Council planning record

Application for: (a) Detailed permission in respect of the construction of the Realigned A29 road; and (b) Outline permission with all matters reserved for the demolition of existing structures and mixed use development to provide up to 1,250 residential dwellings (Use Class C3), Care Home/Senior Living Accommodation (Use Class C2/C3), flexible retail and community floorspace (Use Classes E/F2/Sui Generis), a Primary School plus open space, landscaping, drainage and all other associated ancillary works, highways and associated infrastructure. This application also lies within the parish of Aldingbourne, affects the setting of listed buildings, affects the character & appearance of the Eastergate Church Lane Conservation Area and affects a Public Right of Way. This application is the subject of an Environmental Statement.

Barnham, Eastergate, Westergate BEW Parcel SC1 Barnham

UndecidedReference: BN/11/22/OUTArun District Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Undecided
Application type
Not published
Received
4 Feb 2022
Validated
4 Feb 2022
Determination deadline
31 Mar 2024
Local authority
Arun District Council

Application overview

Application for: (a) Detailed permission in respect of the construction of the Realigned A29 road; and (b) Outline permission with all matters reserved for the demolition of existing structures and mixed use development to provide up to 1,250 residential dwellings (Use Class C3), Care Home/Senior Living Accommodation (Use Class C2/C3), flexible retail and community floorspace (Use Classes E/F2/Sui Generis), a Primary School plus open space, landscaping, drainage and all other associated ancillary works, highways and associated infrastructure. This application also lies within the parish of Aldingbourne, affects the setting of listed buildings, affects the character & appearance of the Eastergate Church Lane Conservation Area and affects a Public Right of Way. This application is the subject of an Environmental Statement.

Proposal details

Reference
BN/11/22/OUT
Parish
Barnham & Eastergate
Agent
Ms Crowley Litchfield The Minster Building 21 Mincing Lane London EC3R 7AG

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Barnham, Eastergate, Westergate BEW Parcel SC1 Barnham

This record has no verified map location.

Documents 484 of 484

DocumentPublishedAction
ApplicationApplication21 Dec 2023View
PPA amended versionApplication8 Apr 2022View
CIL 1 FORMApplication10 Feb 2022View
COVER LETTERApplication10 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 HIGHWAY DRAINAGE LAYOUT SHEET 9 OF 10 A13394-PEF-ZZ-XX-DR-CD-0509 REVP8Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 COPOSITE DRAIANGE LAYOUT NORTH A13394-PEF-ZZ-XX-DR-CD-0511 REVP6Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 COMPOSITE DRAINAGE LAYOUT SOUTH A13394-PEF-ZZ-XX-DR-CD-0511 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX E COMPOSITE SURFACE WATER DRAINAGE PLANPlans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 COMPOSITE DRAINAGE LAYOUT SOUTH A13394-PEF-ZZ-XX-DR-CD-0511 REVP6Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 HIGHWAY DRAINAGE LAYOUT SHEET 3 OF 10 A13394-PEF-ZZ-XX-DR-CD-0503 REVP8Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13394-PF-ZZ-XX-DR-CD-00106 REVP06Plans15 Feb 2022View
ENVIRONMENT STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 8 OF 10 A13394-PF-ZZ-XX-DR-CD-00107 REVP06Plans15 Feb 2022View
ENVIRONMENT STATEMENT VOL 2 A29 EAST-WEST LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 8 OF 9 A13394-PF-ZZ-XX-DR-CD-00108 REVP03Plans15 Feb 2022View
ENVIRONMENT STATEMENT VOL 2 A29 BARNHAM STATION LINK ILLUSTRATIVE GENERAL ARRANGMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP03Plans15 Feb 2022View
ENVIRONMENT STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 1 OF 8 A13394-PF-ZZ-XX-DR-CD-00400 REVP05Plans15 Feb 2022View
ENVIRONMENT STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 2 OF 8 A13394-PF-ZZ-XX-DR-CD-00401 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 3 OF 8 A13394-PF-ZZ-XX-DR-CD-00402 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 4 OF 8 A13394-PF-ZZ-XX-DR-CD-00403 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 5 OF 8 A13394-PF-ZZ-XX-DR-CD-00404 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 6 OF 8 A13394-PF-ZZ-XX-DR-CD-00405 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 7 OF 8 A13394-PF-ZZ-XX-DR-CD-00406 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD EARTHOWRKS AND CONSTRUCTION EXTENTS SHEET 8 OF 8 A13394-PF-ZZ-XX-DR- D-00407 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 MASTERPLAN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-0001 REVP05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENTS SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR-CD-00103 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00104 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 9 OF 26 MASTERPLAN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-0001 REV P05Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 10 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 11 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 12 OF 26 A29 LINK ROAD GENERAL ARRANBGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 13 OF 26 A26 LINK ROAD GENERAL ARRANGEMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR-CD-00103 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSSESSMENT 14 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00104 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 15 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 16 OF 26 A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13394-PF-ZZ-XX-DR-CD-00106 REVP06Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 17 OF 26 A29 LINK ROAD GENERAL ARRANGEMENTS SHEET 8 OF 10 A13394-PF-ZZ-XX-DR-CD-00107 REVP06Plans15 Feb 2022View
