Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Barnham, Eastergate, Westergate BEW Parcel SC1 Barnham
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceApplication for: (a) Detailed permission in respect of the construction of the Realigned A29 road; and (b) Outline permission with all matters reserved for the demolition of existing structures and mixed use development to provide up to 1,250 residential dwellings (Use Class C3), Care Home/Senior Living Accommodation (Use Class C2/C3), flexible retail and community floorspace (Use Classes E/F2/Sui Generis), a Primary School plus open space, landscaping, drainage and all other associated ancillary works, highways and associated infrastructure. This application also lies within the parish of Aldingbourne, affects the setting of listed buildings, affects the character & appearance of the Eastergate Church Lane Conservation Area and affects a Public Right of Way. This application is the subject of an Environmental Statement.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsBarnham, Eastergate, Westergate BEW Parcel SC1 Barnham
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationApplication | 21 Dec 2023 | View |
| PPA amended versionApplication | 8 Apr 2022 | View |
| CIL 1 FORMApplication | 10 Feb 2022 | View |
| COVER LETTERApplication | 10 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 HIGHWAY DRAINAGE LAYOUT SHEET 9 OF 10 A13394-PEF-ZZ-XX-DR-CD-0509 REVP8Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 COPOSITE DRAIANGE LAYOUT NORTH A13394-PEF-ZZ-XX-DR-CD-0511 REVP6Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 COMPOSITE DRAINAGE LAYOUT SOUTH A13394-PEF-ZZ-XX-DR-CD-0511 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX E COMPOSITE SURFACE WATER DRAINAGE PLANPlans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 COMPOSITE DRAINAGE LAYOUT SOUTH A13394-PEF-ZZ-XX-DR-CD-0511 REVP6Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 HIGHWAY DRAINAGE LAYOUT SHEET 3 OF 10 A13394-PEF-ZZ-XX-DR-CD-0503 REVP8Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13394-PF-ZZ-XX-DR-CD-00106 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENT STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 8 OF 10 A13394-PF-ZZ-XX-DR-CD-00107 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENT STATEMENT VOL 2 A29 EAST-WEST LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 8 OF 9 A13394-PF-ZZ-XX-DR-CD-00108 REVP03Plans | 15 Feb 2022 | View |
| ENVIRONMENT STATEMENT VOL 2 A29 BARNHAM STATION LINK ILLUSTRATIVE GENERAL ARRANGMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP03Plans | 15 Feb 2022 | View |
| ENVIRONMENT STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 1 OF 8 A13394-PF-ZZ-XX-DR-CD-00400 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENT STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 2 OF 8 A13394-PF-ZZ-XX-DR-CD-00401 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 3 OF 8 A13394-PF-ZZ-XX-DR-CD-00402 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 4 OF 8 A13394-PF-ZZ-XX-DR-CD-00403 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 5 OF 8 A13394-PF-ZZ-XX-DR-CD-00404 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 6 OF 8 A13394-PF-ZZ-XX-DR-CD-00405 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 7 OF 8 A13394-PF-ZZ-XX-DR-CD-00406 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHOWRKS AND CONSTRUCTION EXTENTS SHEET 8 OF 8 A13394-PF-ZZ-XX-DR- D-00407 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 MASTERPLAN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-0001 REVP05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENTS SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR-CD-00103 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00104 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 9 OF 26 MASTERPLAN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-0001 REV P05Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 10 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 11 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 12 OF 26 A29 LINK ROAD GENERAL ARRANBGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 13 OF 26 A26 LINK ROAD GENERAL ARRANGEMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR-CD-00103 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSSESSMENT 14 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00104 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 15 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 16 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13394-PF-ZZ-XX-DR-CD-00106 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 17 OF 26 A29 LINK ROAD GENERAL ARRANGEMENTS SHEET 8 OF 10 A13394-PF-ZZ-XX-DR-CD-00107 REVP06Plans | 15 Feb 2022 | View |
