Demolition of Wings House & erection of 71 No. replacement dwellings (70 net new dwellings), access arrangements, sustainable drainage measures, public open space, landscaping & all other associated works (resubmission following AL/46/20/PL). This application is a Departure from the Development Plan.

Land At Wings Nursery Lidsey Road Woodgate PO20 3SU

App Cond with S106Reference: AL/20/21/PLArun District Council

Last published check: 30 Sept 2026, 14:52. Check the council record for more recent changes.

Application location

Land At Wings Nursery Lidsey Road Woodgate PO20 3SU

This record has no verified map location.

Application summary

Status
App Cond with S106
Application type
Not published
Received
9 Feb 2021
Validated
18 Feb 2021
Determination deadline
1 Mar 2022
Local authority
Arun District Council

Application overview

Demolition of Wings House & erection of 71 No. replacement dwellings (70 net new dwellings), access arrangements, sustainable drainage measures, public open space, landscaping & all other associated works (resubmission following AL/46/20/PL). This application is a Departure from the Development Plan.

Proposal details

Reference
AL/20/21/PL
Parish
Aldingbourne
Agent
Thakeham Client Ltd Thakeham House Stane Street Billingshurst RH14 9GN

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 229 of 229

DocumentPublishedAction
DecisionDecision1 Mar 2022View
Officers ReportOfficers Report1 Mar 2022View
Delegated authority decisionSection 106 Planning Agreement24 Feb 2022View
Completed agreement dated 22/02/22Section 106 Planning Agreement24 Feb 2022View
Form 10 Social Housing ReliefApplication23 Mar 2022View
CIL FORM 6 COMMENCEMENT NOTICEApplication22 Mar 2022View
(CIL) - Form 2: Assumption of LiabilityApplication16 Mar 2022View
ApplicationApplication15 Feb 2021View
Social Housing Relief site mapPlans23 Mar 2022View
Appendix 13 T1 Detail Phase 1 Protection Plan (13/08/21)Plans13 Aug 2021View
Appendix 14 T1 Detail Phase 2 Protection Plan (13/08/21)Plans13 Aug 2021View
Appendix 15 T15 Detail (13/08/21)Plans13 Aug 2021View
Unit 50-51 Proposed plans and elevations 0143 01Plans26 May 2021View
Appendix 6 - development proposal planPlans26 May 2021View
Internal layout turning head swept path analysis 007 JPlans26 May 2021View
Units 44-45 proposed plans and elevations 0130 02Plans26 May 2021View
Units 46-47 proposed plans and elevations 0131 02Plans26 May 2021View
UNIT 63 FLOOR PLANS, ELEVATIONS, ROOF PALN 0137 REV02Plans18 Feb 2021View
UNITS 3 & 4 FLOOR PLANS, ELEVATIONS, ROOF PLANS 0111 REV01Plans15 Feb 2021View
UNITS 13 & 14 FLOOR PLANS, ELEVATIONS, ROOF PLAN 01116 REV01Plans15 Feb 2021View
UNITS 5 & 6 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0112 REV01Plans15 Feb 2021View
UNITS 9-10 FLOOR PLANS, ELEVATIONS, ROOF PLAN 01114 REV01Plans15 Feb 2021View
UNITS 1-2 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0110 REV01Plans15 Feb 2021View
UNITS 11-12 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0115 REV01Plans15 Feb 2021View
UNITS 7-8 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0113 REV01Plans15 Feb 2021View
UNITS 15-16 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0117 REV01Plans15 Feb 2021View
UNITS 17-18 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0118 REV01Plans15 Feb 2021View
UNITS 19-21 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0119 REV01Plans15 Feb 2021View
UNITS 32-33 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0124 REV01Plans15 Feb 2021View
