Council planning record

Replacement of existing cladding, installation of new roller shutter doors, roof alterations including increase in eaves height and alterations to fenestration. This application is in CIL Zone 2 (Zero Rated) as other development.

Hangar 2 Ford Airfield Industrial Estate Ford BN18 0XL

ApproveConditionallyReference: F/1/26/PLArun District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
ApproveConditionally
Application type
Not published
Received
13 Jan 2026
Validated
16 Jan 2026
Determination deadline
13 Mar 2026
Local authority
Arun District Council

Application overview

Replacement of existing cladding, installation of new roller shutter doors, roof alterations including increase in eaves height and alterations to fenestration. This application is in CIL Zone 2 (Zero Rated) as other development.

Proposal details

Reference
F/1/26/PL
Parish
Ford
Agent
Grundon Waste Management Ltd Grange Lane Beenham RG7 5PY

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Hangar 2 Ford Airfield Industrial Estate Ford BN18 0XL

This record has no verified map location.

Documents 24 of 24

DocumentPublishedAction
DecisionDecision11 Mar 2026View
Officers ReportOfficers Report11 Mar 2026View
Application Form - Without Personal DataApplication14 Jan 2026View
CIL 1 FORMCIL Form14 Jan 2026View
EXISTING AND PROPOSED ELEVATIONS DG/ES/FOR/H2/02Plans16 Jan 2026View
EXISTING AND PROPOSED GROUND FLOOR PLANS DS/ES/FOR/H2/11Plans16 Jan 2026View
BLOCK PLAN DG/ES/FOR/H2/01Plans15 Jan 2026View
LOCATION PLANPlans15 Jan 2026View
EXISTING AND PROPOSED ROOF PLAN DG/ES/FOR/H2/03Plans14 Jan 2026View
EXISTING UPSTAIRS OFFICES AND MEZZANINE FLOOR PLAN DG/ES/FOR/H2/05Plans14 Jan 2026View
EXISTING OPEN HANGAR FLOOR PLAN DG/ES/FOR/H2/06Plans14 Jan 2026View
EXISTING OPEN HANGAR OFFICES FLOOR PLAN DG/ES/FOR/H2/07Plans14 Jan 2026View
EXISTING DOWNSTAIRS OFFICES FLOOR PLAN DG/ES/FOR/H2/08Plans14 Jan 2026View
EXISTING OFFICES UNDER MEZZANINE FLOOR PLAN DG/ES/FOR/H2/09Plans14 Jan 2026View
PROPOSED FLOOR PLAN DG/ES/FOR/H2/04Plans14 Jan 2026View
LAND OWNERSHIP AREA (LOCATION PLAN) DG/ES/FOR/H2/01Plans14 Jan 2026View
PLANNING, DESIGN AND ACCESS STATEMENTStatement14 Jan 2026View
WASTE INFRASTRUCTURE STATEMENTStatement14 Jan 2026View
West Sussex Minerals & Waste responseConsultation11 Feb 2026View
WSCC Minerals & Waste responseConsultation2 Feb 2026View
EMAIL 28.1.26 amended description.Planning Correspondence3 Feb 2026View
Systems CorrespondenceSystems Correspondence16 Jan 2026View
Systems CorrespondenceSystems Correspondence14 Jan 2026View
Systems CorrespondenceSystems Correspondence14 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

ApproveConditionally
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.