Council planning record

Approval of reserved matters (layout, scale, appearance and landscaping) following outline consent F/4/20/OUT for the infrastructure reserved matters including the provision of a primary spine road and associated secondary road junctions, pavement, footpaths, cycle infrastructure and bus stops; site wide drainage infrastructure including foul pumping stations, foul sewer infrastructure, SUDS basins, SUDS swales, surface water infrastructure; acoustic fencing; public open space including landscape details, play areas, footpaths & associated works. This application affects a Public Right of Way, may affect the setting of a Listed Building and falls within CIL Zone 1 (Ford strategic site - zero rated).

Land at Ford Airfield Ford

ApproveConditionallyReference: F/14/24/RESArun District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
ApproveConditionally
Application type
Not published
Received
11 Sept 2024
Validated
11 Sept 2024
Determination deadline
11 Feb 2026
Local authority
Arun District Council

Application overview

Approval of reserved matters (layout, scale, appearance and landscaping) following outline consent F/4/20/OUT for the infrastructure reserved matters including the provision of a primary spine road and associated secondary road junctions, pavement, footpaths, cycle infrastructure and bus stops; site wide drainage infrastructure including foul pumping stations, foul sewer infrastructure, SUDS basins, SUDS swales, surface water infrastructure; acoustic fencing; public open space including landscape details, play areas, footpaths & associated works. This application affects a Public Right of Way, may affect the setting of a Listed Building and falls within CIL Zone 1 (Ford strategic site - zero rated).

Proposal details

Reference
F/14/24/RES
Parish
Ford
Agent
tor&co 23 Heddon Street London W1B 4BQ

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Ford Airfield Ford

This record has no verified map location.

Documents 493 of 493

DocumentPublishedAction
DecisionDecision11 Feb 2026View
Scheme of delegation formDecision9 Feb 2026View
Scheme of delegation formDecision9 Feb 2026View
Officers ReportOfficers Report11 Feb 2026View
Covering letterApplication11 Sept 2024View
CIL form 1Application11 Sept 2024View
Application formApplication11 Sept 2024View
Horizontal illuminance (lux)Plans11 Sept 2024View
Indicative pump station general arrangement plan 2400820-D122Plans11 Sept 2024View
Reserved Matters Infrastructure Landing Green Sheet 1 of 2 TOR-RMIN_XX_DR_L_P-001 Rev HSubstitute Plan3 Feb 2026View
Reserved Matters Infrastructure Landing Green Sheet 2 of 2 TOR-RMIN_XX_DR_L_P-002 Rev HSubstitute Plan3 Feb 2026View
Reserved Matters Infrastructure Ryebank Park Sheet 1 of 2 TOR-RMIN_XX_DR_L_P-008 Rev HSubstitute Plan3 Feb 2026View
Reserved Matters Infrastructure Ryebank Park Sheet 2 of 2 TOR-RMIN_XX_DR_L_P-009 Rev HSubstitute Plan3 Feb 2026View
Composite Landscape Masterplan, RM1, RM4 and RM Infrastructure TOR-RMIN_XX_DR_L_P-013 Rev HSubstitute Plan3 Feb 2026View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part2Substitute Plan1 Dec 2025View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part3Substitute Plan1 Dec 2025View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part4Substitute Plan1 Dec 2025View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part5Substitute Plan1 Dec 2025View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part6.Substitute Plan1 Dec 2025View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part7Substitute Plan1 Dec 2025View
2205771-012F- IRM-Vehicle Tracking and Visibility Plan (Sheet 3)Substitute Plan1 Dec 2025View
2205771-131G IRM Drainage Strategy (Sheet 2)Substitute Plan1 Dec 2025View
2205771-134G IRM Drainage Strategy (Sheet 5)Substitute Plan1 Dec 2025View
2205771-136E IRM Drainage Strategy (Sheet 7)Substitute Plan1 Dec 2025View
2205771-151F IRM Levels Strategy (Sheet 2)Substitute Plan1 Dec 2025View
2205771-154E IRM Levels Strategy (Sheet 5)Substitute Plan1 Dec 2025View
2205771-156E IRM Levels Strategy (Sheet 7)Substitute Plan1 Dec 2025View
2205771-170D IRM Site Sections (Sheet 1)Substitute Plan1 Dec 2025View
2205771-D100_P16 Enabling Infrastructure GASubstitute Plan1 Dec 2025View
RAISED PLATFORM-TYPICAL DETAILSubstitute Plan1 Dec 2025View
RMIN-XX-DR-L-P-005-G-Reserved Matters Infrastructure - Primary Street North 2Substitute Plan1 Dec 2025View
RMIN-XX-DR-L-P-006-G-Reserved Matters Infrastructure - Primary Street CentralSubstitute Plan1 Dec 2025View
RMIN-XX-DR-L-P-010-F-Reserved Matters Infrastructure - Planting SchedulesSubstitute Plan1 Dec 2025View
RMIN-XX-DR-L-P-014-D-Play Provision Landings GreenSubstitute Plan1 Dec 2025View
RMIN-XX-DR-L-P-022-D-Ryebank Park - Section 2of2Substitute Plan1 Dec 2025View
RMIN-XX-DR-L-P-023-B-St Mary's Meadow Future ConnectionsSubstitute Plan1 Dec 2025View
Infrastructure RM- Levels Strategy (sheet 1) 2205771-D150 Rev.DSubstitute Plan13 Aug 2025View
Infrastructure RM- Levels Strategy (sheet 3) 2205771-D152 Rev.ESubstitute Plan13 Aug 2025View
Infrastructure RM- Levels Strategy (sheet 4) 2205771-D153 Rev.ESubstitute Plan13 Aug 2025View
Infrastructure RM- Levels Strategy (sheet 6) 2205771-D155 Rev.DSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure Arun Way TOR-RMIN_XX_DR_L_P-003 Rev.FSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure Primary Street North 1 of 2 TOR-RMIN_XX_DR_L_P-004 Rev.GSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure Primary Street (South) TOR-RMIN_XX_DR_L_P-007 Rev.FSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure Site Sections - Landings Green TOR-RMIN_XX_DR_L_P-011 Rev.DSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure Site Sections - Landings Green TOR-RMIN_XX_DR_L_P-012 Rev.DSubstitute Plan13 Aug 2025View