ENVIRONMENT STATEMENT VOL 2 TRANSPORT ASSESSMENT 18 OF 26 A29 EAST-WEST LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 8 OF 9F A13394-PF-ZZ-XX-DR-CD-00108 REVP03Plans15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 19 OF 26 A29 BARNHAM STATION LINK ILLUSTRATIVE ARRANGEMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP03Plans15 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 3 A13394-PF-ZZ-XX-DR-CD-000115 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 4 A13394-PF-ZZ-XX-DR-CD-00116 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 5 A13394-PF-ZZ-XX-DR-CD-00117 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 6 A13394-PF-ZZ-XX-DR-CD-00118 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 7 A13394-PF-ZZ-XX-DR-CD-00119 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX PART 8 A13394-PF-ZZ-XX-DR-CD-00120 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 9 A13394-PF-ZZ-XX-DR-CD-00121 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 10 A13394-PF-ZZ-XX-DR-CD-00122 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 11 A13394-PF-ZZ-XX-DR-CD-00123 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 12 A13394-PF-ZZ-XX-DR-CD-00124 P03Plans14 Feb 2022View
ARBORICULTURAL ASSESSMENT APPENDIX C PART 13 A13394-PF-ZZ-XX-DR-CD-00125 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 1 A13394-PF-ZZ-XX-DR-CD-00100 P003Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 2 A13394-PF-ZZ-XX-DR- D-00101 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 3 A13394-PF-ZZ-XX-DR-CD-00102 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 4 A13394-PF-ZZ-XX-DR- D-00103 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 5 A13394-PF-ZZ-XX-DR-CD-00104 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 6 A13394-PF-ZZ-XX-DR-CD-00105 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 7 A13394-PF-ZZ-XX-DR-CD-00106 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 8 A13394-PF-ZZ-XX-DR-CD-00107 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 9 A13394-PF-ZZ-XX-DR-CD-00108 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 10 A13394-PF-ZZ-XX-DR-CD-00109 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 11 A13394-PF-ZZ-XX-DR-CD-00110 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX B PART 12 A13394-PF-ZZ-XX-DR-CD-00111 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APENDIX B PART 13 A13394-PF-ZZ-XX-DR-CD-00012 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 1 A13394-PF-ZZ-XX-DR-CD-00113 P03Plans14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX C PART 2 A13394-PF-ZZ-XX-DR-CD-00114 P03Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00108 P03Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00500 TO 00505-DESIGN AUDITPlans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 0501 TO 0507-HIGHWAY DRAINAGEPlans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 0508-0510 HIGHWAY DRAINAGEPlans14 Feb 2022View
DESING SUMMARY DOCUMENT APPENDIX A DWG CD-00001 P05Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX C A13394-SK030 REVC A29 GEOMETY DESIGNPlans14 Feb 2022View
MINERAL ASSESSMENT APPENDIX A DEVELOPMENT DRAWINGS ILLUSTRATIVE MASTERPLANPlans14 Feb 2022View
MINERAL ASSESSMENT APPENDIX D SAND AND GRAVEL MAPPlans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APP D 13394-PEF-ZZ-XX-M2-S-000003Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APP D PROPOSED BRIDGE FEP GA2PA W10 140122Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A A29 FULL LAYOUT REVDPlans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG-00100 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00101 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00102 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00103 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00104 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00105 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00106 P06Plans14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX A DWG 00107 P06Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX N1 CUMULATIVE SCHEMES PLANPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX A1 SITE LOCATION PLANPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C4 DEMOLITION PLANPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C2 FRAMEWORK MASTERPLANPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F3 FIGURE F2.2: ECOLOGICAL FEATURES (SOUTH)Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F4 FIGURE F3: PROTECTED SPECIESPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F5 FIGURE F4:GREAT CRESTED NEWT POND SURVEY PLANPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F1 FIGURE F1: APPLICATION SITE LOCATION AND ECOLOGICAL DESIGNATIONSPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX F2 FIGURE F2.1: ECOLOGICAL FEATURES (NORTH)Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLAN PARAMETER PLAN BUILDING HEIGHTS 00605_B PP03 REVP1Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS PARAMETER OPLAN LANDSCAPE AND GREEN INFRASTRUCTURE 00605_B PP04 REVP1Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS PARAMETER PLAN DEVELOPMENT AREAS CHARACTER PLAN 00605_B PP05 REVP1Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS PARAMETER PLAN ACCESS AND MOVEMENT 00605_B PP07 REVP1Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 SCHEME PLANS APPENDIX C1 SCHEME PLANS (PARAMETER PLANS AND DETAILED ACCESS DRAWINGS)Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00600 REVP03Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00601 REVP03Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00602 REVP03Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C5 LIGHTING ASSESSMENTPlans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 2 OF 8Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 3 OF 8Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 4 OF 8Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 5 OF 8Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 6 OF 8Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 7 OF 8Plans14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 LVIA PART 8 OF 8Plans14 Feb 2022View
DEMOLITION PLAN 00605B_ S05 REVP1Plans11 Feb 2022View
ILLUSTRATIVE MASTERPLAN 00605B_S_06 REVP1Plans11 Feb 2022View
A29 LINKROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00600 REVP03Plans11 Feb 2022View
A29 LINK ROAD STREET LIGHTING AND LIGHTING COUNTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00601 REVP03Plans11 Feb 2022View
A29 LINK ROAD STREET LIGHTING AND LIGHTING CONTOURS DESIGN A13394-PF-ZZ-XX-DR-CD-00602 REVP03Plans11 Feb 2022View
ILLUSTATIVE MASTERPLAN 00605B_S_06 REVP1Plans10 Feb 2022View
LOCATION PLAN 00605B_S07 REVP1Plans10 Feb 2022View
DEMOLITION PLAN 00605B_ SO5 REVP1Plans10 Feb 2022View
ES APPENDIX 1 LOCATION PLAN 00605B_S07 REVP2Substitute Plan21 Dec 2023View
ES APPENDIX 3 PARAMETER PLAN LANDSCAPE AND GREEN INFRASTRUCTURE 00605B_PP04 REVP2Substitute Plan21 Dec 2023View
ES APPENDIX 3 PARAMETER PLAN BUILDING HEIGHTS 00605B_PP03 REVP2Substitute Plan21 Dec 2023View
ES APPENDIX 3 PARAMETER PLAN LAND USE 00605B_PP01 REVP2Substitute Plan21 Dec 2023View
ES APPENDIX 3 PARAMETER PLAN ACCESS AND MOVEMENT 00605B_PP07 REVP3Substitute Plan21 Dec 2023View
ES APPENDIX 3 PARAMETER PLAN DEVELOPMENT AREA CHARACTER PLAN 00605B_PP05 REVP2Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 4 OF 8 D2898 FAB 00 XX DR L 1004 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 5 OF 8 D2898 FAB 00 XX DR L 1005 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 6 OF 8 D2898 FAB 00 XX DR L 1006 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 7 OF 8 D2898 FAB 00 XX0DR L 1007 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 8 OF 8 D2898 FAB 00 XX0DR L 1008 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSCAPE LEGEND AND SPECIFICATION D2898 FAB 00 XX DR L 1000 REVPL02Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENEREAL ARRANGEMENT SHEET 1 OF 8 D2898 FAB 00 XX DR L 1001 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 2 OF 8 D2898 FAB 00 XX DR L 1002 REVPL03Substitute Plan21 Dec 2023View
SOFT LANDSC APE GENERAL ARRANGEMENT PLAN SHEET 3 OF 8 D2898 FAB 00 XX DR L 1003 REVPL03Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 6 OF 8 A13394-PF-ZZ-XX-DR-CD-00405 REVP08Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 7 OF 8 A13394-PZ-XX-DR-CD-00406 REVP08Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 8 OF 8 A13394-PF-ZZ-XX-DR-CD-00407 REVP08Substitute Plan21 Dec 2023View
A298 LINK ROAD GENERAL ARRANGMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR-CD-00103 REVP09Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00104 REVP09Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 6 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP09Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13397-PF-ZZ-XX-DR-CD-00106 REVP09Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 8 OF 10 A13394-PF-ZZ-XX-DR-CD-00107 REVP10Substitute Plan21 Dec 2023View
A29 EAST WEST ;OML O;;ISTRATOVE GEMERAL ARRANGEMENT SHEET 8 OF 9 A13394-PF-ZZ-XX-DR-CD-00108 REV[06Substitute Plan21 Dec 2023View
A29 BARNHAM STATION LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP06Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 1 OF 8 A13394-PF-ZZ-XX-DR-CD-00400 REVP04Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 2 OF 8 A13394-PF-ZZ-XX-DR-CD-00401 REVP08Substitute Plan21 Dec 2023View
A/29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 3 OF 8 A13394-PF-ZZ-XX-DR-CD-00402 REVP08Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 4 OF 8 A13394-PF-ZZ-XX-DR-CD-00403 REVP08Substitute Plan21 Dec 2023View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 5 OF 8 A13394-PF-ZZ-XX-DR-CD-00404 REVP08Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP10Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP09Substitute Plan21 Dec 2023View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP09Substitute Plan21 Dec 2023View
