Council planning record

Application for approval of matters reserved by condition imposed under BN/16/12/ (APP/C3810/A/13/2193942) relating to conditions 5-surface water drainage, 6-maintenance of SUDs, 7-foul drainage system, 8-schedule of materials & finishes, 11-scheme for protection of retained trees, 13-plan indicating boundary treatments, 17-ecological enhancement measures, 18-mitigation & translocation plan for reptiles, 19-Ecological Clerk of Works for final bat checks & soft tree felling, 20-mitigation for noise sensitive facades & amenity areas, 21-pedestrian & cycle paths, 23-layout & specifications of & construction programme for roads, including access, footpaths, foul & surface water drainage & means of disposal, 25-pedestrian visibility splays & 26-Travel Plan.

Land at former Pollards Nursery Lake Lane Bognor Regis

DOC Part ApprovedReference: BN/32/17/DOCArun District Council

Last published check: 10 Oct 2026, 10:28. Check the council record for more recent changes.

Application location

Land at former Pollards Nursery Lake Lane Bognor Regis

This record has no verified map location.

Application summary

Status
DOC Part Approved
Application type
Not published
Received
30 Aug 2017
Validated
31 Aug 2017
Determination deadline
15 Dec 2017
Local authority
Arun District Council

Application overview

Application for approval of matters reserved by condition imposed under BN/16/12/ (APP/C3810/A/13/2193942) relating to conditions 5-surface water drainage, 6-maintenance of SUDs, 7-foul drainage system, 8-schedule of materials & finishes, 11-scheme for protection of retained trees, 13-plan indicating boundary treatments, 17-ecological enhancement measures, 18-mitigation & translocation plan for reptiles, 19-Ecological Clerk of Works for final bat checks & soft tree felling, 20-mitigation for noise sensitive facades & amenity areas, 21-pedestrian & cycle paths, 23-layout & specifications of & construction programme for roads, including access, footpaths, foul & surface water drainage & means of disposal, 25-pedestrian visibility splays & 26-Travel Plan.

Proposal details

Reference
BN/32/17/DOC
Parish
Barnham & Eastergate
Agent
Pegasus Goup Whitworth Road Cirencester GL7 1RT

