Council planning record

Approval of details reserved by condition under F/4/20/OUT relating to conditions 28- Proposed foul drainage system, 29- Proposed surface water drainage scheme, 30- Discharges to watercourses and 31-Maintenance & management of surface water drainage system.

Land at Ford Airfield Ford

UndecidedReference: F/22/26/DOCArun District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Undecided
Application type
Not published
Received
12 Mar 2026
Validated
23 Mar 2026
Determination deadline
18 May 2026
Local authority
Arun District Council

Application overview

Approval of details reserved by condition under F/4/20/OUT relating to conditions 28- Proposed foul drainage system, 29- Proposed surface water drainage scheme, 30- Discharges to watercourses and 31-Maintenance & management of surface water drainage system.

Proposal details

Reference
F/22/26/DOC
Parish
Ford
Agent
Tor & Co Everdene House Deansleigh Rd Bournemouth BH7 7DU

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Ford Airfield Ford

This record has no verified map location.

Documents 281 of 281

DocumentPublishedAction
Covering letter. 09.03.2026Application19 Mar 2026View
Application Form - Without Personal DataApplication13 Mar 2026View
Enabling infrastructure general arrangement Drg no. 2205771-D100 Rev P15Plans13 Mar 2026View
Infiltration Constraints (RM1 and Northern IRM) Drg No. 2205773-1955 Rev A.Plans13 Mar 2026View
IRM - Drainage Strategy (Sheet 1). Drg no. 2205771-130 Rev DPlans13 Mar 2026View
IRM - Drainage Strategy (Sheet 2). Drg no. 2205771-131 Rev FPlans13 Mar 2026View
IRM - Drainage Strategy (Sheet 3). Drg no. 2205771-132 Rev EPlans13 Mar 2026View
IRM - Drainage Strategy (Sheet 4). Drg no. 2205771-133 Rev EPlans13 Mar 2026View
IRM - Drainage Strategy (Sheet 5). Drg no. 2205771-134 Rev DPlans13 Mar 2026View
IRM - Drainage Strategy (Sheet 6). Drg no. 2205771-135 Rev DPlans13 Mar 2026View
IRM - Drainage Strategy (Sheet 7). Drg no. 2205771-136 Rev DPlans13 Mar 2026View
Pre-development drainage catchments plan. Drg no. 2205771-250.Plans13 Mar 2026View
Infiltration constraints (RM1 and Northern IRM) Drg no. 2205773-1955 Rev A.Plans13 Mar 2026View
Yapton Road Roundabout Surface Water Drainage G.A. Drg no. 2205772-D1125 Rev C2.Plans13 Mar 2026View
Ford Lane Roundabout Surface Water Drainage G.A Drg no. 2205772-D1025 Rev C1.Plans13 Mar 2026View
Drainage Layout Overview Drg no. 2205773-SK03 Rev P3Plans13 Mar 2026View
IRM - Site Sections (Sheet 1) Drg no. 2205771-D170 Rev DPlans13 Mar 2026View
Highway longsections - Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1281 Rev P6Plans13 Mar 2026View
Highway longsections - Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1282 Rev P6Plans13 Mar 2026View
Highway cross- sections Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1285 Rev P5Plans13 Mar 2026View
Highway cross- sections Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1286 Rev P5Plans13 Mar 2026View
Composite landscape masterplan RM1, RM4 and RM Infrastructure. Drg no. TOR-RMIN-XX-DR-L-P-013 Rev HPlans13 Mar 2026View
Topographical and PAS 128:2022 Utility Survey. August 2023 Rev 1. Sheet 1-4Plans13 Mar 2026View
Topographical and PAS 128:2022 Utility Survey. August 2003 Rev 1. Sheets 5-7Plans13 Mar 2026View
Topographical and PAS 128:2022 Utility Survey. August 2023 Rev 1. Sheets 8-10Plans13 Mar 2026View
Topographical and PAS 128:2022 Utility Survey. August 2023 Sheets 1-8Plans13 Mar 2026View
Topographical and PAS 128:2022 Utility Survey. August 2023 Sheets 9-16Plans13 Mar 2026View
Topographical and PAS 128:2022 Utility Survey. August 2023 Sheet 17-18Plans13 Mar 2026View
Air Valve and Washout Chamber. Drg no. 2205773-ACE-000-00-DR-C-1235Substitute Plan1 Jul 2026View
2205773-ACE-000-00-DR-C-1329 - Enkadrain Construction DetailsSubstitute Plan1 Jul 2026View
Pump station general arrangement Pump Station 1. Drg no. 2205773-ACE-XX-XX-DR-C-1231Substitute Plan1 Jul 2026View
Pump station general arrangement Pump Station 2. Drg no. 2205773-ACE-XX-XX-DR-C-1232Substitute Plan1 Jul 2026View
Pump station general arrangement Pump Station 3. Drg no. 2205773-ACE-XX-XX-DR-C-1233Substitute Plan1 Jul 2026View
Pump station general arrangement Pump Station 4. Drg no. 2205773-ACE-XX-XX-DR-C-1234Substitute Plan1 Jul 2026View
Section 104 Rising main 1 long section. Drg no. 2205773-ACE-000-00-DR-C-1241Substitute Plan1 Jul 2026View
Section 104 Rising main 2 long section - Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1242Substitute Plan1 Jul 2026View
