Council planning record

Application for approval of matters reserved by condition imposed under WA/34/17/PL relating to conditions 3-schedule of materials & finishes, 4-surface water drainage, 5-Construction Management Plan, 10-Arboricultural Method Statement, 11-details of dimensions, materials & construction of existing pier & 12-sample panel of flint walling erected on site.

The Red Cottage The Street Walberton BN18 0PQ

DOC ApprovedReference: WA/78/17/DOCArun District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decided

    Published milestoneCouncil source

Application summary

Status
DOC Approved
Application type
Not published
Received
8 Nov 2017
Validated
16 Nov 2017
Determination deadline
11 Jan 2018
Local authority
Arun District Council

Application overview

Application for approval of matters reserved by condition imposed under WA/34/17/PL relating to conditions 3-schedule of materials & finishes, 4-surface water drainage, 5-Construction Management Plan, 10-Arboricultural Method Statement, 11-details of dimensions, materials & construction of existing pier & 12-sample panel of flint walling erected on site.

Proposal details

Reference
WA/78/17/DOC
Parish
Walberton
Agent
Harrington Desigh Architects Unit 1 Broadbridge Business Centre Delling Lane Bosham Chichester PO18 8NF

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The Red Cottage The Street Walberton BN18 0PQ

This record has no verified map location.

Documents 48 of 48

DocumentPublishedAction
DecisionDecision15 Feb 2018View
DecisionDecision11 Jan 2018View
DecisionDecision11 Jan 2018View
DecisionDecision11 Jan 2018View
DecisionDecision11 Jan 2018View
DecisionDecision11 Jan 2018View
Covering email extra information 11/02/18Application14 Feb 2018View
Covering email with amended plan and drawing sheet 08/02/18Application13 Feb 2018View
ApplicationApplication16 Nov 2017View
COVERING LETTERApplication9 Nov 2017View
Substitute plan 09/02/18 Site plan showing below ground surface water drainage with details and sections 36/502CPlans14 Feb 2018View
Drawing sheet with amended plan 08/02/17Plans13 Feb 2018View
Superceded 11/02/18 Site plan with details and section 536-502 rev B 08/02/18Plans13 Feb 2018View
External Drainage Layout - 100 - Rev P1Plans1 Feb 2018View
SITE PLAN SHOWING BELOW GROUND SURFACE WATER DRAINAGE. DRG 536/500 CPlans16 Jan 2018View
Pier elevationsPlans9 Nov 2017View
Site plan 500BPlans9 Nov 2017View
Typical Section SoakawayPlans9 Nov 2017View
Arboricultural Audit and SupervisionStatement6 Jun 2018View
Arboricultural SupervisionStatement3 Apr 2018View
Polystorm anf polystormLite Technical GuideStatement14 Feb 2018View
Polystorm Soakaway Geotextile Data Sheet Issue 1 Feb 2017Statement14 Feb 2018View
Substitute soakaway design date 18/01/2018Statement14 Feb 2018View
Paving DetailsStatement22 Jan 2018View
ARBORICULTURAL METHOD STATEMENTStatement16 Nov 2017View
Materials scheduleStatement9 Nov 2017View
Construction Management planStatement9 Nov 2017View
Drainage & Coastal Engineer. 14/2/18Consultation15 Feb 2018View
Drainage & Coastal Engineer. 6/2/18Consultation7 Feb 2018View
ARBORICULTURISTConsultation19 Jan 2018View
ArboriculturistConsultation18 Jan 2018View
Tree OfficerConsultation10 Jan 2018View
WSCC (ROW/STRATEGY/HIGHWAYS0Consultation11 Dec 2017View
Drainae & Coastal Engineer. 6/12/17Consultation7 Dec 2017View
Conservation OfficerConsultation30 Nov 2017View
Planning CorrespondencePlanning Correspondence1 Feb 2018View
Planning CorrespondencePlanning Correspondence22 Jan 2018View
Planning CorrespondencePlanning Correspondence22 Jan 2018View
Planning CorrespondencePlanning Correspondence22 Jan 2018View
EMAIL EXCHANGE WITH DRAINAGE ENGINEERSPlanning Correspondence19 Jan 2018View
PERCOLATION TEST 3Planning Correspondence19 Jan 2018View
Confirmation of permeable surfacePlanning Correspondence19 Jan 2018View
EMAIL EXCHANGE WITH ENGINEER (DRAINAGE)Planning Correspondence18 Jan 2018View
EMAIL EXCHANGE BETWEEN P CANN AND HAWORTH MCCALL + PHOTOSPlanning Correspondence16 Jan 2018View
Superceded 11/02/18 SOAKAWAY DESIGNPlanning Correspondence16 Jan 2018View
DOCACKSystems Correspondence16 Nov 2017View
PINCAG1Systems Correspondence15 Nov 2017View
PMAC71PSystems Correspondence9 Nov 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOC Approved
Decision Decision Decision Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.