UNITS 30-31 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0123 REV01Plans15 Feb 2021View
UNITS 28-29 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0122 REV01Plans15 Feb 2021View
UNITS 24-27 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0121 REV01Plans15 Feb 2021View
UNITS 36-37 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0126 REV01Plans15 Feb 2021View
UNITS 22-23 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0120 REV01Plans15 Feb 2021View
UNITS 34-35 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0125 REV01Plans15 Feb 2021View
UNITS 40-41 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0128 REV01Plans15 Feb 2021View
UNITS 57-58 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0134 REV01Plans15 Feb 2021View
UNITS 52-54 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0132 REV01Plans15 Feb 2021View
UNITS 59-60 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0135 REV01Plans15 Feb 2021View
UNITS 66-67 FLOOR PLANS,ELEVATIONS, ROOF PLAN 0139 REV01Plans15 Feb 2021View
UNITS 55-56 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0133 REV01Plans15 Feb 2021View
UNITS 64-65 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0138 REV01Plans15 Feb 2021View
UNITS 68-69 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0140 REV01Plans15 Feb 2021View
UNITS 70-71 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0141 REV01Plans15 Feb 2021View
EXISTING PROPERTY FOOTPRINT AND ELEVATIONS SK_001Plans15 Feb 2021View
EXISTING SITE PROPERTY FLOOR PLANS SK_002Plans15 Feb 2021View
SOILS HABITAT KEYPlans15 Feb 2021View
SOILS SPATIAL DISTRIBUTIONPlans15 Feb 2021View
CYCLE STORE FLOOR PLAN AND ELEVATIONS & SUBSTATION ENCLOSURE FLOOR PLAN AND ELEVATIONS 0008 REV01Plans15 Feb 2021View
SITE SECTIONS 0061 REV01Plans15 Feb 2021View
DRAINAGE AND SEWER RECORDSPlans15 Feb 2021View
TOPOGRAPHICAL SURVEY 1Plans15 Feb 2021View
GEO ENVIRONMENTAL PLANS & EXPLORATORY HOLE LOGS & DCP RESULTSPlans15 Feb 2021View
HERPlans15 Feb 2021View
Site location plan 0001 03 - reuploaded in correct landscape orientationSubstitute Plan16 Aug 2021View
Appendix 7 Tree Protection Plan (13/08/21)Substitute Plan13 Aug 2021View
Proposed Block Plan 0003 Rev 03Substitute Plan13 Aug 2021View
Proposed Site Plan 0004 Rev 06Substitute Plan13 Aug 2021View
2949-LA-01 Rev G General Arrangement Plan 1 of 2Substitute Plan30 Jun 2021View
2949-LA-02 Rev F General Arrangement Plan 2 of 2Substitute Plan30 Jun 2021View
0136 Rev 04 Proposed Plans & Elevations Units 61-62Substitute Plan25 Jun 2021View
Landscape masterplan 01 DSubstitute Plan26 May 2021View
Existing site plan 0002 02Substitute Plan26 May 2021View
Site sections 0060 02Substitute Plan26 May 2021View
Sitre sections 0061 03Substitute Plan26 May 2021View
Units 38-39 proposed plans and elevations 0127 02Substitute Plan26 May 2021View
Units 42-43 proposed plans and elevations 0129 02Substitute Plan26 May 2021View
Record of Site Visits and Arboricultural SupervisionStatement9 May 2022View
Land Drainage Consent May 2021Statement13 Aug 2021View
Letter giving Land Drainage Consent May 2021Statement13 Aug 2021View
Ecology Response to Natural England Comments on Appropriate AssessmentStatement4 Aug 2021View
Road Safety Response Report/Road Safety Audit Log signed 21/10/20Statement18 Jun 2021View
Cover letter 14/05/21Statement26 May 2021View
Reptile surevy May 2021Statement26 May 2021View