Section 104 Rising main 2 long section - Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1243Substitute Plan1 Jul 2026View
Section 104 Rising main 3 long section - Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1244Substitute Plan1 Jul 2026View
Section 104 Rising main 3 long section - Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1245Substitute Plan1 Jul 2026View
Construction Details Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1401Substitute Plan1 Jul 2026View
Section 104 Rising main 4 long section Drg no. 2205773-ACE-000-00-DR-C-1247Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1821Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 10. Drg no. 2205773-ACE-000-00-DR-C-1830Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 11. Drg no. 2205773-ACE-000-00-DR-C-1831Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 12. Drg no. 2205773-ACE-000-00-DR-C-1832Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 13. Drg no. 2205773-ACE-000-00-DR-C-1833Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1822Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1823Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 4. Drg no. 2205773-ACE-000-00-DR-C-1824Substitute Plan1 Jul 2026View
Construction details Sheet 5 Drg No. 2205773-ACE-000-00-DR-C-1405Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 5. Drg no. 2205773-ACE-000-00-DR-C-1825Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 6. Drg no. 2205773-ACE-000-00-DR-C-1826Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 7. Drg no. 2205773-ACE-000-00-DR-C-1827Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 8. Drg no. 2205773-ACE-000-00-DR-C-1828Substitute Plan1 Jul 2026View
Surface Finishes and Kerbing Plan Sheet 9. Drg no. 2205773-ACE-000-00-DR-C-1829Substitute Plan1 Jul 2026View
Surface Water Drainage Longsections Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1295Substitute Plan1 Jul 2026View
Surface Water Drainage Longsections Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1296Substitute Plan1 Jul 2026View
Surface Water Drainage Longsections Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1297Substitute Plan1 Jul 2026View
Surface Water Drainage Longsections Sheet 4. Drg no. 2205773-ACE-000-00-DR-C-1298Substitute Plan1 Jul 2026View
Surface water drainage schedule Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1290Substitute Plan1 Jul 2026View
Construction Details Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1402Substitute Plan1 Jul 2026View
Surface water drainage schedule Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1291Substitute Plan1 Jul 2026View
Construction Details Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1403Substitute Plan1 Jul 2026View
Construction Details Sheet 4. Drg no. 2205773-ACE-000-00-DR-C-1404Substitute Plan1 Jul 2026View
Foul Drainage Longsections Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1295Substitute Plan1 Jul 2026View
Foul Drainage Longsections Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1296Substitute Plan1 Jul 2026View
Foul drainage schedule. Drg no. 2205773-ACE-000-00-DR-C-1290Substitute Plan1 Jul 2026View
Drainage Layout Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1202 C3Substitute Plan24 Jun 2026View
Drainage Layout Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1203 C3Substitute Plan24 Jun 2026View
Drainage layout Sheet 5. Drg no. 2205773-ACE-000-00-DR-C-1205 C3Substitute Plan24 Jun 2026View
Drainage layout Sheet 6. Drg no. 2205773-ACE-000-00-DR-C-1206 C3Substitute Plan24 Jun 2026View
Drainage layout sheet 8. Drg no. 2205773-ACE-000-00-DR-C-1208 C3Substitute Plan24 Jun 2026View
Drainage layout sheet 9. Drg no. 2205773-ACE-000-00-DR-C-1209 C3Substitute Plan24 Jun 2026View
Drainage layout Sheet 10. Drg no. 2205773-ACE-000-00-DR-C-1210 C3Substitute Plan24 Jun 2026View
Drainage Layout Sheet 11. Drg no. 2205773-ACE-000-00-DR-C-1211 C3Substitute Plan24 Jun 2026View
Drainage Layout Sheet 12. Drg no. 2205773-ACE-000-00-DR-C-1212 C3Substitute Plan24 Jun 2026View
Southern Water Sewer Requisition letter 22.01.2025Statement20 Mar 2026View
Technical approval for S278/38 highway design PSI/3757_01 at Ford Lane Roundabout, Ford. 05.03.2025Statement20 Mar 2026View
Technical approval for S278/38 highway design PSI/3757_02 at Yapton Road Roundabout, Ford. 15.11.2024Statement20 Mar 2026View
Soakaway Testing 17.02.2026Statement20 Mar 2026View
Drainage response- soakage calculation.Statement20 Mar 2026View
Sustainable Drainage Scheme (SuDS) Desktop Safety Review. Version: Final. 14 January 2026Statement20 Mar 2026View