Play Provision Arun Way Reserved Matters Infrastructure TOR-RMIN_XX_DR_L_P-015 Rev.DSubstitute Plan13 Aug 2025View
Play Provision Ryebank Park Reserved Matters Infrastructure TOR-RMIN_XX_DR_L_P-016 Rev.CSubstitute Plan13 Aug 2025View
Play Provision St Mary's Meadow TOR-RMIN_XX_DR_L_P-017 Rev.BSubstitute Plan13 Aug 2025View
Play Provision Climping Edge Reserved Matters Infrastructure TOR-RMIN_XX_DR_L_P-018 Rev.BSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure St Mary's Meadow TOR-RMIN_XX_DR_L_P-019 Rev.CSubstitute Plan13 Aug 2025View
Reserved Matters Infrastructure Climping Edge TOR-RMIN_XX_DR_L_P-020 Rev.BSubstitute Plan13 Aug 2025View
Ryebank Park Basin Sections Ryebank Park 1 of 2 TOR-RMIN_XX_DR_L_P-021 Rev.CSubstitute Plan13 Aug 2025View
Tree Protection Plan 24053-22 IRMSubstitute Plan13 Aug 2025View
Infrastructure RM Impermeable Areas Plan (Sheet 1) 2205771-210 Rev. CSubstitute Plan12 Aug 2025View
Infrastructure RM Impermeable Areas Plan (Sheet 2) 2205771-211 Rev. CSubstitute Plan12 Aug 2025View
IRM Drainage Strategy (Sheet 1 of 7) 2205771-D130 Rev.DSubstitute Plan12 Aug 2025View
IRM Drainage Strategy (Sheet 3 of 7) 2205771-D132 Rev.ESubstitute Plan12 Aug 2025View
IRM Drainage Strategy (Sheet 4 of 7) 2205771-D133 Rev.ESubstitute Plan12 Aug 2025View
IRM Drainage Strategy (Sheet 6 of 7) 2205771-D135 Rev.DSubstitute Plan12 Aug 2025View
IRM-SITE SECTIONS (SHEET 2) 2205771-D171 REV ASubstitute Plan7 Jan 2025View
IRM-SITE SECTIONS (SHEET 3) 2205771-D172 REV ASubstitute Plan7 Jan 2025View
IRM LOCATION PLAN 2205771-D060 REV C DEC 2024Substitute Plan7 Jan 2025View
RoSPA SuDS Safety Report 1225 FinalStatement3 Feb 2026View
Bus stop designStatement11 Sept 2024View
Transport technical noteStatement11 Sept 2024View
Statement of community involvement IRM_06.AStatement11 Sept 2024View
Biodiversity net gain assessment IRM_07.AStatement11 Sept 2024View
20251119 - UES EPEP - Infrastructure RM - Land at Ford Airfield, Ford V10_Part1Substitute Document1 Dec 2025View
Arboricultural Impact Appraisal and Method Statement 24 July 2025 - 24053-AIA8-IRM-CASubstitute Document13 Aug 2025View
Planning Statement IRM_01.C January 2025Substitute Document28 Jan 2025View
Greenspace Officer Comments on Play ConditionAdditional Docs16 Dec 2025View
2205771 - RM Applications - Arun DC EHO Responses_17.11.25Additional Docs1 Dec 2025View
RMIN-XX-DR-L-P-028-Ryebank Park - Section A-AA.Additional Docs1 Dec 2025View
RMIN-XX-DR-L-P-029-Landings Green - Section B-BBAdditional Docs1 Dec 2025View
RMIN-XX-DR-L-P-030-Landings Green - Section C-CCAdditional Docs1 Dec 2025View
RMIN-XX-DR-L-P-105-STEP-DetailAdditional Docs1 Dec 2025View
STEPS-TYPICAL DETAILAdditional Docs1 Dec 2025View
Reserved Matters IRM Noise Assessment Report - Ref: 2205771-R40A Annex A (August 2025)Additional Docs20 Aug 2025View
Reserved Matters IRM Noise Assessment Report - Ref: 2205771-R40A Annex B (August 2025)Additional Docs20 Aug 2025View
Reserved Matters IRM Noise Assessment Report - Ref: 2205771-R40A Appendix A-E (August 2025)Additional Docs20 Aug 2025View
Reserved Matters IRM Noise Assessment Report - Ref: 2205771-R40A Appendix F-H (August 2025)Additional Docs20 Aug 2025View
Reserved Matters IRM Noise Assessment Report - Ref: 2205771-R40A Main Report (August 2025)Additional Docs20 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 1 of 7) 2205771-D010 Rev EAdditional Docs13 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 2 of 7) 2205771-D011 Rev FAdditional Docs13 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 4 of 7) 2205771-D013 Rev EAdditional Docs13 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 5 of 7) 2205771-D014 Rev FAdditional Docs13 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 6 of 7) 2205771-D015 Rev GAdditional Docs13 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 7 of 7) 2205771-D016 Rev FAdditional Docs13 Aug 2025View
IRM Stage 1 Road Safety Audit Designer's Response - 2205771-R27 July 2025Additional Docs13 Aug 2025View
IRM Transport Updated Letter v2 (25.7.25) Our Ref: BS/2205771/IRMUpdateAdditional Docs13 Aug 2025View
Ford Airfield Planning Statement Addendum - IRM_FINAL-IRM_0.1CAdditional Docs13 Aug 2025View
Heritage Statement Addendum_180641_July_2025Additional Docs13 Aug 2025View
Runway Crossing TOR-RMIN-XX-DR-L-P-027 Rev.BAdditional Docs13 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report July 2025 - 2205771-R16-EAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 1 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 2 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 3 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 4 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 5 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 6 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 7 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 8 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 9 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 10 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 11 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 12 FRA & Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 13 C85228-JNP-92-XX-RP-C-1000_P02 Drainage Technical NoteAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 14 C85228-JNP-92-XX-RP-C-1000_P02 Appendix A FINAL ADC commentAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 15 C85228-JNP-92-XX-RP-C-1000_P02 Appendix B