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 111 of 111

DocumentPublishedAction
DecisionDecision1 Aug 2018View
DecisionDecision31 Jul 2018View
DecisionDecision31 Jul 2018View
DecisionDecision20 Apr 2018View
DecisionDecision18 Apr 2018View
DecisionDecision17 Apr 2018View
DecisionDecision17 Apr 2018View
DecisionDecision26 Mar 2018View
DecisionDecision26 Mar 2018View
DecisionDecision1 Mar 2018View
DecisionDecision1 Mar 2018View
DecisionDecision8 Feb 2018View
DecisionDecision8 Feb 2018View
DecisionDecision26 Jan 2018View
DecisionDecision26 Jan 2018View
DecisionDecision26 Jan 2018View
DecisionDecision26 Jan 2018View
DecisionDecision25 Jan 2018View
ApplicationApplication8 Sept 2017View
Covering Letter re - ConditionsApplication5 Sept 2017View
SUPPLEMENTARY 11/4/2018 Planting plan 1 of 2. 2600-PP-12 Rev P8Plans12 Apr 2018View
SUPPLEMENTARY 11/4/18/ Planting plan 2 of 2. 2600-PP-13 Rev P8Plans12 Apr 2018View
SUPPLEMENTARY 11/4/2018 REF 1701.16693(BARNHAM LEAP-REDROWHOMESPlans11 Apr 2018View
Substitute tree protectioan sheet 1 of 3 710 Rev E 19/03/18Plans19 Mar 2018View
Substitute tree protection plan sheet 2 of 3 711 REV E 19/03/18Plans19 Mar 2018View
Substitute tree protection plan sheet 3 of 3 712 rev E 19/03/18Plans19 Mar 2018View
General arrangment plan sheet 1of 2 2600-LA-13 Rev P9Plans19 Mar 2018View
General arrangment plan sheet 2 of 2 21600-LA-14 Rev P9Plans19 Mar 2018View
Boundary Treatment Plan - P16-0421_05 Rev EPlans16 Nov 2017View
Site Layout plan dwg. P16-0421_03 Sheet 1 Rev HPlans5 Sept 2017View
Boundary Treatments plan dwg. P16-0421_05 sheet 1 Rev DPlans5 Sept 2017View
Engineering Layout plan Sheet 1 of 1 dwg. 17071 - 100 DPlans5 Sept 2017View
External Levels & Features Layout plan Sheet 3 of 3 plan dwg. 17071-103 BPlans5 Sept 2017View
Private Drainage Layout Sheet 1 of 3 plan dwg. 17071 - 111 BPlans5 Sept 2017View
Private Drainage Layout plan Sheet 2 of 3 dwg. 17071-112 CPlans5 Sept 2017View
External Levels & Features Layout Sheet 2 of 3 plan dwg. 17071-102 DPlans5 Sept 2017View
Manhole Schedule Sheet 2 of 2 plan dwg. 17071-201 BPlans5 Sept 2017View
Drainage Area Plan Sheet 1 of 1 dwg. 17071-170 EPlans5 Sept 2017View
Manhole Schedules Sheet 1 of 2 plan dg. 17071-250BPlans5 Sept 2017View
Road & Drainage Longitudinal Sections plan dwg. Sheet 1 of 3 dwg. 17071-200BPlans5 Sept 2017View
Pond Cross Sections plans dwg. 17071 - 330Plans5 Sept 2017View
External Levels & Features Layout plan Sheet 3 of 3 dwg. 17071-113 APlans5 Sept 2017View
Road & Drainage Longitudinal Sections Sheet 3 of 3 plan 17071-252BPlans5 Sept 2017View
Infrastructure Drainage Construction Details plan dwg. 17071/311 APlans5 Sept 2017View
Attenuation Pond and Adoptable Headwall dwg. 17071-316 BPlans5 Sept 2017View
S16 Control Chamber Construction Detail plan dwg. 17071/313APlans5 Sept 2017View
Private Drainage Construction Details Sheet 1 of 3 plan dwg. 17071/322APlans5 Sept 2017View
Private Drainage Construction Details Sheet 1 of 3 plan dwg. 17071/321APlans5 Sept 2017View
Private Drainage Construction Details Sheet 1 of 3 dwg. 17071/323APlans5 Sept 2017View
Pond Cross Sections plan dwg. 17071-330Plans5 Sept 2017View
External Levels & Features Layout Sheet 1 of 3 plan dwg. 17071-101 BPlans5 Sept 2017View
Flood Routing Plan dwg. 17071-190 EPlans5 Sept 2017View
Proposed Roads Construction Program and Details plan dwg. 7430 3.6.002Plans5 Sept 2017View
Access Road Visibility Splays plan dwg. C85102-SK-001Plans5 Sept 2017View
Materials Plan dwg. P16-0421_14 Rev GPlans5 Sept 2017View
Boundary Treatments Details dwg. P16-0421_06Plans5 Sept 2017View
Tree Survey Schedule plan dwg. JSL2477_700, 701 & 703Plans5 Sept 2017View
