Council planning record

Erection of 1 No. self build dwelling with associated parking and landscaping (resubmission following WA/101/24/PL). This application is a departure from the Development Plan and is in CIL Zone 3 and is CIL Liable as a new dwelling.

Longacres Eastergate Lane Walberton BN18 0BA

App Cond with S106Reference: WA/44/25/PLArun District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
App Cond with S106
Application type
Not published
Received
6 Jun 2025
Validated
18 Nov 2025
Determination deadline
17 Feb 2026
Local authority
Arun District Council

Application overview

Erection of 1 No. self build dwelling with associated parking and landscaping (resubmission following WA/101/24/PL). This application is a departure from the Development Plan and is in CIL Zone 3 and is CIL Liable as a new dwelling.

Proposal details

Reference
WA/44/25/PL
Parish
Walberton
Agent
Mr and Mrs T Pearce 10 Peckham Close Eastergate PO20 3AR

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Longacres Eastergate Lane Walberton BN18 0BA

This record has no verified map location.

Documents 63 of 63

DocumentPublishedAction
DecisionDecision17 Feb 2026View
Officers ReportOfficers Report17 Feb 2026View
Completed agreement dated 16.02.26Section 106 Planning Agreement7 May 2026View
S106 Unilateral UndertakingSection 106 Planning Agreement17 Feb 2026View
Application Form - Without Personal DataApplication6 Jun 2025View
Form 6 Commencement NoticeCIL Form4 Sept 2026View
CIL 1 FORMCIL Form18 Jun 2025View
CIL 2 FORMCIL Form18 Jun 2025View
CIL 7 FORMCIL Form18 Jun 2025View
CIL COMMENCEMENT NOTICE ACKCIL Correspondence1 Sept 2026View
CIL COMMENCEMENT NOTICE ACKCIL Correspondence1 Sept 2026View
CIL LIBAILITY NOTICECIL Correspondence17 Feb 2026View
CIL LIBAILITY NOTICECIL Correspondence17 Feb 2026View
SITE DRAINAGE STRATEGY 13467/1101 REVP2Plans6 Jun 2025View
IMPERMEABLE CATCHMENT PLAN 13467/1102 REVP2Plans6 Jun 2025View
PROPOSED GROUND FLOOR PLAN AND PROPOSED SOUTH AND WEST ELEVATIONS 3CPlans6 Jun 2025View
PROPOSED FIRST FLOOR PLAN, PROPOSED NORTH AND EAST ELEVATIONS 4BPlans6 Jun 2025View
Block and location plan 1bSubstitute Plan1 Dec 2025View
Existing location plan 5aSubstitute Plan1 Dec 2025View
Site plan 2ESubstitute Plan1 Dec 2025View
FRA AND DRAINAGE IMPACT ASSESSMENTStatement9 Jun 2025View
DRAINAGE TECHNICAL NOTEStatement9 Jun 2025View
TREE SURVEY AND ARBORICULTURAL IMPACT ASSESSMENTStatement9 Jun 2025View
IN SITU INFILTRATION TEST REPORTStatement9 Jun 2025View
DRAINAGE CALCULATIONSStatement6 Jun 2025View
GREENFIELD RUNOFF RATE ESTIMATION FOR SITEStatement6 Jun 2025View
DASStatement6 Jun 2025View
AGRICULTURAL LAND CLASSIFICATIONStatement6 Jun 2025View
HORTICULTURAL VIABILITY ASSESSMENTStatement6 Jun 2025View
Drainage technical note response 13 November 2025Substitute Document1 Dec 2025View
Certificate BSubstitute Document1 Dec 2025View
Preliminary Ecological Appraisal and Ecological Maintenance Proposals 12 November 2025Substitute Document1 Dec 2025View
Tree Survey report September 2025Additional Docs1 Dec 2025View
Drainage Engineers responseConsultation15 Jan 2026View
West Sussex Highways responseConsultation22 Dec 2025View
West Sussex Lead Local Flood authority responseConsultation17 Dec 2025View
Environmental Health responseConsultation8 Dec 2025View
Ecologist commentsConsultation8 Dec 2025View
Engineers Comments Regarding Surface Water DrainageConsultation11 Sept 2025View
WSCC LLFA Surface Water Drainage responseConsultation8 Jul 2025View
WSCC Highways responseConsultation7 Jul 2025View
Ecology responseConsultation3 Jul 2025View
Environmental Health Consultation ResponseConsultation30 Jun 2025View
South Downs National ParkConsultation23 Jun 2025View
Walberton Parish CouncilRep Letters7 Jan 2026View
Rep LettersRep Letters15 Dec 2025View
Rep LettersRep Letters21 Jul 2025View
Rep LettersRep Letters27 Jun 2025View
confirmation of S.106 agreement having been completedPlanning Correspondence18 Feb 2026View
Agreement to EoTPlanning Correspondence28 Jan 2026View
Agreement to pre-commencement conditionsPlanning Correspondence20 Jan 2026View
Planning correspondence relating to amended documents 18.11.25Planning Correspondence1 Dec 2025View
Agreement to EoTPlanning Correspondence5 Sept 2025View
Extension of timePlanning Correspondence12 Aug 2025View
SDNP AcknowledgementPlanning Correspondence23 Jun 2025View
Systems CorrespondenceSystems Correspondence18 Jun 2025View
Systems CorrespondenceSystems Correspondence9 Jun 2025View
Systems CorrespondenceSystems Correspondence6 Jun 2025View
LOCATION PLAN EXISTING DRAWING 5Superseded Document18 Jun 2025View
DRAINAGE TECHNICAL NOTESuperseded Document6 Jun 2025View
LOCATION AND BLOCK PLAN 1Superseded Document6 Jun 2025View
PRELININARY ECOLOGICAL APPRAISALSuperseded Document6 Jun 2025View
PROPOSED SITE PLAN 2BSuperseded Document6 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

App Cond with S106
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.