FINAL - Existing Catchment_OpAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 16 C85228-JNP-92-XX-RP-C-1000_P02 Appendix C FINAL - Offsite SewerAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 17 C85228-JNP-92-XX-RP-C-1000_P02 Appendix D FINAL - Winter SiteAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 18 C85228-JNP-92-XX-RP-C-1000_P02 Appendix D2 FINAL - Winter SiteAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 19 C85228-JNP-92-XX-RP-C-1000_P02 Appendix E1 FINAL - Northern Infiltration BasinAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 20 C85228-JNP-92-XX-RP-C-1000_P02 Appendix E1 FINAL - NorthernAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 21 C85228-JNP-92-XX-RP-C-1000_P02 Appendix F FINAL - Ford RoadAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 22 C85228-JNP-92-XX-RP-C-1000_P02 Appendix G FINAL - Employment ZoneAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 23 C85228-JNP-92-XX-RP-C-1000_P02 Appendix H FINAL - NorthwestAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 24 C85228-JNP-92-XX-RP-C-1000_P02 Appendix I1 FINAL - Southern AttenuationAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 25 C85228-JNP-92-XX-RP-C-1000_P02 Appendix I2 FINAL - Southern AttenuationAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 27 C85228-JNP-92-XX-RP-C-1000_P02 Appendix J FINAL - Southern AttenuationAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 29 C85228-JNP-92-XX-RP-C-1000_P02 Appendix K FINAL - Southern AttenuationAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report - Appendix A1 - Part 30 C85228-JNP-92-XX-RP-C-1000_P02 Appendix L FINAL - Sitewide Drainage opAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix A2 - Land SaleAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix A3 - On site CCTV Drainage Survey ReportAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix B1 2205771-100P15 Enabling Infrastructure GAAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix C1 - Ford Airfield LLFA Pre-app comments responseAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix BC2-05.03.25_ADC DrainageAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D1 Part 1 RSK Geo-environmental and geotechnical site assessment - November 2018_Part1Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D1 Part 2 RSK Geo-environmental and geotechnical site assessment - November 2018_Part2Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D1 Part 3 RSK Geo-environmental and geotechnical site assessment - November 2018_Part3Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D2 Part 1 RSK Ford Airfield Infiltration Testing Investigation - April 2020_Part1Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D2 Part 2 RSK Ford Airfield Infiltration Testing Investigation - April 2020_Part2Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D2 Part 3 RSK Ford Airfield Infiltration Testing Investigation - April 2020_Part3Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 1 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 2 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 3 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 4 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 5 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 6 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D3 Part 7 Omnia Winter Groundwater Monitoring - May 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D4 Part 1 Omnia - Infiltration Report December 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D4 Part 2 Omnia - Infiltration Report December 2024Additional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix D5 2205771-1955A - Infiltration Constraints Plan - NorthAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.1 2205771-130 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.2 2205771-131 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.3 2205771-132 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.4 2205771-133 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.5 2205771-134 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.6 2205771-135 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.7 2205771-136 IRM - Drainage StrategyAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix E.9 2205771-D250 Pre-development Catchment Areas PlanAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix F.0 Greenfield runoff rate estimation - members UK SuDSAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix F1 North Net Calcs 2,30,100+cc 1cvAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix F2 South Net 1 Calcs 2,30,100+cc 1cvAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix F3 South Net 2 Calcs 2,30,100+cc 1cvAdditional Docs12 Aug 2025View
Infrastructure Reserved Matters (IRM) Drainage Strategy Report Appendix G.1 - 2205571 - Ford Airfield Maintenance & Management PlanAdditional Docs12 Aug 2025View
Covering letter 28.7.25 (linked to subs 6.8.25)Additional Docs12 Aug 2025View
IRM HERITAGE STATEMENT 10.A DEC 2024Additional Docs7 Jan 2025View
IRM 09.A WASTE INFRASTRUCTURE TECHNICAL NOTE DEC 2024Additional Docs7 Jan 2025View
Planning Performance AgreementAdditional Docs19 Dec 2024View
Environmental Health responseConsultation23 Dec 2025View
Environmental Health responseConsultation23 Dec 2025View
Ecology ResponseConsultation13 Nov 2025View
WSCC LLFA Surface Water Drainage Response 9th May 2025Consultation13 Nov 2025View
WSCC LLFA Surface Water Drainage Response 9th December 2024Consultation13 Nov 2025View
Conservation Officer - 29.08.2025Consultation20 Oct 2025View