| ENVIRONMENT STATEMENT VOL 2 TRANSPORT ASSESSMENT 18 OF 26 A29 EAST-WEST LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 8 OF 9F A13394-PF-ZZ-XX-DR-CD-00108 REVP03Plans | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 19 OF 26 A29 BARNHAM STATION LINK ILLUSTRATIVE ARRANGEMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP03Plans | 15 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 3 A13394-PF-ZZ-XX-DR-CD-000115 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 4 A13394-PF-ZZ-XX-DR-CD-00116 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 5 A13394-PF-ZZ-XX-DR-CD-00117 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 6 A13394-PF-ZZ-XX-DR-CD-00118 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 7 A13394-PF-ZZ-XX-DR-CD-00119 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX PART 8 A13394-PF-ZZ-XX-DR-CD-00120 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 9 A13394-PF-ZZ-XX-DR-CD-00121 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 10 A13394-PF-ZZ-XX-DR-CD-00122 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 11 A13394-PF-ZZ-XX-DR-CD-00123 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 12 A13394-PF-ZZ-XX-DR-CD-00124 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL ASSESSMENT APPENDIX C PART 13 A13394-PF-ZZ-XX-DR-CD-00125 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 1 A13394-PF-ZZ-XX-DR-CD-00100 P003Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 2 A13394-PF-ZZ-XX-DR- D-00101 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 3 A13394-PF-ZZ-XX-DR-CD-00102 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 4 A13394-PF-ZZ-XX-DR- D-00103 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 5 A13394-PF-ZZ-XX-DR-CD-00104 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 6 A13394-PF-ZZ-XX-DR-CD-00105 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 7 A13394-PF-ZZ-XX-DR-CD-00106 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 8 A13394-PF-ZZ-XX-DR-CD-00107 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 9 A13394-PF-ZZ-XX-DR-CD-00108 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 10 A13394-PF-ZZ-XX-DR-CD-00109 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 11 A13394-PF-ZZ-XX-DR-CD-00110 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX B PART 12 A13394-PF-ZZ-XX-DR-CD-00111 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APENDIX B PART 13 A13394-PF-ZZ-XX-DR-CD-00012 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 1 A13394-PF-ZZ-XX-DR-CD-00113 P03Plans | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX C PART 2 A13394-PF-ZZ-XX-DR-CD-00114 P03Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00108 P03Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00500 TO 00505-DESIGN AUDITPlans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 0501 TO 0507-HIGHWAY DRAINAGEPlans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 0508-0510 HIGHWAY DRAINAGEPlans | 14 Feb 2022 | View |
| DESING SUMMARY DOCUMENT APPENDIX A DWG CD-00001 P05Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX C A13394-SK030 REVC A29 GEOMETY DESIGNPlans | 14 Feb 2022 | View |
| MINERAL ASSESSMENT APPENDIX A DEVELOPMENT DRAWINGS ILLUSTRATIVE MASTERPLANPlans | 14 Feb 2022 | View |
| MINERAL ASSESSMENT APPENDIX D SAND AND GRAVEL MAPPlans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APP D 13394-PEF-ZZ-XX-M2-S-000003Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APP D PROPOSED BRIDGE FEP GA2PA W10 140122Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A A29 FULL LAYOUT REVDPlans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG-00100 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00101 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00102 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00103 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00104 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00105 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00106 P06Plans | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00107 P06Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX N1 CUMULATIVE SCHEMES PLANPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX A1 SITE LOCATION PLANPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C4 DEMOLITION PLANPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C2 FRAMEWORK MASTERPLANPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F3 FIGURE F2.2: ECOLOGICAL FEATURES (SOUTH)Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F4 FIGURE F3: PROTECTED SPECIESPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F5 FIGURE F4:GREAT CRESTED NEWT POND SURVEY PLANPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F1 FIGURE F1: APPLICATION SITE LOCATION AND ECOLOGICAL DESIGNATIONSPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F2 FIGURE F2.1: ECOLOGICAL FEATURES (NORTH)Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLAN PARAMETER PLAN BUILDING HEIGHTS 00605_B PP03 REVP1Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS PARAMETER OPLAN LANDSCAPE AND GREEN INFRASTRUCTURE 00605_B PP04 REVP1Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS PARAMETER PLAN DEVELOPMENT AREAS CHARACTER PLAN 00605_B PP05 REVP1Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS PARAMETER PLAN ACCESS AND MOVEMENT 00605_B PP07 REVP1Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS APPENDIX C1 SCHEME PLANS (PARAMETER PLANS AND DETAILED ACCESS DRAWINGS)Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00600 REVP03Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00601 REVP03Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00602 REVP03Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C5 LIGHTING ASSESSMENTPlans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 2 OF 8Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 3 OF 8Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 4 OF 8Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 5 OF 8Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 6 OF 8Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 7 OF 8Plans | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 8 OF 8Plans | 14 Feb 2022 | View |
