 Mar 2019View
Orchard Business Park - Summary of Soil-Gas ConditionsStatement14 Mar 2019View
Mirco Drainage - SuDs TestStatement14 Mar 2019View
Mirco Drainage Suds Results testStatement14 Mar 2019View
SuDS Operations and Maintenence Manual Rev BSubstitute Document8 Apr 2019View
REMDIATION STATEMENT J1667Additional Docs10 May 2019View
16671 PHASE 1 DESK STUDY JAN 2018Additional Docs24 Apr 2019View
SOIL GAS RISK ASSESSMENTAdditional Docs24 Apr 2019View
EMAIL FROM AGENT 16-04-2019Additional Docs24 Apr 2019View
eXTERNAL WALL DETAILS 14.16_505Additional Docs8 Apr 2019View
WSCC-Consulation(condition 16)Consultation28 Jun 2019View
FURTHER COMMENTS FROM ENVIRONMENTAL HEALTHConsultation19 Jun 2019View
Further EH CommentsConsultation3 Jun 2019View
Further comments from Environmental Health. 22/5/19Consultation23 May 2019View
Further Environmental Health commentsConsultation20 May 2019View
Further Environmental Health CommentsConsultation9 May 2019View
ENVIRONMENTAL HEALTHConsultation2 May 2019View
FURTHER ENVIRONMENTAL HEALTH COMMENTSConsultation16 Apr 2019View
ENVIRONMENTAL HEALTHConsultation16 Apr 2019View
WSCC-Highways. 2/4/19Consultation3 Apr 2019View
2ND DRAINAGE RESPONSEConsultation27 Mar 2019View
ADC ENGINEERS (DRAINAGE)Consultation21 Mar 2019View
OFFICERS EMAIL 11-06-2019Planning Correspondence24 Jun 2019View
Planning CorrespondencePlanning Correspondence13 Jun 2019View
Planning CorrespondencePlanning Correspondence23 May 2019View
Planning CorrespondencePlanning Correspondence22 May 2019View
Application CorrespondencePlanning Correspondence10 May 2019View
OFFICERS EMAIL 30-04-2019Planning Correspondence10 May 2019View
Planning CorrespondencePlanning Correspondence7 May 2019View
OFFICERS EMAIL 15-04-2019Planning Correspondence24 Apr 2019View
OFFICERS EMAIL 17-04-2019Planning Correspondence24 Apr 2019View
DOCACKSystems Correspondence18 Mar 2019View
PMAC71PSystems Correspondence15 Mar 2019View
SuDS Operations & Maintenance Manual Ref: ES1801 SuDsSuperseded Document14 Mar 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOC Approved
Decision Decision Decision Decision Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.