SuDS Management & Maintenance Plan. Report Ref 2205771. February 2026Statement20 Mar 2026View
Geo-environmental and geotechnical site assessment. November 2018. Part 1Statement19 Mar 2026View
Geo-environmental and geotechnical site assessment. November 2018. Part 2Statement19 Mar 2026View
Geo-environmental and geotechnical site assessment. November 2018. Part 3Statement19 Mar 2026View
Infiltration Testing. April 2020. Part 1.Statement19 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 1Statement19 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 2.Statement19 Mar 2026View
Infiltration Factual Report- Soakage Testing. December 2024. Part 1Statement19 Mar 2026View
Discharge of Condition 28-31- Infrastructure and Enabling Works. Report ref 2205773-R03. March 2026Statement19 Mar 2026View
Appendix A1- Uplift Calculations. 26.02.2026Statement19 Mar 2026View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report. Report Ref. 2205771-R16-F. March 2026.Statement18 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 1Statement18 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 11.Statement18 Mar 2026View
CCTV Survey Report. 04.10.2024Statement18 Mar 2026View
Ardent Consulting Engineers response to WSCC pre-app comments. Letter dated 22.08.2024Statement18 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 2.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 4.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 5.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 6.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 7.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 8.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 9.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 10.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy. Ref. C85228 / R001E Dated 14.02.2020. Part 12.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 13.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- ADC Drainage Department Outline Planning Comments on Surface Water Drainage Strategy. Part 14.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 15.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 16.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 17.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 18.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 19.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 20.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 21.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 22.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 23.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 24.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 25.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 27.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 29.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 31.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 30.Statement13 Mar 2026View
Flood Risk Assessment and Drainage Strategy Technical Note- Updated Drainage Strategy. Dated 10.02.2021. Part 32.Statement13 Mar 2026View
Surface Water Discharge PointsStatement13 Mar 2026View
Designers Response to Engineering Comments 28.02.2025Statement13 Mar 2026View
Infiltration Testing. April 2020. Part 2.Statement13 Mar 2026View
Infiltration Testing. April 2020. Part 3.Statement13 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 3.Statement13 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 4.Statement13 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 5.Statement13 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 6.Statement13 Mar 2026View
Winter Groundwater Monitoring. May 2024. Part 7.Statement13 Mar 2026View
Infiltration Factual Report- Soakage Testing. December 2024. Part 2.Statement13 Mar 2026View
Greenfield runoff rate estimation for sites.Statement13 Mar 2026View
North Net Calcs 24.07.2025Statement13 Mar 2026View
South Net 1 Calcs 2Statement13 Mar 2026View
South Net 2 Calcs 2Statement13 Mar 2026View
Designers response to engineers comments. 30.07.2025Statement13 Mar 2026View
Designers Response to Engineering Comments. 30.10.2026Statement13 Mar 2026View
DETERMINATION OF SOIL INFILTRATION RATE IN ACCORDANCE WITH BRE DIGEST 365Statement13 Mar 2026View
Design CodeStatement13 Mar 2026View
SuDS Management & Maintenance Plan. Ref 2205771. May 2026Substitute Document1 Jul 2026View
Northern Network - 1, 30, 30+cc, 100+ccSubstitute Document24 Jun 2026View
Southern Network 1 - 1, 30, 30+cc, 100+ccSubstitute Document24 Jun 2026View