WSCC LLFA Surface Water Drainage response dated 29th August 2025Consultation17 Oct 2025View
External Noise Consultant Technical Memo 8th July 2025Consultation15 Oct 2025View
External Noise Consultant Technical Memo 25 Sep 2025Consultation15 Oct 2025View
External Noise Consultant Comments on Revised Noise AssessmentConsultation15 Oct 2025View
WSCC - Highways AuthorityConsultation9 Sept 2025View
parks and landscapesConsultation3 Sept 2025View
WSCC Highways PROW responseConsultation3 Sept 2025View
Engineers Comments Regarding Surface Water DrainageConsultation1 Aug 2025View
WSCC LLFA Surface Water Drainage response dated 25th June 2025Consultation30 Jun 2025View
Southern Water ResponseConsultation13 May 2025View
WSCC LLFA Surface Water Drainage response dated 30th October 2024Consultation13 May 2025View
Southern Water responseConsultation7 May 2025View
WSCC LLFA Surface Water Drainage response dated 5th March 2025Consultation24 Apr 2025View
consultation comment from the Design OfficerConsultation1 Apr 2025View
Ecology responseConsultation11 Mar 2025View
Environmental Health responseConsultation10 Mar 2025View
WSCC Highways responseConsultation7 Mar 2025View
Engineers Comments Regarding Surface Water DrainageConsultation5 Mar 2025View
Arun Parks and Landscapes response ameneded 26/02/2025Consultation27 Feb 2025View
Arun Parks and Landscapes responseConsultation24 Feb 2025View
South Downs National Park Authority responseConsultation20 Feb 2025View
WSCC PROW responseConsultation18 Feb 2025View
WSCC LLFA Surface Water Drainage response dated 17th February 2025Consultation18 Feb 2025View
Active Travel England responseConsultation18 Feb 2025View
WSCC Minerals & Waste Planning AuthorityConsultation14 Feb 2025View
Southern Water responseConsultation10 Feb 2025View
South Downs National Park acknowledgementConsultation30 Jan 2025View
Sussex Police responseConsultation30 Jan 2025View
Southern Water responseConsultation6 Jan 2025View
Arun District Council Leisure & GreenspaceConsultation29 Nov 2024View
Conservation Officers responseConsultation4 Nov 2024View
WSCC LLFA Surface Water Drainage response dated 20th October 2024Consultation1 Nov 2024View
Ford Parish Council ResponseConsultation29 Oct 2024View
WSCC Minerals and Waste responseConsultation29 Oct 2024View
WSCC Highways - Public Rights of WayConsultation23 Oct 2024View
Sussex Police responseConsultation17 Oct 2024View
Southern WaterConsultation16 Oct 2024View
Active Travel EnglandConsultation16 Oct 2024View
WSCC Highways responseConsultation8 Oct 2024View
WSCC LLFA Surface Water Drainage acknowledgment 1st October 2024Consultation2 Oct 2024View
Environmental Health responseConsultation26 Sept 2024View
PLCOMACKRep Letters29 Jan 2025View
PLCOMACKRep Letters30 Oct 2024View
REPRep Letters28 Oct 2024View
PLCOMACKRep Letters22 Oct 2024View
PLCOMACKRep Letters17 Oct 2024View
Planning Committee Chair Agreement 5th February 2026Planning Correspondence6 Feb 2026View
Applicant agreement to EOT until 11th February 2026Planning Correspondence6 Feb 2026View
EMAIL 16.12.25 pre comittee subplansPlanning Correspondence24 Dec 2025View
Email re late registering to speak at committeePlanning Correspondence18 Dec 2025View
Agreement of pre-commencement conditionsPlanning Correspondence16 Dec 2025View
EMAIL 25.11.25 subplansPlanning Correspondence1 Dec 2025View
Cover email 1 of 3 16.09.25Planning Correspondence22 Sept 2025View
Cover email 2 of 3 16.09.25Planning Correspondence22 Sept 2025View
Cover email 3 of 3 16.09.25Planning Correspondence22 Sept 2025View
Covering letter linked to subs 7.8.25Planning Correspondence20 Aug 2025View
Applicant comments to Drainage Objection dated 30th July 2025Planning Correspondence12 Aug 2025View
EOT to 19.09.25Planning Correspondence8 Jul 2025View
Email linked to subs 30.5.25Planning Correspondence6 Jun 2025View
12th March Additional Drainage Testing Data for IRM and RM1N - Covering EmailPlanning Correspondence25 Mar 2025View
EOT Agreement until 30th April 2025Planning Correspondence19 Mar 2025View
Extension of time to 28/03/25Planning Correspondence10 Feb 2025View
Covering letter V9 with list of plans as at 30/01/25Planning Correspondence31 Jan 2025View
Covering letter with list of plans as at 29/01/25Planning Correspondence29 Jan 2025View
Covering letter (v7) with list of plans as at 230125Planning Correspondence23 Jan 2025View
Covering letter version 5 listing all plans wef 21/01/25 ( Letter dated 20/12/24 )Planning Correspondence22 Jan 2025View
Covering letter with list of plans as at 20/12/24Planning Correspondence21 Jan 2025View
EMAIL REQUESTING SUB PLANS 23.12.24Planning Correspondence7 Jan 2025View
COVERING LETTER SUBS AND SUP PLANS 20.12.24Planning Correspondence7 Jan 2025View
EMAIL LINKED TO VEHICLE PLANS 1-3 5.11.24Planning Correspondence7 Jan 2025View
EMAIL LINKED TO DRAINAGE 14.11.2024Planning Correspondence26 Nov 2024View
Confirmation of Extension Of Time until 21st February 2024Planning Correspondence22 Nov 2024View
Systems CorrespondenceSystems Correspondence4 Dec 2025View
Systems CorrespondenceSystems Correspondence4 Dec 2025View
PLACKSystems Correspondence12 Sept 2024View
PLACKPPSystems Correspondence11 Sept 2024View
RMIN-XX-DR-L-P-001-G-Reserved Matters Infrastructure - Landings Green 1 of 2Superseded Document1 Dec 2025View
RMIN-XX-DR-L-P-002-G-Reserved Matters Infrastructure - Landings Green 2 of 2Superseded Document1 Dec 2025View
RMIN-XX-DR-L-P-008-G-Reserved Matters Infrastructure - Ryebank Park 1 of 2Superseded Document1 Dec 2025View
RMIN-XX-DR-L-P-009-G-Reserved Matters Infrastructure - Ryebank Park 2 of 2Superseded Document1 Dec 2025View