MASTERPOALN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-00001 REVP09Substitute Plan21 Dec 2023View
Environmental statement vol 2 sustainable drainage reportStatement3 Dec 2024View
Covering letter RE: submission of updated drainage report - 8/5/24Statement24 May 2024View
COVER LETTERStatement21 Dec 2023View
PLANNING APPLICATION SUMMARY DOCUMENTStatement6 Apr 2022View
PPAStatement21 Feb 2022View
PPAStatement21 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX D1 TRANSPORT ASSESSMENT (TA)Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMETN PART 3 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 4 OF 26Statement15 Feb 2022View
ENFIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 2 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL2 TRANSPORT ASSESSMENT PART 5 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 6 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 7 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 8 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT 20 OF 26 JUNCTION TURNING FLOWS, UNITS@VEHICLES DEMAND FLOWSStatement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSEMENT PART 21 OF 26 TURNING FLOWS, UNITS: VEHICLES DEMAND FLOWSStatement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 22 OF 26Statement15 Feb 2022View
ENVIRONMENTAL STATMENT VOL 2 TRANSPORT ASSESSEMTN PART 23 OF 26 JUNCTIONSStatement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANPSORT ASESSMENT PART 24 OF 26 JUNCTIONSStatement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 25 OF 26 JUNCTIONSStatement15 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 TRANSPORT ASSESSMENT PART 26 OF 26 JUNCTIONSStatement15 Feb 2022View
APPENDIX A3 ENVIROCHECK DATASHEETS AND HISTORIC MAPS A13394-PF-C-ZZ-XX-RPT-0002 R001Statement14 Feb 2022View
APPENDIX A3 ENVIROCHECK DATASHEETS AND HISTORIC MAPS A13394-PF-C-ZZ-XX-RPT-0002 R001Statement14 Feb 2022View
PHASE 1 LAND CONTAMINATION DESK STUDY JANUARY 2022 A13394-PF-C-ZZ-XX-RPT-0002Statement14 Feb 2022View
MINERALS RESOURCE ASSESSMENT JANUARY 2022Statement14 Feb 2022View
A29 DESIGN STATEMENTStatement14 Feb 2022View
APPENDIX A1 ENVIROCHECK DATASHEETS AND HISTORIUC MAPS A13394-PF-C-ZZ-XX-RPT-00012 R001Statement14 Feb 2022View
APPENDIX A2 ENVIROCHECK DATASHEETS AND HISTORIC MAPS A13394-PF-C-ZZ-XX-RPT-0002 R0001Statement14 Feb 2022View
ARBORICULTURAL SURVEY APPENDIX A TREE SURVEY SCHEDULE BARNHAM BS5837Statement14 Feb 2022View
STATEMENT OF COMMUINITY INVOLVEMENT JANUARY 2022 PART 1Statement14 Feb 2022View
STATEMENT OF COMMUNITY INVOLVEMENT PART 2Statement14 Feb 2022View
PLANNING STATEMENT JANUARY 2022Statement14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX B A29 REALIGNMENT PHASE 1 BEW DELIVERY MEETING 13.02.20Statement14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX E WSCC QUESTIONS 290721-FINALStatement14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX E WSCC QUESTIONS DATED 090321 FP RESPONSES DOCUMENT 040521Statement14 Feb 2022View
DESIGN SUMMARY DOCUMENT APPENDIX F A13394-TN101-PEDESTRIAN CROSSING ASSESSMENTStatement14 Feb 2022View
MINERAL ASSESSMENT APPENDIX B WYG G1Statement14 Feb 2022View
MINERAL ASSESSMENT APPENDIX C HISTORIC GIStatement14 Feb 2022View
ARBORICULTURAL SURVEY REPORT JANUARY 2022Statement14 Feb 2022View
SUSTAINABILITY AND ENERGY STRATEGY JANUARY 2022Statement14 Feb 2022View
DESIGN SUMMARY DOCUMENT APP D LID RIFE BRIDGE OPT TECH NOTEStatement14 Feb 2022View
DESIGN SUMMARY DOCUMENT APP 2-000001-OVERBRIDGE OPTIONS REPORTStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER I : BUILT HERITAGE JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER J: ARCHAEOLOGY JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER K:WATER ENVIRONMENT AND DRAINAGE JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER L: SOCIO-ECONOMICS JANAURY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER : CLIMATE CHANGE AN DRESILLIENCE JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER N: CUMULATIVE ASSESSMENT JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER O: MITIGATION AND MONITORING JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOLUME 1 MAIN TEHCNICAL ASSESSMENTS TABLE OF CONTENTS JANAURY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER A: INTRODUCTION AND BACKGROUNDStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER B: SCOPE AND METHODOLOGY JANAURY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER C: SITE AND SCHEME DESCRIPTION JANAURY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER D: TRANSPORTATION JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER E: LANDSCAPE ADN VISUAL IMPACT ASSESSMENT JANAURY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER F: ECOLOGYStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER G: AIR QUALITY JANUARY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 1 CHAPTER H: NOISE AND VIBRATION JANAURY 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX K3 HEWRAT ANALYSISStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOLUME 2 TECHNICAL FIGURES AND APPENDICES TABLE OF CONTENTS JANUAR 2022Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B1 EIA SCOPING REPORTStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B2 EIA SCOPING OPINIONStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B3 CUMULATIVE ASSESSMENT BRIEFING NOTEStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX B4 SCOPING CORRESPONDENCE FOLLOWING SCHEME DESIGN ITERATIONSStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX A2 DEVELOPER STATEMENT OF COMPETENCYStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX C3 OUTLINE CEMPStatement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX D2 FRAMEWORK TRAVEL PLAN (ftp)Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT APPENDIX G1-7, CONSTRUCTION DUST ASSESSMENT PROCEDURE (G1), EPUK & IAQM PLANNIG FOR AIR QUALITY GUIDANCE (G2), PROFESSIONAL EXPERIENCES (G3), MODELLING METHODOLOGY (G4), RECEPTOR LOCATIONS (G5), EMISSIONS MITIGATION STATEMENT (G6), EMAIL CONSULTATION WITH ARUN DISTRICT COUNCIL (G7)Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX H1-5 NOISE GLOSSARY (H1), GRAPHS OF BASELINE SURVEY RESULTS (H2), CONSTRUCTION NOISE PLANT LISTS (H3), TRAFFIC NOISE ASSESSMENT (H4), NOISE CHAPTER FIGURES (H5)Statement14 Feb 2022View
ENVORNMENTAL STATEMENT VOL 2 APPENDIX E1-4 LVIA METHODOLOGY (E1), PLANS AND PHOTOS (E2), VERIFIED VISUAL MONTAGES (E3), A3 PHOTOS (E4) PART 1 OF 8Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX /1 AN ARCHAEOLOGICAL DESK BASED ASSESSMENT ('DBA')Statement14 Feb 2022View
ENVIRONMENTAL STATEMENT VOL 2 APPENDIX A2 DESK BASED ARCHAEOLOGICAL ASSESSMENT PART 2 OF 2Statement14 Feb 2022View
PHOTOS BEW PARCEL SC1 EXISTING ELEVATIONS BEW-001Statement11 Feb 2022View
ES VOLUME 1 ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JANUARY 2022 UPDATED DECEMBER 2023Substitute Document21 Dec 2023View
LANDSCAPE STRATEGY D2898 FAB-00-XX-RP-L-0001 REVPL08Substitute Document21 Dec 2023View
DAS PART 6Substitute Document21 Dec 2023View
DAS PART 7Substitute Document21 Dec 2023View
DAS PART 8Substitute Document21 Dec 2023View
DAS PART 9Substitute Document21 Dec 2023View
DAS PART 10Substitute Document21 Dec 2023View
DAS PART 1Substitute Document21 Dec 2023View
DAS PART 2Substitute Document21 Dec 2023View
DAS PART 3Substitute Document21 Dec 2023View
DAS PART 4Substitute Document21 Dec 2023View
DAS PART 5Substitute Document21 Dec 2023View
DESIGN PRINCIPLES PART 2Substitute Document21 Dec 2023View
DESIGN PRINCIPLES PART 3Substitute Document21 Dec 2023View
DESIGN PRINCIPLES PART 4Substitute Document21 Dec 2023View
DESIGN PRINCIPLES PART 1Substitute Document21 Dec 2023View
FLOOD RISK ASSESSMENTSubstitute Document21 Dec 2023View
Emails from Chichester DC Archaeology Officer & SLR 02.04.2026Additional Docs9 Apr 2026View
Proposed Mitigation Areas Overlying the Trench Plan Figure 1 (Archaeology) March 2026Additional Docs9 Apr 2026View
BS appendix 5 response to clarification to EA comments in full bognor Road rouad roundabout systra mitigation scheme A13494/VAA-PEF-XX-XX-TN-TR-000051 REV F01 FINALAdditional Docs3 Dec 2024View
Response to the comments made by WSCC 26/4/24Additional Docs24 May 2024View
FORM 1 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs9 Jan 2024View
FORM 3 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs9 Jan 2024View
FORM 4 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs9 Jan 2024View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FOR 6 A13394-PF-ZZ-SK-DR-CD-01004 REVP01Additional Docs9 Jan 2024View
A29 LINK ROAD A29-11 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-XX-DR-CD-00703 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs8 Jan 2024View
COVERING LETTERAdditional Docs21 Dec 2023View
SUPPLEMENTARY PLANNING STATEMENT 21 DECEMBER 2023Additional Docs21 Dec 2023View
ES VOLUME 1 ENVIRONMENTAL STATEMENT ADDENDUM DECEMBER 2023Additional Docs21 Dec 2023View
ICM MODELLING LOGAdditional Docs21 Dec 2023View
ES APPENDIX 5 RESPONSE TO CLARIFICATION TO EA COMMENTS IN FULL ICM MODEL SUMMARY REVP02Additional Docs21 Dec 2023View
NON REAL TIME HYDRAULIC MODEL REVIEW TEMPLATE LIT 17611 VERSION 6.0Additional Docs21 Dec 2023View
RESPONSE TO EA HOLDING OBJECTION IN RELATION TO FLOOD RISK ISSUES 100148-PEF-ZZ-XX-RP-YE-000400Additional Docs21 Dec 2023View
ES APPENDIX 5 RESPONSE TO CLARIFICATION TO EA COMMENTS IN FULL WHYKE ROAD ROUNDABOUT A27 (W) QUEUE A13394/VAA-PEF-XX-XX-TN-TR-000051 REVF01 FINALAdditional Docs21 Dec 2023View
ES APPENDIX 5 RESPONSE TO CLARIFICATION TO EA COMMENTS IN FULL NATIONAL HIGHWAYS RESPONSE 20-04-22Additional Docs21 Dec 2023View
RESPONSE TO NATIONAL HIGHWAYS COMMENTS 14/04/22 REVF2Additional Docs21 Dec 2023View
RESPONSE TO NATIONAL HIGHWAYS COMMENTS A13394/VA-PEF-XX-XX-TN-TR-000021Additional Docs21 Dec 2023View
A29 LINK ROAD A29-13 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-XX-DR-CD-00704 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HANBURY LINK ROAD LIDSEY ROAD ROUNDABOUT TRACKING A13394-PF-ZZ-XX-DR-CD-00705 REVP02 SUPPORTING DOUCMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
PROPOSED TRO CHANGES ON EXISTING LISDEY ROAD AS PART OF NEW A29 ALIGNMENT A13394-SK035 REVP03 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
SOUTHERN WATER ACCESS SWEPT PATH ANALYSIS A13394-SK036 REVP1 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