Southern Network 2 - 1, 30, 30+cc, 100+ccSubstitute Document24 Jun 2026View
Foul Drainage Longsections Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1297Additional Docs1 Jul 2026View
Foul Drainage Longsections Sheet 4. Drg no. 2205773-ACE-000-00-DR-C-1298Additional Docs1 Jul 2026View
Foul Drainage Longsections Sheet 5. Drg no. 2205773-ACE-000-00-DR-C-1299Additional Docs1 Jul 2026View
Foul Drainage Longsections Sheet 6. Drg no. 2205773-ACE-000-00-DR-C-1294Additional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1321 - Enkadrain Details - Sheet 1Additional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1322 - Enkadrain Details - Sheet 2Additional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1323 - Enkadrain Details - Sheet 3Additional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1324 - Enkadrain Details - Sheet 4Additional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1328 - Enkadrain Manhole ScheduleAdditional Docs1 Jul 2026View
Pump station general arrangement Pump Station 5. Drg no. 2205773-ACE-XX-XX-DR-C-1235Additional Docs1 Jul 2026View
Section 104 Rising main long section Drg no. 2205773-ACE-000-00-DR-C-1248Additional Docs1 Jul 2026View
Surface Water Drainage Longsections Sheet 5. Drg no. 2205773-ACE-000-00-DR-C-1299Additional Docs1 Jul 2026View
Surface Water Drainage Longsections Sheet 6. Drg no. 2205773-ACE-000-00-DR-C-1294Additional Docs1 Jul 2026View
Surface water drainage schedule Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1292Additional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2107 - Pond Setting Out Plans - Sheet 7.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2101 - - Pond Setting Out Plans - Sheet 1.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2102 - - Pond Setting Out Plans - Sheet 2.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2103 - - Pond Setting Out Plans - Sheet 3.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2104 - - Pond Setting Out Plans - Sheet 4.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2105 - - Pond Setting Out Plans - Sheet 5.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-2106 - - Pond Setting Out Plans - Sheet 6.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1951 - - Basin Setions - Sheet 1.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1952 - - Basin Setions - Sheet 2.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1223 - S104 Impermeable areas Plan - Sheet 1.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1224 - S104 Impermeable areas Plan - Sheet 2.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1251 - Headwall Construction Details - Sheet 1.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1252 - Headwall Construction Details - Sheet 2.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1253 - - Headwall Construction Details - Sheet 3.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1254 - - Headwall Construction Details - Sheet 4.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1255 - - Headwall Construction Details - Sheet 5.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1256 - - Headwall Construction Details - Sheet 6.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1257 - - Headwall Construction Details - Sheet 7.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1258 - - Headwall Construction Details - Sheet 8.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1259 - - Headwall Construction Details - Sheet 9.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1260 - - Headwall Construction Details - Sheet 10.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1261 - - Headwall Construction Details - Sheet 11.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1262 - - Headwall Construction Details - Sheet 12.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1263 - - Headwall Construction Details - Sheet 13.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1264 - - Headwall Construction Details - Sheet 14.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1266 - - Headwall Construction Details - Sheet 16.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1267 - - Headwall Construction Details - Sheet 17.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1268 - - Headwall Construction Details - Sheet 18.pdfAdditional Docs1 Jul 2026View
2205773-ACE-000-00-DR-C-1269 - - Headwall Construction Details - Sheet 19.pdfAdditional Docs1 Jul 2026View
2205772-D1125 Yapton Road Roundabout Surface water Drainage General ArrangementAdditional Docs1 Jul 2026View