RMIN-XX-DR-L-P-013-G-Composite Landscape MasterplanSuperseded Document1 Dec 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 1)Superseded Document22 Sept 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 2)Superseded Document22 Sept 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 3)Superseded Document22 Sept 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 4)Superseded Document22 Sept 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 5)Superseded Document22 Sept 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 6)Superseded Document22 Sept 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V9 26th Aug 2025 (Part 7)Superseded Document22 Sept 2025View
IRM-SITE SECTIONS (SHEET 1) 2205771-D170 REV BSuperseded Document20 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part1)Superseded Document13 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part2)Superseded Document13 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part3)Superseded Document13 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part4)Superseded Document13 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part5)Superseded Document13 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part6)Superseded Document13 Aug 2025View
IRM Ecological Protection & Enhancement Plan UES04099/22 V8 25 July 2025 (Part7)Superseded Document13 Aug 2025View
IRM - Vehicle Tracking and Visibility Plan (Sheet 3 of 7) 2205771-D012 Rev ESuperseded Document13 Aug 2025View
IRM Enabling Infrastructure General Arrangement 2205771-D100 RevP15Superseded Document13 Aug 2025View
Infrastructure RM- Levels Strategy (sheet 2) 2205771-D151 Rev.DSuperseded Document13 Aug 2025View
Infrastructure RM- Levels Strategy (sheet 5) 2205771-D154 Rev.DSuperseded Document13 Aug 2025View
Infrastructure RM- Levels Strategy (sheet 7) 2205771-D156 Rev.DSuperseded Document13 Aug 2025View
The Landings, Ford Airfield - INFRA (Landscape) Planning Drawing Issue SheetSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Landing Green 1 of 2 TOR-RMIN_XX_DR_L_P-001 Rev.FSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Landing Green 2 of 2 TOR-RMIN_XX_DR_L_P-002 Rev.FSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Primary Street North 2 of 2 TOR-RMIN_XX_DR_L_P-005 Rev.FSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Primary Street (Central) TOR-RMIN_XX_DR_L_P-006 Rev.FSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Ryebank Park 1 of 2 TOR-RMIN_XX_DR_L_P-008 Rev.FSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Ryebank Park 2 of 2 TOR-RMIN_XX_DR_L_P-009 Rev.FSuperseded Document13 Aug 2025View
Reserved Matters Infrastructure Planting Schedule TOR-RMIN_XX_DR_L_P-010 Rev.ESuperseded Document13 Aug 2025View
Composite Landscape Masterplan, RM1, RM4 and RM Infrastructure TOR-RMIN_XX_DR_L_P-013 Rev.FSuperseded Document13 Aug 2025View
Play Provision Landings Green Reserved Matters Infrastructure TOR-RMIN_XX_DR_L_P-014 Rev.CSuperseded Document13 Aug 2025View
Ryebank Park Basin Sections Ryebank Park 1 of 2 TOR-RMIN_XX_DR_L_P-022 Rev.C (Could be sheet 2 of 2 - labelled incorrectly?)Superseded Document13 Aug 2025View
St Mary's Meadow Future Connections TOR-RMIN-XX-DR-L-P-023 Rev.ASuperseded Document13 Aug 2025View
Landscape Acoustic Mitigation, Ford Airfield Industrial Estate TOR-RMIN-XX-DR-L-P-024Superseded Document13 Aug 2025View
Landscape Acoustic Mitigation, Planting Schedules and Elevation TOR-RMIN-XX-DR-L-P-025Superseded Document13 Aug 2025View
Landscape Acoustic Mitigation, South yard, Ford Lane TOR-RMIN-XX-DR-L-P-026Superseded Document13 Aug 2025View
IRM Drainage Strategy (Sheet 2 of 7) 2205771-D131 Rev.FSuperseded Document12 Aug 2025View
IRM Drainage Strategy (Sheet 5 of 7) 2205771-D134 Rev.DSuperseded Document12 Aug 2025View
IRM Drainage Strategy (Sheet 7 of 7) 2205771-D136 Rev.DSuperseded Document12 Aug 2025View
IRM Drainage Strategy (Sheet 1 of 7) 2205771-D130 Rev CSuperseded Document6 Jun 2025View
IRM Drainage Strategy (Sheet 2 of 7) 2205771-D131 Rev DSuperseded Document6 Jun 2025View
IRM Drainage Strategy (Sheet 3 of 7) 2205771-D132 Rev DSuperseded Document6 Jun 2025View
IRM Drainage Strategy (Sheet 4 of 7) 2205771-D133 Rev DSuperseded Document6 Jun 2025View
IRM Drainage Strategy (Sheet 5 of 7) 2205771-D134 Rev CSuperseded Document6 Jun 2025View
IRM Drainage Strategy (Sheet 5 of 7) 2205771-D134 Rev CSuperseded Document6 Jun 2025View
IRM Drainage Strategy (Sheet 7 of 7) 2205771-D136 Rev CSuperseded Document6 Jun 2025View
IRM Enabling Infrastructure General Arrangement 2205771-D0100 Rev P13Superseded Document6 Jun 2025View
Sitewide Indicative Surface Water Drainage Strategy 2205771 D020 Rev HSuperseded Document6 Jun 2025View
IRM Infiltration Constraints Plan �¢?? North 2205773-1995 Rev ASuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 10 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 11 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 12 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 13 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 14 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 15 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 16 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 17 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 18 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 19 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 1 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 20 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 21 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 22 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 23 