| DEMOLITION PLAN 00605B_ S05 REVP1Plans | 11 Feb 2022 | View |
| ILLUSTRATIVE MASTERPLAN 00605B_S_06 REVP1Plans | 11 Feb 2022 | View |
| A29 LINKROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00600 REVP03Plans | 11 Feb 2022 | View |
| A29 LINK ROAD STREET LIGHTING AND LIGHTING COUNTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00601 REVP03Plans | 11 Feb 2022 | View |
| A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00602 REVP03Plans | 11 Feb 2022 | View |
| ILLUSTATIVE MASTERPLAN 00605B_S_06 REVP1Plans | 10 Feb 2022 | View |
| LOCATION PLAN 00605B_S07 REVP1Plans | 10 Feb 2022 | View |
| DEMOLITION PLAN 00605B_ SO5 REVP1Plans | 10 Feb 2022 | View |
| ES APPENDIX 1 LOCATION PLAN 00605B_S07 REVP2Substitute Plan | 21 Dec 2023 | View |
| ES APPENDIX 3 PARAMETER PLAN LANDSCAPE AND GREEN INFRASTRUCTURE 00605B_PP04 REVP2Substitute Plan | 21 Dec 2023 | View |
| ES APPENDIX 3 PARAMETER PLAN BUILDING HEIGHTS 00605B_PP03 REVP2Substitute Plan | 21 Dec 2023 | View |
| ES APPENDIX 3 PARAMETER PLAN LAND USE 00605B_PP01 REVP2Substitute Plan | 21 Dec 2023 | View |
| ES APPENDIX 3 PARAMETER PLAN ACCESS AND MOVEMENT 00605B_PP07 REVP3Substitute Plan | 21 Dec 2023 | View |
| ES APPENDIX 3 PARAMETER PLAN DEVELOPMENT AREA CHARACTER PLAN 00605B_PP05 REVP2Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 4 OF 8 D2898 FAB 00 XX DR L 1004 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 5 OF 8 D2898 FAB 00 XX DR L 1005 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 6 OF 8 D2898 FAB 00 XX DR L 1006 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 7 OF 8 D2898 FAB 00 XX0DR L 1007 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 8 OF 8 D2898 FAB 00 XX0DR L 1008 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE LEGEND AND SPECIFICATION D2898 FAB 00 XX DR L 1000 REVPL02Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENEREAL ARRANGEMENT SHEET 1 OF 8 D2898 FAB 00 XX DR L 1001 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 2 OF 8 D2898 FAB 00 XX DR L 1002 REVPL03Substitute Plan | 21 Dec 2023 | View |
| SOFT LANDSC APE GENERAL ARRANGEMENT PLAN SHEET 3 OF 8 D2898 FAB 00 XX DR L 1003 REVPL03Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 6 OF 8 A13394-PF-ZZ-XX-DR-CD-00405 REVP08Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 7 OF 8 A13394-PZ-XX-DR-CD-00406 REVP08Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 8 OF 8 A13394-PF-ZZ-XX-DR-CD-00407 REVP08Substitute Plan | 21 Dec 2023 | View |
| A298 LINK ROAD GENERAL ARRANGMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR-CD-00103 REVP09Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00104 REVP09Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 6 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP09Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13397-PF-ZZ-XX-DR-CD-00106 REVP09Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 8 OF 10 A13394-PF-ZZ-XX-DR-CD-00107 REVP10Substitute Plan | 21 Dec 2023 | View |
| A29 EAST WEST ;OML O;;ISTRATOVE GEMERAL ARRANGEMENT SHEET 8 OF 9 A13394-PF-ZZ-XX-DR-CD-00108 REV[06Substitute Plan | 21 Dec 2023 | View |
| A29 BARNHAM STATION LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP06Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 1 OF 8 A13394-PF-ZZ-XX-DR-CD-00400 REVP04Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 2 OF 8 A13394-PF-ZZ-XX-DR-CD-00401 REVP08Substitute Plan | 21 Dec 2023 | View |
| A/29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 3 OF 8 A13394-PF-ZZ-XX-DR-CD-00402 REVP08Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 4 OF 8 A13394-PF-ZZ-XX-DR-CD-00403 REVP08Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 5 OF 8 A13394-PF-ZZ-XX-DR-CD-00404 REVP08Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP10Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP09Substitute Plan | 21 Dec 2023 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP09Substitute Plan | 21 Dec 2023 | View |
| MASTERPOALN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-00001 REVP09Substitute Plan | 21 Dec 2023 | View |
| Environmental statement vol 2 sustainable drainage reportStatement | 3 Dec 2024 | View |
| Covering letter RE: submission of updated drainage report - 8/5/24Statement | 24 May 2024 | View |
| COVER LETTERStatement | 21 Dec 2023 | View |
| PLANNING APPLICATION SUMMARY DOCUMENTStatement | 6 Apr 2022 | View |
| PPAStatement | 21 Feb 2022 | View |
| PPAStatement | 21 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX D1 TRANSPORT ASSESSMENT (TA)Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMETN PART 3 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 4 OF 26Statement | 15 Feb 2022 | View |
| ENFIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 2 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL2 TRANSPORT ASSESSMENT PART 5 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 6 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 7 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 8 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 20 OF 26 JUNCTION TURNING FLOWS, UNITS@VEHICLES DEMAND FLOWSStatement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSEMENT PART 21 OF 26 TURNING FLOWS, UNITS: VEHICLES DEMAND FLOWSStatement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 22 OF 26Statement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATMENT VOL 2 TRANSPORT ASSESSEMTN PART 23 OF 26 JUNCTIONSStatement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANPSORT ASESSMENT PART 24 OF 26 JUNCTIONSStatement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 25 OF 26 JUNCTIONSStatement | 15 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 26 OF 26 JUNCTIONSStatement | 15 Feb 2022 | View |