2205771_B - Ford Airfield Maintenance & Management PlanAdditional Docs24 Jun 2026View
2205772-D1000 Ford Lane Roundabout General Arrangement C1Additional Docs24 Jun 2026View
2205772-D1025 Ford Lane Roundabout Surface Water Drainage General Arrangement C1Additional Docs24 Jun 2026View
2205772-D1026 Ford Lane Roundabout Gully Catchment Plan C1Additional Docs24 Jun 2026View
2205772-D1030 Ford Lane Roundabout Contours and Alignments C1Additional Docs24 Jun 2026View
2205772-D1060 Ford Lane Roundabout Setting Out Plan C1Additional Docs24 Jun 2026View
2205772-D1070 Ford Lane Roundabout Construction Details - Sheet 1 C1Additional Docs24 Jun 2026View
2205772-D1071 Ford Lane Roundabout Construction Details - Sheet 2 C1Additional Docs24 Jun 2026View
2205772-D1072 Ford Lane Roundabout Construction Details - Sheet 3 C1Additional Docs24 Jun 2026View
2205772-D1100 Yapton Road Roundabout General Arrangement C1Additional Docs24 Jun 2026View
2205772-D1126 Yapton Road Roundabout Gully Catchment Plan C2Additional Docs24 Jun 2026View
2205772-D1130 Yapton Road Roundabout Contours and Alignments C1Additional Docs24 Jun 2026View
2205772-D1131 Yapton Road Roundabout Long Sections C1Additional Docs24 Jun 2026View
2205772-D1160 Yapton Road Roundabout Setting Out Plan C1Additional Docs24 Jun 2026View
2205772-D1170 Yapton Road Roundabout Construction Details - Sheet 1 C1Additional Docs24 Jun 2026View
2205772-D1171 Yapton Road Roundabout Construction Details - Sheet 2 C1Additional Docs24 Jun 2026View
2205773-ACE-000-00-DR-C-1201-Rev C3-Drainage Layout-Sheet 1Additional Docs24 Jun 2026View
2205773-ACE-000-00-DR-C-1204-Rev C3-Drainage Layout-Sheet 4Additional Docs24 Jun 2026View
2205773-ACE-000-00-DR-C-1207-Rev C3-Drainage Layout-Sheet 7Additional Docs24 Jun 2026View
2205773-ACE-000-00-DR-C-1221-Rev C2-S104 Layout-Sheet 1Additional Docs24 Jun 2026View
2205773-ACE-000-00-DR-C-1222-Rev C2-S104 Layout-Sheet 1Additional Docs24 Jun 2026View
2205773-R07 Ford Airfield Arun - Drainage Addendum. Discharge of condition 28-31- Infrastructure and enabling works addendum. May 2026Additional Docs24 Jun 2026View
2205773-R08 Ford Airfield Arun - Comment Tracker. May 2026Additional Docs24 Jun 2026View
7394_149_INF - Tree Pit DetailsAdditional Docs24 Jun 2026View
7394_162_INF- Landings Green Tree Pit Location PlanAdditional Docs24 Jun 2026View
7394_163_INF- St Marys Meadow and Arun Way Tree Pit Location PlanAdditional Docs24 Jun 2026View
7394_164_INF- Ryebank Park Tree Pit Location PlanAdditional Docs24 Jun 2026View
7394_165_INF- Primary Street Tree Pit Location PlanAdditional Docs24 Jun 2026View
Excerpt of Land Transfer AgreementAdditional Docs24 Jun 2026View
LLFA Response Letter to application ref. F 15 24 RES 09.05.25Additional Docs24 Jun 2026View
Northern Network IR ONLY - 1, 30, 30+cc, 100+ccAdditional Docs24 Jun 2026View
Southern Network 1 IR ONLY - 1, 30, 30+cc, 100+ccAdditional Docs24 Jun 2026View
Engineers responseConsultation16 Sept 2026View
Southern Water responseConsultation10 Jun 2026View
Engineers responseConsultation15 Apr 2026View
Email with additional drawings 23.03.2026Planning Correspondence24 Mar 2026View
Systems CorrespondenceSystems Correspondence26 Mar 2026View
Systems CorrespondenceSystems Correspondence23 Mar 2026View
Systems CorrespondenceSystems Correspondence13 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1823 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 4. Drg no. 2205773-ACE-000-00-DR-C-1824 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 5. Drg no. 2205773-ACE-000-00-DR-C-1825 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 6. Drg no. 2205773-ACE-000-00-DR-C-1826 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 7. Drg no. 2205773-ACE-000-00-DR-C-1827 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 8. Drg no. 2205773-ACE-000-00-DR-C-1828 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 9. Drg no. 2205773-ACE-000-00-DR-C-1829 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 10. Drg no. 2205773-ACE-000-00-DR-C-1830 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 11. Drg no. 2205773-ACE-000-00-DR-C-1831 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 12. Drg no. 2205773-ACE-000-00-DR-C-1832 Rev P5Superseded Document24 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 13. Drg no. 2205773-ACE-000-00-DR-C-1833 Rev P1Superseded Document24 Mar 2026View
Surface Water Drainage Longsections Sheet 4. Drg no. 2205773-ACE-000-00-DR-C-1294 Rev P3Superseded Document24 Mar 2026View
Foul Drainage Longsections Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1295 Rev P5Superseded Document24 Mar 2026View