Information to Inform an Habitat Regulations Assessment (April 2021)Statement23 Apr 2021View
AGRICULTURAL LAND ASSESSMENTStatement15 Feb 2021View
SUPPLEMENTAL DESIGN STATEMENTStatement15 Feb 2021View
COVERING LETTERStatement15 Feb 2021View
LVRStatement15 Feb 2021View
BIODIVERSITY CHECKLISTStatement15 Feb 2021View
RE-SURVEY REPORTStatement15 Feb 2021View
HABITAT SUITABILITY INDEX & eDNA TESTSStatement15 Feb 2021View
PRELIMINARY ECOLOGICAL APPRAISALStatement15 Feb 2021View
ECOLOGY ASSESSMENTStatement15 Feb 2021View
PRELIMINARY ECOLOGICAL REPORTStatement15 Feb 2021View
BAT SURVEY REPORTStatement15 Feb 2021View
SOIL RESOURCE PLANStatement15 Feb 2021View
ENERGY STATEMENTStatement15 Feb 2021View
PLANNING STATEMENT INCORPORATING AFFORDABLE HOUSING STATEMENT AND DRAFT S106 HEADS OF TERMSStatement15 Feb 2021View
ACCESS SWEPT PATH ANALYSIS, WSCC EMAILS, ROAD SAFETY AUDITStatement15 Feb 2021View
SGN 4: EXPLANATORY NORTES AND EXAMPLESStatement15 Feb 2021View
ARBORICULTURAL REPORTStatement15 Feb 2021View
ADDENDUM GROUND GAS & GROUNDWATERStatement15 Feb 2021View
GROUND APPRAISAL REPORTStatement15 Feb 2021View
Written scheme of investigation for archaeological evaluation Issue 4, Aug 21Substitute Document17 Aug 2021View
Schedule of Accommodation 19-121 Rev P15Substitute Document25 Jun 2021View
Design and access statement 12Substitute Document26 May 2021View
CIL form 1Substitute Document26 May 2021View
Flood risk assessment and drainage strategySubstitute Document26 May 2021View
Transport statementSubstitute Document26 May 2021View
Travel planSubstitute Document26 May 2021View
Transport Statement Part 2Substitute Document26 May 2021View
Further Natural England response re hours of construction workingConsultation21 Jan 2022View
Natural England - Response to Revised Appropriate AssessmentConsultation1 Sept 2021View
Final Tree Officer Consultation CommentsConsultation20 Aug 2021View
Further Archaeology ResponseConsultation5 Aug 2021View
Natural EnglandConsultation21 Jul 2021View
Tree OfficerConsultation20 Jul 2021View
Environmental HealthConsultation6 Jul 2021View
Further affordable housing responseConsultation6 Jul 2021View
Drainage engineer commentsConsultation2 Jul 2021View
WSCC - Highways AuthorityConsultation24 Jun 2021View
ADC Drainage EngineerConsultation23 Jun 2021View
ADC Greenspace response 17/06/21Consultation18 Jun 2021View
WSCC - Highways Authority commentsConsultation3 Jun 2021View
WSCC Highways response 19/05/21Consultation21 May 2021View
Further Archaeologist Consultation AdviceConsultation14 May 2021View
Further Landscape Officer commentsConsultation20 Apr 2021View
SDNP response 07/04/21Consultation8 Apr 2021View
Engineers Comments Regarding Surface Water DrainageConsultation6 Apr 2021View
WSCC highways response 26/02/21Consultation31 Mar 2021View
WSCC Highways response 26/02/21Consultation30 Mar 2021View
Greenspace response 25/03/21Consultation29 Mar 2021View
Highways EnglandConsultation26 Mar 2021View
WSCC Lead Local Flood AuthorityConsultation25 Mar 2021View
Southern WaterConsultation12 Mar 2021View
Southern WaterConsultation12 Mar 2021View
Archaeology advisorConsultation9 Mar 2021View
West Sussex Fire and Rescue ServiceConsultation5 Mar 2021View
HOUSING STRATEGY AND ENABLING MANAGERConsultation24 Feb 2021View
CDC EcologyConsultation22 Feb 2021View
Sussex PoliceConsultation19 Feb 2021View
Objection - Further National Highways (formerly Highways) Comments 24/12/21Rep Letters6 Jan 2022View
Rep LettersRep Letters5 Jan 2022View