Superceded 19/03/18 Tree Protection plan (Sheet 3 of 3) dwg. JSL 2477 712 Rev DPlans5 Sept 2017View
Superceded 19/03/18 Tree Protection plan (Sheet 1 of 3) dwg. JSL 2477 710 Rev DPlans5 Sept 2017View
Superceded 190318 Tree Protection plan (Sheet 2 of 3) dwg. JSL 2477 711 Rev DPlans5 Sept 2017View
Road & Drainage Longitudinal Sections sheet 2 of 3 plan dwg. 17071-251 BPlans5 Sept 2017View
SUPPLEMENTARY 11/4/18 Soft landscape and hard surface finishes specification phase 1Statement12 Apr 2018View
SUPPLEMENTARY 11/4/18/ Soft landscape and hard surface finishes specification phase 2Statement12 Apr 2018View
Energy statementStatement19 Mar 2018View
Landscape management plan Phase 1Statement19 Mar 2018View
Landscape managment plan phase 2Statement19 Mar 2018View
Energy Statement Revision B 27 October 2017Statement28 Feb 2018View
Residential Travel Plan - Final Rev BStatement7 Dec 2017View
Travel Welcome Pack - Final Rev BStatement7 Dec 2017View
Travel Welcome PackStatement4 Dec 2017View
Residential Travel Plan - Final Rev AStatement4 Dec 2017View
Email from Southern Water to AgentStatement16 Nov 2017View
Noise Condition LetterStatement16 Nov 2017View
Composite Condition Detail ListStatement16 Nov 2017View
Noise Assessment - JAE9392-REPT1-R5Statement16 Nov 2017View
Outline Condition LetterStatement16 Nov 2017View
Noise Assessment (Jan 2017) Ref: JAE9392-REPT1-R2Statement5 Sept 2017View
Caculation Sheet planStatement5 Sept 2017View
Mirco Drainage - SUDs calculationStatement5 Sept 2017View
Surface Water Management Statement (May 2017) Ref: 17071Statement5 Sept 2017View
Residential Travel plan ref: (Aug 2017) Ref: 170624/rebar2Statement5 Sept 2017View
Travel Welcome PackStatement5 Sept 2017View
Ecological Mitigation and enhancement plan dwg. JSL2477_871bStatement5 Sept 2017View
RESPONSE FROM SOUTHERN WATERConsultation1 Aug 2018View
EMAIL FROM ADC DRAINAGE ENGINEERSConsultation2 Jul 2018View
Southern Water. 18/5/18Consultation24 May 2018View
SOUTHERN WATERConsultation21 May 2018View
WSCC HighwaysConsultation20 Apr 2018View
ADC GreenspaceConsultation19 Apr 2018View
Greenspace (Condition 12)Consultation19 Apr 2018View
ADC GreenspaceConsultation18 Apr 2018View
EH RESPONCEConsultation11 Dec 2017View
Tree OfficerConsultation12 Oct 2017View
Engineers (Drainage)Consultation10 Oct 2017View
WSCC PLANNING SERVICES CONSULTATIONConsultation9 Oct 2017View
CDC EcologyConsultation27 Sept 2017View
Letter from Southern Water 17/5/18Planning Correspondence29 May 2018View
APPLICANT RESPONSE TO EHPlanning Correspondence11 Dec 2017View
Emails 1-6/12/17Planning Correspondence7 Dec 2017View
Emails 6/12/17-Condition 26Planning Correspondence7 Dec 2017View
Cover Email from Agent 6/12/17 with Revised Condition 26 Travel Plan & Welcome PackPlanning Correspondence7 Dec 2017View
Revised Condition 26 Travel Plan Cover Email and LetterPlanning Correspondence7 Dec 2017View
Condition 26 - Travel Plan Cover Email and LetterPlanning Correspondence4 Dec 2017View
EMAIL REGARDING CONDITION 21Planning Correspondence23 Nov 2017View
EMAIL AND LETTER REGARDING CONDITIONS 10, 12, 14 AND 15Planning Correspondence21 Nov 2017View
Agreed Extension of TimePlanning Correspondence17 Nov 2017View
Planning CorrespondencePlanning Correspondence16 Nov 2017View
Agreed Extension of TimePlanning Correspondence25 Oct 2017View
Planning CorrespondencePlanning Correspondence11 Sept 2017View
DOCACKSystems Correspondence8 Sept 2017View
PMAC71PSystems Correspondence5 Sept 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decided

    Published milestoneCouncil source

Decision & conditions

DOC Part Approved
Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.