Council planning record

Approval of details reserved by condition imposed under reference AL/154/23/PL (APP/C3810/W/23/3335883) relating to condition number 3 - Construction Management Plan, condition number 5 - surface water drainage scheme, condition number 8 - external materials and finishes and condition number 9 - energy.

Karenza Hook Lane Aldingbourne PO20 3TB

DOC Part ApprovedReference: AL/13/25/DOCArun District Council

Application location

Karenza Hook Lane Aldingbourne PO20 3TB

This record has no verified map location.

Application summary

Status
DOC Part Approved
Application type
Not published
Received
10 Feb 2025
Validated
11 Feb 2025
Determination deadline
8 Apr 2025
Local authority
Arun District Council

Application overview

Approval of details reserved by condition imposed under reference AL/154/23/PL (APP/C3810/W/23/3335883) relating to condition number 3 - Construction Management Plan, condition number 5 - surface water drainage scheme, condition number 8 - external materials and finishes and condition number 9 - energy.

Proposal details

Reference
AL/13/25/DOC
Parish
Aldingbourne
Agent
Sussex Building Consultancy Limited Sussex Building Consultancy Limited 3 NORTHCOTE ROAD BOGNOR REGIS PO21 5LZ

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 44 of 44

DocumentPublishedAction
DecisionDecision27 Nov 2025View
DecisionDecision17 Apr 2025View
DecisionDecision31 Mar 2025View
DecisionDecision25 Mar 2025View
APPLICATION FORMApplication10 Feb 2025View
COVERING LETTERApplication10 Feb 2025View
SUDS DESIGN SETTINGS DATA (30/10/24/)Plans10 Feb 2025View
435050 - SuDS Maintenance and Management Plan (SEPT 2025 - KARENZA)Substitute Plan26 Sept 2025View
435050 - Surface Water Drainage Design 25.09.25Substitute Plan26 Sept 2025View
AL-13-25-DOC Karenza Comment Tracker (CCL Responses 25.09.25).docStatement26 Sept 2025View
AL-13-25-DOC Karenza Comment Tracker (CCL Responses 25.09.25).pdfStatement26 Sept 2025View
SAP Calculations DB-01 16 April 2025Substitute Document23 Apr 2025View
CONSTRUCTION MANAGEMENT PLAN Rev 3 MARCH 2025Substitute Document19 Mar 2025View
Drainage Layout 2 of 2 435050-202CAdditional Docs25 Jun 2025View
Drainage Details 1 of 2 435050-203CAdditional Docs25 Jun 2025View
Drainage Details 2 of 2 435050-204CAdditional Docs25 Jun 2025View
Ditch Sections 435050-205CAdditional Docs25 Jun 2025View
Headwall Details 435050-206CAdditional Docs25 Jun 2025View
Catchment Area Plan 435050-207CAdditional Docs25 Jun 2025View
ADC DE Response linked to subs 20.6.25Additional Docs25 Jun 2025View
Drainage Layout 1 of 2 435050-201CAdditional Docs25 Jun 2025View
Proposed elevations Plot 2Additional Docs23 Apr 2025View
Proposed Roof plan plot 2Additional Docs23 Apr 2025View
Covering letter Ref: DB-01L 7.4.25Additional Docs15 Apr 2025View
Engineers Comments Regarding Surface Water DrainageConsultation28 Nov 2025View
Drainage Engineers responseConsultation15 Sept 2025View
Drainage Engineers responseConsultation7 May 2025View
Environmental Health Consultation ResponseConsultation25 Mar 2025View
WSCC Highways responseConsultation14 Mar 2025View
Environmental Health Consultation ResponseConsultation24 Feb 2025View
Rep LettersRep Letters18 Feb 2025View
Email 26.09 substitute SUDS infoPlanning Correspondence26 Sept 2025View
Email linked to subs 20.6.25Planning Correspondence25 Jun 2025View
Covering email from agent with thermal calculations and proposed plans for Plot 2 16.04.25Planning Correspondence23 Apr 2025View
Email linked to Sup 7.4.25Planning Correspondence15 Apr 2025View
Correspondence with agentPlanning Correspondence1 Apr 2025View
EMAIL LINKED TO SUB 18.3.25Planning Correspondence19 Mar 2025View
PLACKSystems Correspondence12 Feb 2025View
PLACKPPSystems Correspondence10 Feb 2025View
Surface Water Drainage Design Report 17.6.25 (TB/435050/eg)Superseded Document25 Jun 2025View
Maintenance & Management Plan 435050-208CSuperseded Document25 Jun 2025View
SAP calculations and specifications - Ref: DB-01P 7.4.25Superseded Document15 Apr 2025View
CONSTRUCTION MANAGEMENT PLAN - CONSTRUCTION CODE - JAN 2025Superseded Document10 Feb 2025View
DRAINAGE STRATEGY REPORT TB/435050/eg SEPT 2023Superseded Document10 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decided

    Published milestoneCouncil source

Decision & conditions

DOC Part Approved
Decision Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.