Letter of Support- ABE Community Land TrustRep Letters8 Sept 2021View
PLCOMACKRep Letters23 Mar 2021View
PLCOMACKRep Letters23 Mar 2021View
PLCOMACKRep Letters22 Mar 2021View
Rep LettersRep Letters10 Mar 2021View
PLCOMACKRep Letters4 Mar 2021View
Request to cease works and continue under AL/34/22/plPlanning Correspondence27 Jul 2022View
Tree Officer Confirmation that PC Tree Protection Condition 8 complied withPlanning Correspondence9 May 2022View
Social Housing Relief Additional DocumentsPlanning Correspondence23 Mar 2022View
CIL FORM 6 COMMENCEMENT ACKPlanning Correspondence22 Mar 2022View
CIL FORM 6 COMMENCEMENT ACKPlanning Correspondence22 Mar 2022View
CIL FORM 6 COMMENCEMENT ACKPlanning Correspondence22 Mar 2022View
Email addendum to Decision Notice correcting two plan refsPlanning Correspondence22 Mar 2022View
CIL LIABILITY NOTICE - UPDATED RELIEFPlanning Correspondence21 Mar 2022View
CIL LIABILITY NOTICE - UPDATED RELIEFPlanning Correspondence21 Mar 2022View
CIL LIABILITY NOTICE - UPDATED RELIEFPlanning Correspondence21 Mar 2022View
Correspondence with agent regarding CIL Liability NoticePlanning Correspondence17 Mar 2022View
Extension of Time until 01/03/22Planning Correspondence28 Feb 2022View
Extension of Time until 25/02/22Planning Correspondence17 Feb 2022View
Planning CorrespondencePlanning Correspondence3 Feb 2022View
Extension of Time until 04/02/22Planning Correspondence19 Jan 2022View
Response to National HighwaysPlanning Correspondence11 Jan 2022View
Applicant Agreement to National Highways ContributionPlanning Correspondence7 Jan 2022View
Planning CorrespondencePlanning Correspondence5 Jan 2022View
Re requested change to the construction hours conditionPlanning Correspondence8 Dec 2021View
Extension of Time until 15/11/21Planning Correspondence27 Oct 2021View
Notiification of committee meetingPlanning Correspondence27 Aug 2021View
Extension of Time to 10/09/21Planning Correspondence24 Aug 2021View
Email accompanying revised Archaeological WSIPlanning Correspondence17 Aug 2021View
Appropriate Assessment (Version 2) and Request to Natural EnglandPlanning Correspondence13 Aug 2021View
Email from Tree Officer Feb 21 stating happy with watercourse diversion around treePlanning Correspondence13 Aug 2021View
Email accompanying and explaining changes to the scheme in response to Tree objectionPlanning Correspondence13 Aug 2021View
Advice from Tree Officer re Proposed Layout changesPlanning Correspondence11 Aug 2021View
Email accompanying Response to NE objectionPlanning Correspondence4 Aug 2021View
Planning CorrespondencePlanning Correspondence3 Aug 2021View
Applicant Agreement to Amended PC conditions 8 & 18Planning Correspondence21 Jul 2021View
Planning CorrespondencePlanning Correspondence21 Jul 2021View
Notification of planning committee 28/07/21Planning Correspondence20 Jul 2021View
Agent Response to PC ConditionsPlanning Correspondence16 Jul 2021View
re Pre-Commencement ConditionsPlanning Correspondence6 Jul 2021View
Re changes to landscsping plans due to drainage commentsPlanning Correspondence30 Jun 2021View
Appropriate Assessment and Request to Natural EnglandPlanning Correspondence25 Jun 2021View
Email acompanying change to plot 61Planning Correspondence25 Jun 2021View
Update on Application/Recommendation inc request re plot 61Planning Correspondence22 Jun 2021View
Planning CorrespondencePlanning Correspondence28 May 2021View
Extension of Time until 30/07/21Planning Correspondence21 May 2021View