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 24 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 25 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 26 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 27 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 28 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 2 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 3 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 4 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 5 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 6 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 7 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 8 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A1 - Part 9 of 28 - Outline Flood Risk Assessment and Drainage StrategySuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A2 - Excerpt of Land DealSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix A2 - On-Site CCTV Drainage Survey ReportSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix B - Proposed Development LayoutSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix BC - ADC Drainage Team and WSCC (LLFA) Post-Submission ResponsesSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D1 â?? Part 1 of 3 - RSK Geo-Environmental and Geotechnical Site Assessment â?? November 2018Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D1 â?? Part 2 of 3 - RSK Geo-Environmental and Geotechnical Site Assessment â?? November 2018Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D1 â?? Part 3 of 3 - RSK Geo-Environmental and Geotechnical Site Assessment â?? November 2018Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D2 - Part 1 of 3 - RSK Infiltration Testing Investigation â?? April 2020Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D2 - Part 2 of 3 - RSK Infiltration Testing Investigation â?? April 2020Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D2 - Part 3 of 3 - RSK Infiltration Testing Investigation â?? April 2020Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 1 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 2 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 3 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 4 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 5 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 6 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D3 - Part 7 of 7 - Omnia Winter Groundwater Monitoring â?? May 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D4 - Part 1 of 2 - Omnia Infiltration Factual Report â?? December 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D4 - Part 2 of 2 - Omnia Infiltration Factual Report â?? December 2024Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix D5 - Infiltration Constraints Plan â?? North (Ardent Drg No. 2205773-1955)Superseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 1 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 2 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 3 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 4 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 5 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 6 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 7 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 8 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix E - Part 9 of 9 - Foul and Surface Water Drainage Strategy PlansSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F - Greenfield Runoff CalculationsSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F1 - Northern Infra Network 1-1 Year and 1-30 YearSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F2 - Northern Infra Network 1-100 Year + 40% CCSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F3 - Southern Infra Network 1-1 Year + 1-30 YearSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F4 - Southern Infra Network 1-100 Year + 40% CCSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F5 - Southern Infra Network 2-1 Year and 1-30 YearSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix F6 - Southern Infra Network 2-100 Year + 40% CCSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report Appendix G - Maintenance and Management PlanSuperseded Document6 Jun 2025View
IRM Drainage Strategy Report 2205771-R16-D - May 2025Superseded Document6 Jun 2025View
27th Febraury Ardent Response to LLFA Commnents - 2205771/VL/25-02-2025Superseded Document19 Mar 2025View
12th March - Ardent Response Additional Testing Data for IRM and RM1NSuperseded Document12 Mar 2025View
Reserved Matters Infrastructure Ryebank 2 of 2 TOR-RMN1_XX-DR-L-P-009 Rev DSuperseded Document31 Jan 2025View
LLFA Response from Ardent 02/12/24Superseded Document29 Jan 2025View
Covering email with LLFA Response 03/12/24Superseded Document29 Jan 2025View
Infrastructure RM (IRM) Transpport Technical Note IRM-03.B December 2024 Part 3 (Including Vehicle Tracking plans 1-7)Superseded Document23 Jan 2025View
Infrastructure RM (IRM) Transpport Technical Note IRM-03.B December 2024 Part 4( Including Vehicle tracking plans 1-7)Superseded Document23 Jan 2025View
Sitewide Indicative Surface Wat Drainage Strategy 2205771 D020 Rev HSuperseded Document23 Jan 2025View
Landscape Primary Street North 2 of 2 TOR-RMIN-XX-DR-L-P-005 Rev DSuperseded Document22 Jan 2025View
Landscape Primary Street Central TOR-RMIN-XX-DR-L-P-006 Rev DSuperseded Document22 Jan 2025View
Landscape Primary Street South TOR-RMIN-XX-DR-L-P-007 Rev DSuperseded Document22 Jan 2025View
Reserved Matters Infrastructure Ryebank Park 1 of 2 TOR-RMIN-XX-DR-L-P-008 Rev DSuperseded Document22 Jan 2025View
