Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Littlehampton Swimming & Sports Centre Sea Road Littlehampton BN16 2NA
Last published check: 15 Oct 2026, 21:06. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceApplication for non-material amendment following a grant of planning permission LU/314/16/PL relating to re-orientation of the building to the East, amendments to internal layout at ground & first floor levels. Removal of mezzanine floor level with the plant being distributed throughout the remaining building envelope. Reduction in overall width of the building by 1m. Reduction in overall floorspace and loss of one no. toilet. Reduction in maximum building height. Reduction in width of main swimming pool. Amendments to proposed car parking arrangement & amendments to energy strategy.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLittlehampton Swimming & Sports Centre Sea Road Littlehampton BN16 2NA
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| DecisionDecision | 29 Mar 2017 | View |
| Covering Letter - ApplicationApplication | 16 Feb 2017 | View |
| Subsitute 07/03/17 Ground Floor GA Plan dwg. 3519 (08)014 Rev DPlans | 8 Mar 2017 | View |
| Substitute 07/03/17 First Floor GA plan dwg. 3519 (08)015 Rev DPlans | 8 Mar 2017 | View |
| Elevations plans dwg. 3519 (08)018 Rev APlans | 8 Mar 2017 | View |
| Subsitute Location plan dwg. 3519 (08)011 Rev CPlans | 8 Mar 2017 | View |
| Substitute GA Site Plan dwg. 3519 (08)013 Rev EPlans | 8 Mar 2017 | View |
| Phase 1 Construction Logistics - Enabling Works 01 Rev BPlans | 17 Feb 2017 | View |
| Phase 2 - Construction Logistics Main Works plan dwg. 02 BPlans | 17 Feb 2017 | View |
| Phase 3 Construction Logistics - Demolition of swimming pool & Reinstatement of grounds plan dwg. 03 Rev BPlans | 17 Feb 2017 | View |
| Section 73 Landscape Masterplan dwg. 5312_PL_101_REVEPlans | 16 Feb 2017 | View |
| Undercroft GA Plan dwg. 3519 (08)016 Rev APlans | 16 Feb 2017 | View |
| GA Roof plan dwg. 3519 (08)017 Rev BPlans | 16 Feb 2017 | View |
| Superseded 07/03/17 First Floor GA Plan dwg. 3519 (08)015 Rev CPlans | 16 Feb 2017 | View |
| Superseded 07/03/17 GA Site Plan dwg. 3519 (08)013 Rev DPlans | 16 Feb 2017 | View |
| Existing Site Plan dwg. 3519 (08)012 Rev BPlans | 16 Feb 2017 | View |
| Superseded 07/03/17 Ground Floor GA Plan dwg. 3519 (08)014 Rev CPlans | 16 Feb 2017 | View |
| Sections AA & BB Elevations plans dwg. 3519 (08)020 Rev APlans | 16 Feb 2017 | View |
| Sections YY & ZZ Elevations plans dwg. 3519 (08)022 Rev APlans | 16 Feb 2017 | View |
| Elevations Overlaid With Dome and Existing Leisure Centre plan dwg. 3519 (08)019 Rev APlans | 16 Feb 2017 | View |
| Visual 3D Approach from Mewsbrooke Park plan dwg. 3519 (08)024 Rev APlans | 16 Feb 2017 | View |
| Superseded 07/03/17 Location plan dwg. 3519 (08)011 Rev BPlans | 16 Feb 2017 | View |
| Sections CC & DD Elevations plans dwg. 3519 (08)021 Rev APlans | 16 Feb 2017 | View |
| Visual 3D plans dwg. 3519 (08)025 Rev APlans | 16 Feb 2017 | View |
| Landscape Strategy Statement (Feb 2017)Statement | 17 Feb 2017 | View |
| Document Issue Sheet ( 13 Feb 2017) 3519 (08) SeriesStatement | 17 Feb 2017 | View |
| Design & Access Statement (Oct 2016) Rev AStatement | 16 Feb 2017 | View |
| External Lighting & CCTV Concept plan dwg. 1860-EL-S-100 P3Statement | 16 Feb 2017 | View |
| Planning Statement (Feb 2017)Statement | 16 Feb 2017 | View |
| Transport Statement Addendum (Feb 2017) Ref: A099568Statement | 16 Feb 2017 | View |
| Ecology Consultancy - Arboricultural Impact Assessment & Method Statement (Feb 2017) Ref: 5113.8 Ver 4.0Statement | 16 Feb 2017 | View |
| Construction Management Plan (Feb 2017)Statement | 16 Feb 2017 | View |
| Ecology Consultancy - Landscape Strategy (Feb 2017) Ref 5113.6 V2Statement | 16 Feb 2017 | View |
| Engery Strategy (Feb 2017) Rev 05Statement | 16 Feb 2017 | View |
| ConsultationConsultation | 21 Mar 2017 | View |
| Environmental HealthConsultation | 15 Mar 2017 | View |
| GreenspaceConsultation | 15 Mar 2017 | View |
| inetleteRep Letters | 15 Mar 2017 | View |
| Emailed 07/03/17Planning Correspondence | 8 Mar 2017 | View |
| PACKSystems Correspondence | 20 Feb 2017 | View |
| PMAC71PSystems Correspondence | 16 Feb 2017 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.