| APPENDIX A3 ENVIROCHECK DATASHEETS AND HISTORIC MAPS A13394-PF-C-ZZ-XX-RPT-0002 R001Statement | 14 Feb 2022 | View |
| APPENDIX A3 ENVIROCHECK DATASHEETS AND HISTORIC MAPS A13394-PF-C-ZZ-XX-RPT-0002 R001Statement | 14 Feb 2022 | View |
| PHASE 1 LAND CONTAMINATION DESK STUDY JANUARY 2022 A13394-PF-C-ZZ-XX-RPT-0002Statement | 14 Feb 2022 | View |
| MINERALS RESOURCE ASSESSMENT JANUARY 2022Statement | 14 Feb 2022 | View |
| A29 DESIGN STATEMENTStatement | 14 Feb 2022 | View |
| APPENDIX A1 ENVIROCHECK DATASHEETS AND HISTORIUC MAPS A13394-PF-C-ZZ-XX-RPT-00012 R001Statement | 14 Feb 2022 | View |
| APPENDIX A2 ENVIROCHECK DATASHEETS AND HISTORIC MAPS A13394-PF-C-ZZ-XX-RPT-0002 R0001Statement | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY APPENDIX A TREE SURVEY SCHEDULE BARNHAM BS5837Statement | 14 Feb 2022 | View |
| STATEMENT OF COMMUINITY INVOLVEMENT JANUARY 2022 PART 1Statement | 14 Feb 2022 | View |
| STATEMENT OF COMMUNITY INVOLVEMENT PART 2Statement | 14 Feb 2022 | View |
| PLANNING STATEMENT JANUARY 2022Statement | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX B A29 REALIGNMENT PHASE 1 BEW DELIVERY MEETING 13.02.20Statement | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX E WSCC QUESTIONS 290721-FINALStatement | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX E WSCC QUESTIONS DATED 090321 FP RESPONSES DOCUMENT 040521Statement | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APPENDIX F A13394-TN101-PEDESTRIAN CROSSING ASSESSMENTStatement | 14 Feb 2022 | View |
| MINERAL ASSESSMENT APPENDIX B WYG G1Statement | 14 Feb 2022 | View |
| MINERAL ASSESSMENT APPENDIX C HISTORIC GIStatement | 14 Feb 2022 | View |
| ARBORICULTURAL SURVEY REPORT JANUARY 2022Statement | 14 Feb 2022 | View |
| SUSTAINABILITY AND ENERGY STRATEGY JANUARY 2022Statement | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APP D LID RIFE BRIDGE OPT TECH NOTEStatement | 14 Feb 2022 | View |
| DESIGN SUMMARY DOCUMENT APP 2-000001-OVERBRIDGE OPTIONS REPORTStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER I : BUILT HERITAGE JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER J: ARCHAEOLOGY JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER K:WATER ENVIRONMENT AND DRAINAGE JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER L: SOCIO-ECONOMICS JANAURY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER : CLIMATE CHANGE AN DRESILLIENCE JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER N: CUMULATIVE ASSESSMENT JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER O: MITIGATION AND MONITORING JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEHCNICAL ASSESSMENTS TABLE OF CONTENTS JANAURY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER A: INTRODUCTION AND BACKGROUNDStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER B: SCOPE AND METHODOLOGY JANAURY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER C: SITE AND SCHEME DESCRIPTION JANAURY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER D: TRANSPORTATION JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER E: LANDSCAPE ADN VISUAL IMPACT ASSESSMENT JANAURY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER F: ECOLOGYStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER G: AIR QUALITY JANUARY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 1 CHAPTER H: NOISE AND VIBRATION JANAURY 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX K3 HEWRAT ANALYSISStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOLUME 2 TECHNICAL FIGURES AND APPENDICES TABLE OF CONTENTS JANUAR 2022Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B1 EIA SCOPING REPORTStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B2 EIA SCOPING OPINIONStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B3 CUMULATIVE ASSESSMENT BRIEFING NOTEStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B4 SCOPING CORRESPONDENCE FOLLOWING SCHEME DESIGN ITERATIONSStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX A2 DEVELOPER STATEMENT OF COMPETENCYStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C3 OUTLINE CEMPStatement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX D2 FRAMEWORK TRAVEL PLAN (ftp)Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT APPENDIX G1-7, CONSTRUCTION DUST ASSESSMENT PROCEDURE (G1), EPUK & IAQM PLANNIG FOR AIR QUALITY GUIDANCE (G2), PROFESSIONAL EXPERIENCES (G3), MODELLING METHODOLOGY (G4), RECEPTOR LOCATIONS (G5), EMISSIONS MITIGATION STATEMENT (G6), EMAIL CONSULTATION WITH ARUN DISTRICT COUNCIL (G7)Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX H1-5 NOISE GLOSSARY (H1), GRAPHS OF BASELINE SURVEY RESULTS (H2), CONSTRUCTION NOISE PLANT LISTS (H3), TRAFFIC NOISE ASSESSMENT (H4), NOISE CHAPTER FIGURES (H5)Statement | 14 Feb 2022 | View |