Planting Schedules TOR-RMIN-XX-DR-L-P-010 Rev CSuperseded Document22 Jan 2025View
Planting Schedules TOR-RMIN-XX-DR-L-P-010 Rev CSuperseded Document22 Jan 2025View
Site Sections Landings Green TOR-RMIN-XX-DR-L-P-011 Rev BSuperseded Document22 Jan 2025View
Site Sections Ryebank Park TOR-RMIN-XX-DR-L-P-012 Rev BSuperseded Document22 Jan 2025View
Composite Landscape materplan TOR-RMIN-XX-DR-L-P-013 Rev BSuperseded Document22 Jan 2025View
Play Provision Arun Way TOR-RMIN-XX-DR-L-P-015 Rev BSuperseded Document22 Jan 2025View
Landscape St Marys Meadow TOR-RMIN-XX-DR-L-P-019 Rev ASuperseded Document22 Jan 2025View
Ryebank Park Basin Sections 1 of 2 TOR-RMIN-XX-DR-L-P-021 Rev ASuperseded Document22 Jan 2025View
Ryebank Park Basin Sections 1of 2 TOR-RMIN-XX-DR-L-P-022 Rev ASuperseded Document22 Jan 2025View
Infrastructure RM Drawings Issue sheet 090125Superseded Document22 Jan 2025View
Landings Green 1 of 2 TOR-RMIN-XX-DR-L-P-001 Tev DSuperseded Document22 Jan 2025View
Landings Green 2 of 2 TOR-RMIN-XX-DR-L-P-002 Rev DSuperseded Document22 Jan 2025View
Landscape Arun Way TOR-RMIN-XX-DR-L-P-003 Rev DSuperseded Document22 Jan 2025View
Landscape Primary Street North 1 of 2 TOR-RMIN-XX-DR-L-004 Rev DSuperseded Document22 Jan 2025View
Ryebank Park Basin Sections 2 of 2 TOR-RMIN-XX-DR-L-022 Rev ASuperseded Document22 Jan 2025View
Infrastructure RM (IRM) Transpport Technical Note IRM-03.B December 2024 Part 1 ( Including Vehicle Tracking Plans 1-7)Superseded Document22 Jan 2025View
Infrastructure RM (IRM) Transpport Technical Note IRM-03.B December 2024 Part 2 (Including Vehicle Tracking Plans1-7)Superseded Document22 Jan 2025View
Arboricultural Impact Appraisal and Method Statment IRM_05.B December 2024Superseded Document21 Jan 2025View
Tree Protection Plan 24053-17-IRMSuperseded Document21 Jan 2025View
Enabling Infrastructure General Arrangement 2205771-D0100 Rev P13Superseded Document21 Jan 2025View
IRM Drainage Strategy Sheet 1 2205771-130 Rev BSuperseded Document21 Jan 2025View
IRM-Drainage Strategy Sheet 2 2205771-131 Rev BSuperseded Document21 Jan 2025View
IRM Drainage Strategu Sheet 3 2205771-132 Rev BSuperseded Document21 Jan 2025View
IRM-Drainage Strategy Sheet 4 2205771 -133 rev CSuperseded Document21 Jan 2025View
IRM-Drainage Strategy Sheet 5 2205771-134 Rev BSuperseded Document21 Jan 2025View
IRM-Drainage Strategy Sheet 6 2205771-135 Rev BSuperseded Document21 Jan 2025View
IRM-Drainage Strategy Sheet 7 2205771-136 Rev BSuperseded Document21 Jan 2025View
IRM Drainage Strategy Sheet 2 220577--131 Rev CSuperseded Document21 Jan 2025View
IRM Drainage Strategy Sheet 3 2205771-132 Rev CSuperseded Document21 Jan 2025View
IRM-SITE SECTIONS (SHEET 1) 2205771-D170 REV ASuperseded Document7 Jan 2025View
PLANNING STATEMENT IRM 01.B REV A DEC 2024Superseded Document7 Jan 2025View
IRM ECOLOGICAL PROTECTION & ENHANCEMENT PLAN 02.B DEC 2024Superseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 7) 2205771-D156 REV CSuperseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 2) 2205771-D151 REV DSuperseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 3) 2205771-D152 REV DSuperseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 1) 2205771-D150 REV CSuperseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 4) 2205771-D153 REV CSuperseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 5) 2205771-D154 REV CSuperseded Document7 Jan 2025View
IRM LEVEL STRATEGY (SHEET 6) 2205771-D155 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE - LANDINGS GREEN (1 of 2) TOR-RMIN-XX-DR-L-P-001 REV.C DEC 2024Superseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE - LANDINGS GREEN (2 of 2) TOR-RMIN-XX-DR-L-P-002 REV.C DEC 2024Superseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- ARUN WAY - TOR-RMIN-XX-DR-L-P-003 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- PRIMARY STRT (NORTH) 1 OF 2- TOR-RMIN-XX-DR-L-P-004 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- PRIMARY STRT (NORTH) 1 OF 2- TOR-RMIN-XX-DR-L-P-005 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- RYEBBANK PARK 2 OF 2- TOR-RMIN-XX-DR-L-P-009 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- RYEBBANK PARK 1 OF 2- TOR-RMIN-XX-DR-L-P-008 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- SITE SECTIONS - LANDINGS GREEN - TOR-RMIN-XX-DR-L-P-0011 REV ASuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- PLANTING SCHEDULES- TOR-RMIN-XX-DR-L-P-010 REV BSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE- SITE SECTIONS RYEBANK PARK - TOR-RMIN-XX-DR-L-P-012 REV ASuperseded Document7 Jan 2025View
PLAY PROVISION ARUN WAY - RESERVED MATTERS INFRASTRUCTURE - TOR-RMIN-XX-DR-L-P-015 REV ASuperseded Document7 Jan 2025View
PLAY PROVISION RYEBANK PARK RESERVED MATTERS INFRASTRUCTURE - TOR-RMIN-XX-DR-L-P-016 REV ASuperseded Document7 Jan 2025View
COMPOSITE LANDSCAPE MASTERPLAN RM1, RM4 AND RM INFRASTRUCTURE TOR-RMIN-XX-DR-L-P-013 REV ASuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE PRIMARY SHEET (SOUTH) TOR-RMIN-XX-DR-L-P-007 REV CSuperseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE PRIMARY SHEET (CENTRAL) TOR-RMIN-XX-DR-L-P-006 REV CSuperseded Document7 Jan 2025View
PLAY PROVVISION LANDINGS GREEN RESERVED MATTERS INFRASTRUCTURE TOR-RMIN-XX-DR-L-P-014 REV ASuperseded Document7 Jan 2025View
RYEBANK PARK BASIN SECTIONS 2 OF 2 TOR-RMIN-XX-DR-L-P-022Superseded Document7 Jan 2025View
PLAY PROVISION ST MARY'S MEADOW TOR-RMIN-XX-DR-L-P-017Superseded Document7 Jan 2025View
PLAY PROVISION CLIMPING EDGE RESERVED MATTERS INFRASTRUCTURE TOR-RMIN-XX-DR-L-P-018Superseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE ST MARY'S MEADOW -TOR-RMIN-XX-DR-L-P-019Superseded Document7 Jan 2025View