EXISTING A29 VISIBILITY SPLAYS A13394-SK043 REVP1 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-4 ROUNDABOUT SWEPT PATH ANALYSIS A13394-FP-ZZ-XX-DR-CD-00700 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-5 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-DR-CD-00701 REVP02 SUPPORTING DOUCMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-9 ROUNDABOUT SWEPT PATH ANALYSIS A13394-PF-ZZ-XX-DR-CD-00702 REVP2 SUPPORTING DOCUMENT ONLYH NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-9 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00502 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-11 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00503 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALOAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-13 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00504 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-14 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00505 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-4 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00500 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 LINK ROAD A29-5 ROUNDABOUT DESIGN AUDIT A13394-PF-ZZ-XX-DR-CD-00501 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 4 OF 10 A13394-PEF-ZZ-XX-DR- D-0504 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 5 OF 10 A13394-PEF-ZZ-XX-DR-CD-0505 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 6 OF 10 A13394-PEF-ZZ-XX-DR-CD-0506 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 7 OF 10 A13394-PEF-ZZ-XX-DR-CD-0507 REVP10 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE SHEET 8 OF 10 A13394-PEF-ZZ-XX-DR-CD-0508 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
A29 FULL LAYOUT SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 1 OF 10 A13394-PEF-ZZ-XX-DR-CD-0501 REVP11 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 2 OF 10 A13394-PEF-ZZ-XX-DR-CD-0502 REVP10 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 3 OF 10 A13394-PEF-ZZ-XX-DR-CD-0503 REV10 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
GENERAL ARRANGEMENT SINGLE SPAN BRIDGE 13394-PEF-ZZ-XX-M2-S-000001 REVP08 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
INITIAL BRIDGE OPTIONS 30M SINGLE SPAN FRAME ABUTMENT 13394-PEF-ZZ-XX-M2-S-000003 REVP07 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
LIDSEY FARM/EXISTING MANOEUVRES SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00006 REVP02 SUPPORTING DOCUMENTS ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
BEW DEVELOPMENT MASTERPLAN RAILWAY CROSSING REVEIW A13394-PF-ZZ-SK-DR-CD-00007 REVP01 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
MAIN A29 ROUTE JUNCTION ACCESS SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00008 REVP01 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 9 OF 10 A13394-PEF-ZZ-XX-DR-CD-0509 REVP11 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HIGHWAY DRAINAGE LAYOUT SHEET 10 OF 10 A13394-PEF-ZZ-XX-DR-CD-0510 REVP10 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
LISDEY FARM/LIDSEY CARAVAN PARK SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00004 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
HANBURY LINK EXISTING LANDFILL AND SUMMER BARN SWEPT PATH ANALYSIS A13394-PF-ZZ-SK-DR-CD-00005 REVP02 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
SWEPT PATH ANALYSIS REFUSE VEHICLE A13394-PF-ZZ-TR-DR-CD-00001 REVP00 SUPPORTING DOUCMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
SWEPT PATH ANALYSIS REFUSE VEHICLES A13394-PF-ZZ-TR-DR-CD-00002 REVP00 SUPPORTING DOCUMENT ONLY NOT FOR APPROVALAdditional Docs21 Dec 2023View
ES APENDIX 2 UPDATED HIGHWAY DRAWINGS ROAD SAFETY AUDIT DECISION LOG COVER SHEETAdditional Docs21 Dec 2023View
APPENDIX 4 RESPONSE TO CLARIFICATIUONS TO WSCC HIGHWAYS ADN NH COMMENTS IN FULL FORMAL RECOMMENDATION TO AN APPLICATION FOR PLANNING PERMISSIONAdditional Docs21 Dec 2023View
APPENDIX 4 RESPONSES TO CLARIFICATIONS TO WSCC HIGHWAYS AND NH COMMENTS IN FULLAdditional Docs21 Dec 2023View
APPENDIX 4 RESPONSE TO CLARIFICATION TO WSCC HIGHWAY AND NH COMMENTS IN FULL A13394/VAA-PEF-XX-XX-TN-TR-000022 REVF01 FINALAdditional Docs21 Dec 2023View
ROAD SAFETY AUDIT DECISION LOG COVER SHEET 040923Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 4 A13394-PF-ZZ-SK-DR-CD-01003 REVP00Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 6 A13394-PF-ZZ-SK-DR-CD-01004 REVP01Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 5 A13394-PF-ZZ-SK-DR-CD-01005 REVP00Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 7 A13394-PF-ZZ-SK-DR-CD-01006 REVP00Additional Docs21 Dec 2023View
FORM 3 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs21 Dec 2023View
SUPPLEMANTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 1 A13394-PF-ZZ-SK-DR-CD-01000 REVP00Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 2 A13394-PF-ZZ-SK-DR-CD-01001 REVP01Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 7 A13394-PF-ZZ-SK-DR-CD-01006 REVP00Additional Docs21 Dec 2023View
FORM 2 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs21 Dec 2023View
FORM 5 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV4Additional Docs21 Dec 2023View
FORM 6 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV-Additional Docs21 Dec 2023View
FORM 7 SUBMISSION TO WEST SUSSEX COUNTY COUNCIL FOR DEPARTURES FROM STANDARD 17-07-23 REV-Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 1 A13394-PF-ZZ-SK-DR-CD-01000 REVP00Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 2 A13394-PF-ZZ-SK-DR-CD-01001 REVP01Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 3 A13394-PF-ZZ-SK-DR-CD-01002 REVP00Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FOR 4 A13394-PF-ZZ-DK-DR-CD-01003 REVP00Additional Docs21 Dec 2023View