Foul Drainage Longsections Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1296 Rev P6Superseded Document24 Mar 2026View
Surface Water Drainage Longsections Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1297 Rev P5Superseded Document24 Mar 2026View
Surface Water Drainage Longsections Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1298 Rev P5Superseded Document24 Mar 2026View
Surface Water Drainage Longsections Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1299 Rev P6Superseded Document24 Mar 2026View
SuDS Management & Maintenance Plan. Ref 2205771. August 2024Superseded Document19 Mar 2026View
Drainage Layout Sheet 11. Drg no. 2205773-ACE-000-00-DR-C-1211 Rev P6Superseded Document13 Mar 2026View
Drainage Layout Sheet 12. Drg no. 2205773-ACE-000-00-DR-C-1212 Rev P7Superseded Document13 Mar 2026View
Construction Details Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1401 Rev P3Superseded Document13 Mar 2026View
Construction Details Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1402 Rev P2Superseded Document13 Mar 2026View
Construction Details Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1403 Rev P4Superseded Document13 Mar 2026View
Construction Details Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1404 Rev P1Superseded Document13 Mar 2026View
Construction details Sheet 2 Drg No. 2205773-ACE-000-00-DR-C-1405 Rev P1Superseded Document13 Mar 2026View
Pozidrain Construction Details Drg No. 2205773-ACE-000-00-DR-C-1329 Rev C3Superseded Document13 Mar 2026View
Northern V2 - IRM Update. 24.07.2025Superseded Document13 Mar 2026View
Southern V5- IRM Update. 24.07.2025Superseded Document13 Mar 2026View
Southern V5- IRM Update. 24.07.2025Superseded Document13 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1821 Rev P6Superseded Document13 Mar 2026View
Surface Finishes and Kerbing Plan Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1822 Rev P5Superseded Document13 Mar 2026View
Drainage Layout Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1202 Rev P7Superseded Document13 Mar 2026View
Drainage Layout Sheet 3. Drg no. 2205773-ACE-000-00-DR-C-1203 Rev P7Superseded Document13 Mar 2026View
Section 104 Rising main 3 long section - Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1244 Rev P6Superseded Document13 Mar 2026View
Section 104 Rising main 3 long section - Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1245 Rev P6Superseded Document13 Mar 2026View
Section 104 Rising main 4 long section Drg no. 2205773-ACE-000-00-DR-C-1247 Rev P5Superseded Document13 Mar 2026View
Foul drainage schedule. Drg no. 2205773-ACE-000-00-DR-C-1290 Rev P6Superseded Document13 Mar 2026View
Surface water drainage schedule Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1291 Rev P5Superseded Document13 Mar 2026View
Drainage layout Sheet 5. Drg no. 2205773-ACE-000-00-DR-C-1205 Rev P6Superseded Document13 Mar 2026View
Surface water drainage schedule Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1292 Rev P6Superseded Document13 Mar 2026View
Section 104 Rising main 1 long section. Drg no. 2205773-ACE-000-00-DR-C-1241 Rev P5Superseded Document13 Mar 2026View
Section 104 Rising main 2 long section - Sheet 1. Drg no. 2205773-ACE-000-00-DR-C-1242 Rev P6Superseded Document13 Mar 2026View
Section 104 Rising main 2 long section - Sheet 2. Drg no. 2205773-ACE-000-00-DR-C-1243 Rev P5Superseded Document13 Mar 2026View
Pump station general arrangement Pump Station 1. Drg no. 2205773-ACE-XX-XX-DR-C-1231 Rev P5Superseded Document13 Mar 2026View
Pump station general arrangement Pump Station 2. Drg no. 2205773-ACE-XX-XX-DR-C-1232 Rev P6Superseded Document13 Mar 2026View
Pump station general arrangement Pump Station 3. Drg no. 2205773-ACE-XX-XX-DR-C-1233 Rev P6Superseded Document13 Mar 2026View
Pump station general arrangement Pump Station 4. Drg no. 2205773-ACE-XX-XX-DR-C-1234 Rev P6Superseded Document13 Mar 2026View
Air valve and washout chamber general arrangement. Drg no. 2205773-ACE-XX-XX-DR-C-1235 Rev P3Superseded Document13 Mar 2026View
Drainage layout Sheet 6. Drg no. 2205773-ACE-000-00-DR-C-1206 Rev P8Superseded Document13 Mar 2026View
Drainage layout sheet 8. Drg no. 2205773-ACE-000-00-DR-C-1208 Rev P6Superseded Document13 Mar 2026View
Drainage layout sheet 9. Drg no. 2205773-ACE-000-00-DR-C-1209 Rev P7Superseded Document13 Mar 2026View
Drainage layout Sheet 10. Drg no. 2205773-ACE-000-00-DR-C-1210 Rev P7Superseded Document13 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.