| ENVORNMENTAL STATEMENT VOL 2 APPENDIX E1-4 LVIA METHODOLOGY (E1), PLANS AND PHOTOS (E2), VERIFIED VISUAL MONTAGES (E3), A3 PHOTOS (E4) PART 1 OF 8Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX /1 AN ARCHAEOLOGICAL DESK BASED ASSESSMENT ('DBA')Statement | 14 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOL 2 APPENDIX A2 DESK BASED ARCHAEOLOGICAL ASSESSMENT PART 2 OF 2Statement | 14 Feb 2022 | View |
| PHOTOS BEW PARCEL SC1 EXISTING ELEVATIONS BEW-001Statement | 11 Feb 2022 | View |
| ES VOLUME 1 ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JANUARY 2022 UPDATED DECEMBER 2023Substitute Document | 21 Dec 2023 | View |
| LANDSCAPE STRATEGY D2898 FAB-00-XX-RP-L-0001 REVPL08Substitute Document | 21 Dec 2023 | View |
| DAS PART 6Substitute Document | 21 Dec 2023 | View |
| DAS PART 7Substitute Document | 21 Dec 2023 | View |
| DAS PART 8Substitute Document | 21 Dec 2023 | View |
| DAS PART 9Substitute Document | 21 Dec 2023 | View |
| DAS PART 10Substitute Document | 21 Dec 2023 | View |
| DAS PART 1Substitute Document | 21 Dec 2023 | View |
| DAS PART 2Substitute Document | 21 Dec 2023 | View |
| DAS PART 3Substitute Document | 21 Dec 2023 | View |
| DAS PART 4Substitute Document | 21 Dec 2023 | View |
| DAS PART 5Substitute Document | 21 Dec 2023 | View |
| DESIGN PRINCIPLES PART 2Substitute Document | 21 Dec 2023 | View |
| DESIGN PRINCIPLES PART 3Substitute Document | 21 Dec 2023 | View |
| DESIGN PRINCIPLES PART 4Substitute Document | 21 Dec 2023 | View |
| DESIGN PRINCIPLES PART 1Substitute Document | 21 Dec 2023 | View |
| FLOOD RISK ASSESSMENTSubstitute Document | 21 Dec 2023 | View |
| Emails from Chichester DC Archaeology Officer & SLR 02.04.2026Additional Docs | 9 Apr 2026 | View |
| Proposed Mitigation Areas Overlying the Trench Plan Figure 1 (Archaeology) March 2026Additional Docs | 9 Apr 2026 | View |
| BS appendix 5 response to clarification to EA comments in full bognor Road rouad roundabout systra mitigation scheme A13494/VAA-PEF-XX-XX-TN-TR-000051 REV F01 FINALAdditional Docs | 3 Dec 2024 | View |
| Response to the comments made by WSCC 26/4/24Additional Docs | 24 May 2024 | View |
| FORM 1 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs | 9 Jan 2024 | View |
| FORM 3 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs | 9 Jan 2024 | View |
| FORM 4 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs | 9 Jan 2024 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FOR 6 A13394-PF-ZZ-SK-DR-CD-01004 REVP01Additional Docs | 9 Jan 2024 | View |
| A29 LINK ROAD A29-11 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-XX-DR-CD-00703 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 8 Jan 2024 | View |
| COVERING LETTERAdditional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY PLANNING STATEMENT 21 DECEMBER 2023Additional Docs | 21 Dec 2023 | View |
| ES VOLUME 1 ENVIRONMENTAL STATEMENT ADDENDUM DECEMBER 2023Additional Docs | 21 Dec 2023 | View |
| ICM MODELLING LOGAdditional Docs | 21 Dec 2023 | View |
| ES APPENDIX 5 RESPONSE TO CLARIFICATION TO EA COMMENTS IN FULL ICM MODEL SUMMARY REVP02Additional Docs | 21 Dec 2023 | View |
| NON REAL TIME HYDRAULIC MODEL REVIEW TEMPLATE LIT 17611 VERSION 6.0Additional Docs | 21 Dec 2023 | View |
| RESPONSE TO EA HOLDING OBJECTION IN RELATION TO FLOOD RISK ISSUES 100148-PEF-ZZ-XX-RP-YE-000400Additional Docs | 21 Dec 2023 | View |
| ES APPENDIX 5 RESPONSE TO CLARIFICATION TO EA COMMENTS IN FULL WHYKE ROAD ROUNDABOUT A27 (W) QUEUE A13394/VAA-PEF-XX-XX-TN-TR-000051 REVF01 FINALAdditional Docs | 21 Dec 2023 | View |
| ES APPENDIX 5 RESPONSE TO CLARIFICATION TO EA COMMENTS IN FULL NATIONAL HIGHWAYS RESPONSE 20-04-22Additional Docs | 21 Dec 2023 | View |
| RESPONSE TO NATIONAL HIGHWAYS COMMENTS 14/04/22 REVF2Additional Docs | 21 Dec 2023 | View |
| RESPONSE TO NATIONAL HIGHWAYS COMMENTS A13394/VA-PEF-XX-XX-TN-TR-000021Additional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-13 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-XX-DR-CD-00704 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HANBURY LINK ROAD LIDSEY ROAD ROUNDABOUT TRACKING A13394-PF-ZZ-XX-DR-CD-00705 REVP02 SUPPORTING DOUCMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| PROPOSED TRO CHANGES ON EXISTING LISDEY ROAD AS PART OF NEW A29 ALIGNMENT A13394-SK035 REVP03 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| SOUTHERN WATER ACCESS SWEPT PATH ANALYSIS A13394-SK036 REVP1 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| EXISTING A29 VISIBILITY SPLAYS A13394-SK043 REVP1 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-4 ROUNDABOUT SWEPT PATH ANALYSIS A13394-FP-ZZ-XX-DR-CD-00700 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-5 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-DR-CD-00701 REVP02 SUPPORTING DOUCMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-9 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-XX-DR-CD-00702 REVP2 SUPPORTING DOCUMENT ONLYH NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-9 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00502 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-11 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00503 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALOAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-13 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00504 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-14 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00505 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-4 