SUPPLEMENTARY INFORMATION FOR DEPARTURE FROM STANDARD FORM 5 A13394-PF-ZZ-SK-DR-CD-01005 REVP00Additional Docs21 Dec 2023View
NR CERTIFICATE OF APPROVAL FOR STAGE 1 (BUSINESS) CLEARANCE (COMMERCIAL) FOR INFORMATION ONLYAdditional Docs21 Dec 2023View
NR CERTIFICATE OF APPROVAL FOR STAGE 1 (BUSINESS) CLEARANCE (COMMERCIAL) FOR INFORMATION ONLYAdditional Docs21 Dec 2023View
Financial Viability AssessmentAdditional Docs15 Feb 2023View
Framework Travel Plan 8/11/2022Additional Docs9 Nov 2022View
Response to EA comments 05/10/2022Additional Docs21 Oct 2022View
Agent response to WSCC Highwaysfinal 03/08/2022Additional Docs21 Oct 2022View
Agent response to WSCC Highways comments round 2 24/06/2022Additional Docs21 Oct 2022View
Agent response to WSCCC Highways comments round 1 17/0/2022Additional Docs21 Oct 2022View
Note from Highways 20/10/2022Additional Docs21 Oct 2022View
Response to Consultation Comments 15.07.22Additional Docs18 Jul 2022View
WSCC Flood Risk Management TeamConsultation3 Jul 2024View
WSCC Surface Water Drainage responseConsultation20 Jun 2024View
WSCC Education responseConsultation31 May 2024View
WSCC - Highway AuthorityConsultation17 Apr 2024View
WSCC Lead Local Flood AuthorityConsultation27 Feb 2024View
Aldingbourne Parish Council ResponseConsultation22 Feb 2024View
PLCOMACKPCConsultation19 Feb 2024View
Environment agency responseConsultation16 Feb 2024View
Ecology responseConsultation14 Feb 2024View
WSCC Highways - Public Rights of WayConsultation13 Feb 2024View
Walberton Parish Council responseConsultation9 Feb 2024View
Southern WaterConsultation31 Jan 2024View
MWPA responseConsultation30 Jan 2024View
National Highways responseConsultation30 Jan 2024View
BARNHAM AND EASTERGATE PARISH COUNCIL RESPONSEConsultation24 Jan 2024View
Police designing out Crime responseConsultation11 Jan 2024View
National Highways responseConsultation5 Oct 2023View
Environment Agency responseConsultation21 Jul 2023View
National Highways additional commentsConsultation7 Jul 2023View
WSCC revised s106 consultation responseConsultation26 Jun 2023View
Network Rail Supplementary responseConsultation19 Apr 2023View
National Highways responseConsultation11 Apr 2023View
PLCOMACKPCConsultation7 Mar 2023View
NHS SussexConsultation5 Jan 2023View
National Highways responseConsultation19 Dec 2022View
NHS Coastal West Sussex ResposneConsultation14 Dec 2022View
NHS Coastal West Sussex Commissioning Group responseConsultation12 Dec 2022View
Environment Agency ResponseConsultation29 Nov 2022View
WSCC SECTION 106 CONSULTATION RESPONSEConsultation25 Nov 2022View
Southern Water ResponseConsultation3 Oct 2022View
WSCC S106 ResponseConsultation23 Sept 2022View
Ecology Advisor Consultation ResponseConsultation31 Aug 2022View
WSCC - Highways Authority responseConsultation20 Jul 2022View
WSCC - EducationConsultation14 Jul 2022View
National Highways - updated consultee responseConsultation13 Jul 2022View
WSCC - Highways AuthorityConsultation24 Jun 2022View
WSCC - Lead Local Flood AuthorityConsultation31 May 2022View
Network Rail Consultation ResponseConsultation18 May 2022View
WSCC - Highway Authority 2nd ResponseConsultation12 May 2022View
National HighwaysConsultation20 Apr 2022View
Sport England 11/4/22Consultation13 Apr 2022View
Interim response from Sport EnglandConsultation13 Apr 2022View
Sport England interim response 16/2/22Consultation12 Apr 2022View
Natural England 14/3/22Consultation12 Apr 2022View
WSCC- Highways 7/4/22Consultation12 Apr 2022View
Aldingbourne Parish CouncilConsultation30 Mar 2022View
PLCOMACKPCConsultation29 Mar 2022View
WSCC S106 consultation responseConsultation29 Mar 2022View
National Highways responseConsultation29 Mar 2022View
Environment Agency responseConsultation29 Mar 2022View
Walberton Parish CouncilConsultation28 Mar 2022View
Drainage engineers responseConsultation24 Mar 2022View
West Sussex Fire & Rescue ServiceConsultation24 Mar 2022View
WSCC Mineral & Waste planning responseConsultation23 Mar 2022View
BEPC ResponseConsultation22 Mar 2022View
Arun District Council GreenspaceConsultation21 Mar 2022View
Archaeology Advisor 16/3/22Consultation17 Mar 2022View
WSCC - EducationConsultation7 Mar 2022View
WSCC Highways - Public Rights of WayConsultation4 Mar 2022View
Environmental HealthConsultation2 Mar 2022View
Natural EnglandConsultation2 Mar 2022View
CDC EcologyConsultation28 Feb 2022View
Sussex Police 16/2/22Consultation16 Feb 2022View
Rep LettersRep Letters1 Aug 2025View
Rep LettersRep Letters1 Aug 2025View
PLCOMACKRep Letters17 Jun 2024View
PLCOMACKRep Letters2 Apr 2024View
PLCOMACKRep Letters4 Mar 2024View
PLCOMACKRep Letters27 Feb 2024View
PLCOMACKRep Letters21 Feb 2024View
PLCOMACKRep Letters20 Feb 2024View
PLCOMACKRep Letters13 Feb 2024View
Rep LettersRep Letters13 Feb 2024View
PLCOMACKRep Letters2 Feb 2024View
PLCOMACKRep Letters17 Jan 2024View
PLCOMACKRep Letters17 Jan 2024View
PLCOMACKRep Letters10 Jan 2024View
Rep LettersRep Letters15 May 2023View
PLCOMACKRep Letters7 Mar 2023View
PLCOMACKRep Letters8 Feb 2023View
PLCOMACKRep Letters24 Jan 2023View
PLCOMACKRep Letters12 Dec 2022View
PLCOMACKRep Letters19 Oct 2022View
PLCOMACKRep Letters8 Aug 2022View