RESERVED MATTERS INFRASTRUCTURE CLIMPING EDGE TOR-RMIN-XX-DR-L-P-020Superseded Document7 Jan 2025View
RYEBANK PARK BASIN SECTIONS 1 OF 2 TOR-RMIN-XX-DR-L-P-021Superseded Document7 Jan 2025View
SITEWIDE INDICATIVE SURFACE WATER DRAINAGE STRATEGY 2205771-D020 REV.HSuperseded Document7 Jan 2025View
INFRASTRUCTURE RM-IMPERMEABLE AREAS PLAN (SHEET 1) 2205771-210 REV BSuperseded Document7 Jan 2025View
INFRASTRUCTURE RM-IMPERMEABLE AREAS PLAN (SHEET 1) 2205771-210 REV BSuperseded Document7 Jan 2025View
INFRASTRUCTURE RM-IMPERMEABLE AREAS PLAN (SHEET 2) 2205771-211 REV BSuperseded Document7 Jan 2025View
INFRASTRUCTURE RM-IMPERMEABLE AREAS PLAN (SHEET 2) 2205771-211 REV BSuperseded Document7 Jan 2025View
IRM DRAINAGE TECHNICAL NOTE 0.4B DEC 2024 (INC DRAINAGE STRATEGY SHEET 1-7)Superseded Document7 Jan 2025View
IRM - VEHICLE TRACKING AND VISBILITY PLAN (1 OF 7) 2205771-D010 REV C - IN TECHNICAL NOTE 0.3B Dec2024Superseded Document7 Jan 2025View
IRM - VEHICLE TRACKING AND VISBILITY PLAN (2 OF 7) 2205771-D011 REV C - IN TECHNICAL NOTE 0.3B Dec2024Superseded Document7 Jan 2025View
IRM - VEHICLE TRACKING AND VISBILITY PLAN (3 OF 7) 2205771-D012 REV C - IN TECHNICAL NOTE 0.3B Dec2024Superseded Document7 Jan 2025View
FORD DRAINAGE RESPONSE 13.11.24 & 19.7.2024Superseded Document26 Nov 2024View
Planning statement IRM_01.ASuperseded Document18 Sept 2024View
Arun Way TOR-RMIN-XX-DR-L-P-003 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels strategy (sheet 1) 2205771-D150 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels strategy sheet (sheet 2) 2205771-D151 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels strategy (sheet 3) 2205771-D152 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels strategy (sheet 4) 2205771-D153 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels trategy (sheet 5) 2205771-D154 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels strategy (sheet 6) 2205771-D155 BSuperseded Document11 Sept 2024View
Infrastructure RM - levels strategy (sheet 7) 2205771-D156 BSuperseded Document11 Sept 2024View
Infrastructure RM - impermeable areas plan (sheet 1)Superseded Document11 Sept 2024View
Infrastructure RM - impermeable area plan (sheet 2) 2205771-211Superseded Document11 Sept 2024View
Enabling infrastructure general arrangement 2205771-D100 P12Superseded Document11 Sept 2024View
Planning statementSuperseded Document11 Sept 2024View
Infrastructure RM location plan 2205771-D060 ASuperseded Document11 Sept 2024View
Vehicle tracking and visibility plan (sheets 4 to 7) -IN TECHNICAL NOTE 0.3B Dec2024Superseded Document11 Sept 2024View
Arboricultural impact appraisal and method statementSuperseded Document11 Sept 2024View
Tree protection plan 24053-12 IRMSuperseded Document11 Sept 2024View
Drainage technical note - 1 of 4Superseded Document11 Sept 2024View
Drainage technical note - 2 of 4Superseded Document11 Sept 2024View
Drainage technical note - 3 of 4Superseded Document11 Sept 2024View
Drainage technical note - 4 of 4Superseded Document11 Sept 2024View
Landings green 1 of 2 TOR-RMIN-XX-DR-L-P-001 BSuperseded Document11 Sept 2024View
Landings Green 2 of 2 TOR-RMIN-XX-DR-L-P-002 BSuperseded Document11 Sept 2024View
Arun Way TOR-RMIN-XX-DR-L-P-003 BSuperseded Document11 Sept 2024View
Primary street north 1 of 2 TOR-RMIN-XX-DR-L-P-004 BSuperseded Document11 Sept 2024View
Primary street north 2 of 2 TOR-RMIN-XX-DR-L-P-005 BSuperseded Document11 Sept 2024View
Primary street (central) TOR-RMIN-XX-DR-L-P-006 BSuperseded Document11 Sept 2024View
Primary street (south) TOR-RMIN-XX-DR-L-P-007 BSuperseded Document11 Sept 2024View
Ryebank PArk 1 of 2 TOR-RMIN-XX-DR-L-P-008 BSuperseded Document11 Sept 2024View
Ryebank park 2 of 2 TOR-RMIN-XX-DR-L-P-009 BSuperseded Document11 Sept 2024View
Planting schedules TOR-RMIN-XX-DR-L-P-010 ASuperseded Document11 Sept 2024View
Site sections - landings green TOR-RMIN-XX-DR-L-P-011Superseded Document11 Sept 2024View
Site sections - Ryebank Park TOR-RMIN-XX-DR-L-P-012Superseded Document11 Sept 2024View
Composite landscape masterplan RM1, RM4 and RMI TOR-RMIN-XX-DR-L-P013Superseded Document11 Sept 2024View
Play provision Landings green TOR-RMIN-XX-DR-L-P-014Superseded Document11 Sept 2024View
Play provision Arun Way TOR-RMIN-XX-DR-L-P-015Superseded Document11 Sept 2024View
Play provision Ryebank Park TOR-RMIN-XX-DR-L-P-016Superseded Document11 Sept 2024View
Landings green 1 of 2 TOR-RMIN-XX-DR-L-P-001 BSuperseded Document11 Sept 2024View
Landings green 2 of 2 TOR-RMIN-XX-DR-L-P-002 BSuperseded Document11 Sept 2024View
Primary street north 1 of 2 TOR-RMIN-XX-DR-L-P-004 BSuperseded Document11 Sept 2024View
Primary street north 2 of 2 TOR-RMIN-XX-DR-L-P-005 BSuperseded Document11 Sept 2024View
Primary street (central) TOR-RMIN-XX-DR-L-P-006 BSuperseded Document11 Sept 2024View
Primary street (south) TOR-RMIN-XX-DR-L-P-007 BSuperseded Document11 Sept 2024View
Ryebank park 1 of 2 TOR-RMIN-XX-DR-L-P-008 BSuperseded Document11 Sept 2024View
Ryebank park 2 of 2 TOR-RMIN-XX-DR-L-P-009 BSuperseded Document11 Sept 2024View
Ecological protection and enhancement plan IRM_02.ASuperseded Document11 Sept 2024View
IRM - site sections (sheet 1) 2205771-D170Superseded Document11 Sept 2024View
IRM - site section (sheet 20 2205771-D171Superseded Document11 Sept 2024View
IRM - site sections (sheet 3) 2205771-D172Superseded Document11 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

ApproveConditionally
Decision Scheme of delegation form Scheme of delegation form
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.