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00500 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 LINK ROAD A29-5 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00501 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 4 OF 10 A13394-PEF-ZZ-XX-DR- D-0504 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 5 OF 10 A13394-PEF-ZZ-XX-DR-CD-0505 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 6 OF 10 A13394-PEF-ZZ-XX-DR-CD-0506 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 7 OF 10 A13394-PEF-ZZ-XX-DR-CD-0507 REVP10 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE SHEET 8 OF 10 A13394-PEF-ZZ-XX-DR-CD-0508 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| A29 FULL LAYOUT SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 1 OF 10 A13394-PEF-ZZ-XX-DR-CD-0501 REVP11 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 2 OF 10 A13394-PEF-ZZ-XX-DR-CD-0502 REVP10 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 3 OF 10 A13394-PEF-ZZ-XX-DR-CD-0503 REV10 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| GENERAL ARRANGEMENT SINGLE SPAN BRIDGE 13394-PEF-ZZ-XX-M2-S-000001 REVP08 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| INITIAL BRIDGE OPTIONS 30M SINGLE SPAN FRAME ABUTMENT 13394-PEF-ZZ-XX-M2-S-000003 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| LIDSEY FARM/EXISTING MANOEUVRES SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00006 REVP02 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| BEW DEVELOPMENT MASTERPLAN RAILWAY CROSSING REVEIW A13394-PF-ZZ-SK-DR-CD-00007 REVP01 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| MAIN A29 ROUTE JUNCTION ACCESS SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00008 REVP01 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 9 OF 10 A13394-PEF-ZZ-XX-DR-CD-0509 REVP11 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HIGHWAY DRAINAGE LAYOUT SHEET 10 OF 10 A13394-PEF-ZZ-XX-DR-CD-0510 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| LISDEY FARM/LIDSEY CARAVAN PARK SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00004 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| HANBURY LINK EXISTING LANDFILL AND SUMMER BARN SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00005 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| SWEPT PATH ANALYSIS REFUSE VEHICLE A13394-PF-ZZ-TR-DR-CD-00001 REVP00 SUPPORTING DOUCMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| SWEPT PATH ANALYSIS REFUSE VEHICLES A13394-PF-ZZ-TR-DR-CD-00002 REVP00 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs | 21 Dec 2023 | View |
| ES APENDIX 2 UPDATED HIGHWAY DRAWINGS ROAD SAFETY AUDIT DECISION LOG COVER SHEETAdditional Docs | 21 Dec 2023 | View |
| APPENDIX 4 RESPONSE TO CLARIFICATIUONS TO WSCC HIGHWAYS ADN NH COMMENTS IN FULL FORMAL RECOMMENDATION TO AN APPLICATION FOR PLANNING PERMISSIONAdditional Docs | 21 Dec 2023 | View |
| APPENDIX 4 RESPONSES TO CLARIFICATIONS TO WSCC HIGHWAYS AND NH COMMENTS IN FULLAdditional Docs | 21 Dec 2023 | View |
| APPENDIX 4 RESPONSE TO CLARIFICATION TO WSCC HIGHWAY AND NH COMMENTS IN FULL A13394/VAA-PEF-XX-XX-TN-TR-000022 REVF01 FINALAdditional Docs | 21 Dec 2023 | View |
| ROAD SAFETY AUDIT DECISION LOG COVER SHEET 040923Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 4 A13394-PF-ZZ-SK-DR-CD-01003 REVP00Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 6 A13394-PF-ZZ-SK-DR-CD-01004 REVP01Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 5 A13394-PF-ZZ-SK-DR-CD-01005 REVP00Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 7 A13394-PF-ZZ-SK-DR-CD-01006 REVP00Additional Docs | 21 Dec 2023 | View |
| FORM 3 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs | 21 Dec 2023 | View |
| SUPPLEMANTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 1 A13394-PF-ZZ-SK-DR-CD-01000 REVP00Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 2 A13394-PF-ZZ-SK-DR-CD-01001 REVP01Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 7 A13394-PF-ZZ-SK-DR-CD-01006 REVP00Additional Docs | 21 Dec 2023 | View |
| FORM 2 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs | 21 Dec 2023 | View |
| FORM 5 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs | 21 Dec 2023 | View |
| FORM 6 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV-Additional Docs | 21 Dec 2023 | View |
| FORM 7 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV-Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 1 A13394-PF-ZZ-SK-DR-CD-01000 REVP00Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 2 A13394-PF-ZZ-SK-DR-CD-01001 REVP01Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 3 A13394-PF-ZZ-SK-DR-CD-01002 REVP00Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FOR 4 A13394-PF-ZZ-DK-DR-CD-01003 REVP00Additional Docs | 21 Dec 2023 | View |
| SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 5 A13394-PF-ZZ-SK-DR-CD-01005 REVP00Additional Docs | 21 Dec 2023 | View |
| NR CERTIFICATE OF APPROVAL FOR STAGE 1 (BUSINESS) CLEARANCE (COMMERCIAL) FOR INFORMATION ONLYAdditional Docs | 21 Dec 2023 | View |
| NR CERTIFICATE OF APPROVAL FOR STAGE 1 (BUSINESS) CLEARANCE (COMMERCIAL) FOR INFORMATION ONLYAdditional Docs | 21 Dec 2023 | View |
| Financial Viability AssessmentAdditional Docs | 15 Feb 2023 | View |
| Framework Travel Plan 8/11/2022Additional Docs | 9 Nov 2022 | View |
| Response to EA comments 05/10/2022Additional Docs | 21 Oct 2022 | View |