PLCOMACKRep Letters30 May 2022View
PLCOMACKRep Letters6 May 2022View
Rep LettersRep Letters6 Apr 2022View
PLCOMACKRep Letters5 Apr 2022View
PLCOMACKRep Letters4 Apr 2022View
Rep LettersRep Letters31 Mar 2022View
PLCOMACKRep Letters29 Mar 2022View
Rep LettersRep Letters22 Mar 2022View
Rep LettersRep Letters22 Mar 2022View
PLCOMACKRep Letters18 Mar 2022View
PLCOMACKRep Letters18 Mar 2022View
Bognor Regis Town CouncilRep Letters16 Mar 2022View
PLCOMACKRep Letters9 Mar 2022View
PLCOMACKRep Letters4 Mar 2022View
PLCOMACKRep Letters25 Feb 2022View
Cover email RE additional uploads 24/5/24Planning Correspondence24 May 2024View
Amendment to PPA to 22/03/23Planning Correspondence29 Jan 2024View
Amended PPA to 31 March 2024Planning Correspondence29 Jan 2024View
Amendment to PPA 11/03/22Planning Correspondence29 Jan 2024View
Signed agreeement page March 2022Planning Correspondence29 Jan 2024View
Planning Performance Agreement August 2020Planning Correspondence29 Jan 2024View
Email with WSCC 25/04/2023Planning Correspondence26 Apr 2023View
Email with additional FTP 08/11/2022Planning Correspondence9 Nov 2022View
Email with applicant response to EA comments 20/10/2022Planning Correspondence21 Oct 2022View
Systems CorrespondenceSystems Correspondence8 Jul 2025View
PLACKSystems Correspondence17 Feb 2022View
DAS PART 3Superseded Document14 Feb 2022View
DAS PART 4Superseded Document14 Feb 2022View
DAS PART 5Superseded Document14 Feb 2022View
DAS PART 6Superseded Document14 Feb 2022View
DAS PART 7Superseded Document14 Feb 2022View
DAS PART 1Superseded Document14 Feb 2022View
DAS PART 2Superseded Document14 Feb 2022View
DESIGN PRINCIPLES DOCUMENT JANUARY 2022 PART 1Superseded Document14 Feb 2022View
DESIGN PRINCIPLES PART 2Superseded Document14 Feb 2022View
LANDSCAPE STRATEGY JANUARY 2021 PART 1Superseded Document14 Feb 2022View
LANDSCAPE STRATEGY PART 2Superseded Document14 Feb 2022View
PARAMETER PLAN LANDSCAPE AND GREEN INFRASTRUCTURE 00606B_ PP04 REVP1Superseded Document11 Feb 2022View
PARAMETER PLAN BUILDING HEIGHTS 00605B_ PP03 REVP1Superseded Document11 Feb 2022View
PARAMETER PLAN LAND USE 00605B_ PP01 REVP1Superseded Document11 Feb 2022View
LOCATION PLAN 00605B_S07 REVP1Superseded Document11 Feb 2022View
PARAMETER PLAN ACCESS AND MOVEMENT 00605B_PP07 REVP1Superseded Document11 Feb 2022View
PARAMETER PLAN DEVELPMENT AREAS CHARACTER PLAN 00605B_PP05 REVP1Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 2 OF 8 1002 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 3 OF 8 1003 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 4 OF 8 1004 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 5 OF 8 1005 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 6 OF 8 1006 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 7 OF 8 1007 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 8 OF 8 1007 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE LEGEND AND SPECIFICATION 1000 REVPL01Superseded Document11 Feb 2022View
SOFT LANDSCAPE GENERAL ARRANGEMENT PLAN SHEET 1 OF 8 1001 REVPL01Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 1 OF 10 A13394-PF-ZZ-XX-DR-CD-00100 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 2 OF 10 A13394-PF-ZZ-XX-DR-CD-00101 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 3 OF 10 A13394-PF-ZZ-XX-DR-CD-00102 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 4 OF 10 A13394-PF-ZZ-XX-DR- D-00103 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR- D-00104 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 5 OF 10 A13394-PF-ZZ-XX-DR-CD-00105 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 7 OF 10 A13393-PF-ZZ-XX-DR-CD-00106 REVP06Superseded Document11 Feb 2022View
A29 LINK ROAD GENERAL ARRANGEMENT SHEET 8 OF 10 A13393-PF-ZZ-XX-DR-CD-00107 REVP06Superseded Document11 Feb 2022View
A29 EAST-WEST LINK ILLUSTRATIVE GENERAL ARRABGENEBT SHEET 8 OF 9 A13394-PF-ZZ-XX-DR- CD-00108 REVP03Superseded Document11 Feb 2022View
A29 BARNHAM STATION LINK ILLUSTRATIVE GENERAL ARRANGEMENT SHEET 9 OF 9 A13394-PF-ZZ-XX-DR-CD-00109 REVP03Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 1 OF 8 A13394-PF-ZZ-XX-DR-CD-00400 REVP05Superseded Document11 Feb 2022View
MASTERPLAN HIGHWAY CORRIDOR INCLUDING JUNCTIONS A13394-PF-ZZ-XX-DR-CD-0001 REVP05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 5 OF 8 A13394-PF-ZZ-XX-DR-CD-00404 REVP05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 6 OF 8 A13394-PF-ZZ-XX-DR-CD-00405 REVP05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 7 OF 8 A13394-PF-ZZ-XX-DR-CD-00406 REVP05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 8 OF 8 A13394-PF-ZZ-XX-DR-CD-00407-P05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 2 OF 8 A13394-PF-ZZ-XX-DR-CD-00401 REVP05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 3 OF 8 A13394-PF-ZZ-XX-DR-CD-00402 REVP05Superseded Document11 Feb 2022View
A29 LINK ROAD EARTHWORKS AND CONSTRUCTION EXTENTS SHEET 4 OF 8 A13394-PF-ZZ-XX-DR- CD-00403 REVP05Superseded Document11 Feb 2022View
ENVIRONMENTAL STATEMENT VOLUME 3 NON-TECHNICAL SUMMARY JANUARY 2022Superseded Document11 Feb 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
ES APENDIX 2 UPDATED HIGHWAY DRAWINGS ROAD SAFETY AUDIT DECISION LOG COVER SHEET ROAD SAFETY AUDIT DECISION LOG COVER SHEET 040923
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.