Planning CorrespondencePlanning Correspondence11 May 2021View
Response to proposed changes to the schemePlanning Correspondence29 Apr 2021View
Planning CorrespondencePlanning Correspondence29 Apr 2021View
Planning CorrespondencePlanning Correspondence20 Apr 2021View
Comments/concerns with the applicationPlanning Correspondence19 Apr 2021View
email SD - M Green 09/04/21Planning Correspondence9 Apr 2021View
Note about Archaeological Report SubmissionPlanning Correspondence26 Mar 2021View
Email SD - MG at Thakeham 25/03/21Planning Correspondence25 Mar 2021View
Planning CorrespondencePlanning Correspondence1 Mar 2021View
EMAIL FROM MEGAN GREEN AT THAKEHAM 17/02/21Planning Correspondence18 Feb 2021View
PL_PCC_LTRSystems Correspondence6 Jul 2021View
PL_PCC_LTRSystems Correspondence5 Jul 2021View
PL_PCC_LTRSystems Correspondence2 Jul 2021View
PLACKSystems Correspondence18 Feb 2021View
PLINVAGSystems Correspondence17 Feb 2021View
PLACKPPSystems Correspondence15 Feb 2021View
General arrangement plan 1 of 2 01 FSuperseded Document26 May 2021View
General arrangement plan 2 of 2 02 ESuperseded Document26 May 2021View
Appendix 7 - development proposal planSuperseded Document26 May 2021View
Site location plan 0001 03Superseded Document26 May 2021View
Proposed block plan 0003 02Superseded Document26 May 2021View
Proposed site plan 0004 05Superseded Document26 May 2021View
Units 61-62 proposed plans ane elevations 0136 03Superseded Document26 May 2021View
Written scheme of investigation for archaeological evaluationSuperseded Document12 May 2021View
Schedule of accommodationSuperseded Document25 Mar 2021View
CIL form 1Superseded Document25 Mar 2021View
GENERAL ARRANGEMENT PLAN 2 OF 2 2949-LA-02 REVBSuperseded Document18 Feb 2021View
UNITS 38-39 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0127 REV01Superseded Document15 Feb 2021View
UNITS 42-43 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0129 REV01Superseded Document15 Feb 2021View
UNITS 44-47 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0130 REV01Superseded Document15 Feb 2021View
UNITS 61-62 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0136 REV01Superseded Document15 Feb 2021View
UNITS 48-51 FLOOR PLANS, ELEVATIONS, ROOF PLAN 0131 REV01Superseded Document15 Feb 2021View
EXISTING SITE PLAN 0002 REV01Superseded Document15 Feb 2021View
LANDSCAPE MASTERPLAN 2949-SL-01 REVBSuperseded Document15 Feb 2021View
GENERAL ARRANGEMENT PLAN 1 OF 2 2949-LA-01 REVCSuperseded Document15 Feb 2021View
PROPOSED BLOCK PLAN 0003 REV01Superseded Document15 Feb 2021View
SITE SECTIONS 0061 REV01Superseded Document15 Feb 2021View
PROPOSED SITE PLAN 0004 REV01Superseded Document15 Feb 2021View
LOCATION PLAN 0001 REV01Superseded Document15 Feb 2021View
TRAVEL PLANSuperseded Document15 Feb 2021View
REPTILE SURVEY REPORTSuperseded Document15 Feb 2021View
DAS PAGE 41Superseded Document15 Feb 2021View
DAS PAGES 14-18Superseded Document15 Feb 2021View
DAS PAGES 19-28Superseded Document15 Feb 2021View
DAS PAGES 29-40Superseded Document15 Feb 2021View
DAS PAGES 1-13Superseded Document15 Feb 2021View
TRANSPORT STATEMENTSuperseded Document15 Feb 2021View
CIL 1 FORMSuperseded Document15 Feb 2021View
FRA & DRAINAGE STRATEGYSuperseded Document15 Feb 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

App Cond with S106
Decision Delegated authority decision Email addendum to Decision Notice correcting two plan refs
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.