| Agent response to WSCC Highwaysfinal 03/08/2022Additional Docs | 21 Oct 2022 | View |
| Agent response to WSCC Highways comments round 2 24/06/2022Additional Docs | 21 Oct 2022 | View |
| Agent response to WSCCC Highways comments round 1 17/0/2022Additional Docs | 21 Oct 2022 | View |
| Note from Highways 20/10/2022Additional Docs | 21 Oct 2022 | View |
| Response to Consultation Comments 15.07.22Additional Docs | 18 Jul 2022 | View |
| WSCC Flood Risk Management TeamConsultation | 3 Jul 2024 | View |
| WSCC Surface Water Drainage responseConsultation | 20 Jun 2024 | View |
| WSCC Education responseConsultation | 31 May 2024 | View |
| WSCC - Highway AuthorityConsultation | 17 Apr 2024 | View |
| WSCC Lead Local Flood AuthorityConsultation | 27 Feb 2024 | View |
| Aldingbourne Parish Council ResponseConsultation | 22 Feb 2024 | View |
| PLCOMACKPCConsultation | 19 Feb 2024 | View |
| Environment agency responseConsultation | 16 Feb 2024 | View |
| Ecology responseConsultation | 14 Feb 2024 | View |
| WSCC Highways - Public Rights of WayConsultation | 13 Feb 2024 | View |
| Walberton Parish Council responseConsultation | 9 Feb 2024 | View |
| Southern WaterConsultation | 31 Jan 2024 | View |
| MWPA responseConsultation | 30 Jan 2024 | View |
| National Highways responseConsultation | 30 Jan 2024 | View |
| BARNHAM AND EASTERGATE PARISH COUNCIL RESPONSEConsultation | 24 Jan 2024 | View |
| Police designing out Crime responseConsultation | 11 Jan 2024 | View |
| National Highways responseConsultation | 5 Oct 2023 | View |
| Environment Agency responseConsultation | 21 Jul 2023 | View |
| National Highways additional commentsConsultation | 7 Jul 2023 | View |
| WSCC revised s106 consultation responseConsultation | 26 Jun 2023 | View |
| Network Rail Supplementary responseConsultation | 19 Apr 2023 | View |
| National Highways responseConsultation | 11 Apr 2023 | View |
| PLCOMACKPCConsultation | 7 Mar 2023 | View |
| NHS SussexConsultation | 5 Jan 2023 | View |
| National Highways responseConsultation | 19 Dec 2022 | View |
| NHS Coastal West Sussex ResposneConsultation | 14 Dec 2022 | View |
| NHS Coastal West Sussex Commissioning Group responseConsultation | 12 Dec 2022 | View |
| Environment Agency ResponseConsultation | 29 Nov 2022 | View |
| WSCC SECTION 106 CONSULTATION RESPONSEConsultation | 25 Nov 2022 | View |
| Southern Water ResponseConsultation | 3 Oct 2022 | View |
| WSCC S106 ResponseConsultation | 23 Sept 2022 | View |
| Ecology Advisor Consultation ResponseConsultation | 31 Aug 2022 | View |
| WSCC - Highways Authority responseConsultation | 20 Jul 2022 | View |
| WSCC - EducationConsultation | 14 Jul 2022 | View |
| National Highways - updated consultee responseConsultation | 13 Jul 2022 | View |
| WSCC - Highways AuthorityConsultation | 24 Jun 2022 | View |
| WSCC - Lead Local Flood AuthorityConsultation | 31 May 2022 | View |
| Network Rail Consultation ResponseConsultation | 18 May 2022 | View |
| WSCC - Highway Authority 2nd ResponseConsultation | 12 May 2022 | View |
| National HighwaysConsultation | 20 Apr 2022 | View |
| Sport England 11/4/22Consultation | 13 Apr 2022 | View |
| Interim response from Sport EnglandConsultation | 13 Apr 2022 | View |
| Sport England interim response 16/2/22Consultation | 12 Apr 2022 | View |
| Natural England 14/3/22Consultation | 12 Apr 2022 | View |
| WSCC- Highways 7/4/22Consultation | 12 Apr 2022 | View |
| Aldingbourne Parish CouncilConsultation | 30 Mar 2022 | View |
| PLCOMACKPCConsultation | 29 Mar 2022 | View |
| WSCC S106 consultation responseConsultation | 29 Mar 2022 | View |
| National Highways responseConsultation | 29 Mar 2022 | View |
| Environment Agency responseConsultation | 29 Mar 2022 | View |
| Walberton Parish CouncilConsultation | 28 Mar 2022 | View |
| Drainage engineers responseConsultation | 24 Mar 2022 | View |
| West Sussex Fire & Rescue ServiceConsultation | 24 Mar 2022 | View |
| WSCC Mineral & Waste planning responseConsultation | 23 Mar 2022 | View |
| BEPC ResponseConsultation | 22 Mar 2022 | View |
| Arun District Council GreenspaceConsultation | 21 Mar 2022 | View |
| Archaeology Advisor 16/3/22Consultation | 17 Mar 2022 | View |
| WSCC - EducationConsultation | 7 Mar 2022 | View |
| WSCC Highways - Public Rights of WayConsultation | 4 Mar 2022 | View |
| Environmental HealthConsultation | 2 Mar 2022 | View |
| Natural EnglandConsultation | 2 Mar 2022 | View |
| CDC EcologyConsultation | 28 Feb 2022 | View |
| Sussex Police 16/2/22Consultation | 16 Feb 2022 | View |
| Rep LettersRep Letters | 1 Aug 2025 | View |
| Rep LettersRep Letters | 1 Aug 2025 | View |
| PLCOMACKRep Letters | 17 Jun 2024 | View |
| PLCOMACKRep Letters | 2 Apr 2024 | View |
| PLCOMACKRep Letters | 4 Mar 2024 | View |
| PLCOMACKRep Letters | 27 Feb 2024 | View |
| PLCOMACKRep Letters | 21 Feb 2024 | View |
| PLCOMACKRep Letters | 20 Feb 2024 | View |
| PLCOMACKRep Letters | 13 Feb 2024 | View |
| Rep LettersRep Letters | 13 Feb 2024 | View |
| PLCOMACKRep Letters | 2 Feb 2024 | View |
| PLCOMACKRep Letters | 17 Jan 2024 | View |
| PLCOMACKRep Letters | 17 Jan 2024 | View |
| PLCOMACKRep Letters | 10 Jan 2024 | View |
| Rep LettersRep Letters | 15 May 2023 | View |
| PLCOMACKRep Letters | 7 Mar 2023 | View |
| PLCOMACKRep Letters | 8 Feb 2023 | View |
| PLCOMACKRep Letters | 24 Jan 2023 | View |
| PLCOMACKRep Letters | 12 Dec 2022 | View |
| PLCOMACKRep Letters | 19 Oct 2022 | View |
| PLCOMACKRep Letters | 8 Aug 2022 | View |
| PLCOMACKRep Letters | 30 May 2022 | View |
| PLCOMACKRep Letters | 6 May 2022 | View |
| Rep LettersRep Letters | 6 Apr 2022 | View |
| PLCOMACKRep Letters | 5 Apr 2022 | View |
| PLCOMACKRep Letters | 4 Apr 2022 | View |
| Rep LettersRep Letters | 31 Mar 2022 | View |
| PLCOMACKRep Letters | 29 Mar 2022 | View |
| Rep LettersRep Letters | 22 Mar 2022 | View |
| Rep LettersRep Letters | 22 Mar 2022 | View |
| PLCOMACKRep Letters | 18 Mar 2022 | View |
| PLCOMACKRep Letters | 18 Mar 2022 | View |
| Bognor Regis Town CouncilRep Letters | 16 Mar 2022 | View |
| PLCOMACKRep Letters | 9 Mar 2022 | View |
| PLCOMACKRep Letters | 4 Mar 2022 | View |
| PLCOMACKRep Letters | 25 Feb 2022 | View |
| Cover email RE additional uploads 24/5/24Planning Correspondence | 24 May 2024 | View |
| Amendment to PPA to 22/03/23Planning Correspondence | 29 Jan 2024 | View |
| Amended PPA to 31 March 2024Planning Correspondence | 29 Jan 2024 | View |
| Amendment to PPA 11/03/22Planning Correspondence | 29 Jan 2024 | View |
| Signed agreeement page March 2022Planning Correspondence | 29 Jan 2024 | View |
| Planning Performance Agreement August 2020Planning Correspondence | 29 Jan 2024 | View |
| Email with WSCC 25/04/2023Planning Correspondence | 26 Apr 2023 | View |
| Email with additional FTP 08/11/2022Planning Correspondence | 9 Nov 2022 | View |
| Email with applicant response to EA comments 20/10/2022Planning Correspondence | 21 Oct 2022 | View |
| Systems CorrespondenceSystems Correspondence | 8 Jul 2025 | View |
| PLACKSystems Correspondence | 17 Feb 2022 | View |
| DAS PART 3Superseded Document | 14 Feb 2022 | View |
| DAS PART 4Superseded Document | 14 Feb 2022 | View |
| DAS PART 5Superseded Document | 14 Feb 2022 | View |
| DAS PART 6Superseded Document | 14 Feb 2022 | View |
| DAS PART 7Superseded Document | 14 Feb 2022 | View |
| DAS PART 1Superseded Document | 14 Feb 2022 | View |
| DAS PART 2Superseded Document | 14 Feb 2022 | View |
| DESIGN PRINCIPLES DOCUMENT JANUARY 2022 PART 1Superseded Document | 14 Feb 2022 | View |
| DESIGN PRINCIPLES PART 2Superseded Document | 14 Feb 2022 | View |
| LANDSCAPE STRATEGY JANUARY 2021 PART 1Superseded Document | 14 Feb 2022 | View |
| LANDSCAPE STRATEGY PART 2Superseded Document | 14 Feb 2022 | View |
| PARAMETER PLAN LANDSCAPE AND GREEN INFRASTRUCTURE 00606B_ PP04 REVP1Superseded Document | 11 Feb 2022 | View |
| PARAMETER PLAN BUILDING HEIGHTS 00605B_ PP03 REVP1Superseded Document | 11 Feb 2022 | View |
| PARAMETER PLAN LAND USE 00605B_ PP01 REVP1Superseded Document | 11 Feb 2022 | View |
| LOCATION PLAN 00605B_S07 REVP1Superseded Document | 11 Feb 2022 | View |
| PARAMETER PLAN ACCESS AND MOVEMENT 00605B_PP07 REVP1Superseded Document | 11 Feb 2022 | View |
| PARAMETER PLAN DEVELPMENT AREAS CHARACTER PLAN 00605B_PP05 REVP1Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 2 OF 8 1002 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 3 OF 8 1003 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 4 OF 8 1004 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 5 OF 8 1005 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 6 OF 8 1006 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 7 OF 8 1007 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 8 OF 8 1007 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE LEGEND AND SPECIFICATION 1000 REVPL01Superseded Document | 11 Feb 2022 | View |
| SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 1 OF 8 1001 REVPL01Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR- D-00103 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR- D-00104 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13393-PF-ZZ-XX-DR-CD-00106 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD GENERAL ARRANGEMENT SHEET 8 OF 10 A13393-PF-ZZ-XX-DR-CD-00107 REVP06Superseded Document | 11 Feb 2022 | View |
| A29 EAST-WEST LINK ILLUSTRATIVE GENERAL ARRABGENEBT SHEET 8 OF 9 A13394-PF-ZZ-XX-DR- CD-00108 REVP03Superseded Document | 11 Feb 2022 | View |
| A29 BARNHAM STATION LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP03Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 1 OF 8 A13394-PF-ZZ-XX-DR-CD-00400 REVP05Superseded Document | 11 Feb 2022 | View |
| MASTERPLAN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-0001 REVP05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 5 OF 8 A13394-PF-ZZ-XX-DR-CD-00404 REVP05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 6 OF 8 A13394-PF-ZZ-XX-DR-CD-00405 REVP05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 7 OF 8 A13394-PF-ZZ-XX-DR-CD-00406 REVP05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 8 OF 8 A13394-PF-ZZ-XX-DR-CD-00407-P05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 2 OF 8 A13394-PF-ZZ-XX-DR-CD-00401 REVP05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 3 OF 8 A13394-PF-ZZ-XX-DR-CD-00402 REVP05Superseded Document | 11 Feb 2022 | View |
| A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 4 OF 8 A13394-PF-ZZ-XX-DR- CD-00403 REVP05Superseded Document | 11 Feb 2022 | View |
| ENVIRONMENTAL STATEMENT VOLUME 3 NON-TECHNICAL SUMMARY JANUARY 2022Superseded Document | 11 Feb 2022 | View |
Documents open on the council website. Browse council documents if a link has changed.
We haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.