Council planning record

Approval of details reserved by condition imposed under ref A/51/14/OUT relating to Condition Nos 6 - surface water drainage onto public highway, 21 - surface water drainage and 22 - maintenance & management of SuDs.

Manor Nursery High Street Angmering BN16 4AW

DOC ApprovedReference: A/166/20/DOCArun District Council

Last published check: 1 Oct 2026, 16:17. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
DOC Approved
Application type
Not published
Received
5 Oct 2020
Validated
6 Oct 2020
Determination deadline
5 Feb 2021
Local authority
Arun District Council

Application overview

Approval of details reserved by condition imposed under ref A/51/14/OUT relating to Condition Nos 6 - surface water drainage onto public highway, 21 - surface water drainage and 22 - maintenance & management of SuDs.

Proposal details

Reference
A/166/20/DOC
Parish
Angmering
Agent
ECE Planning Ltd Brooklyn Chambers 11 Goring Road Worthing BN12 4AP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Manor Nursery High Street Angmering BN16 4AW

This record has no verified map location.

Documents 153 of 153

DocumentPublishedAction
DecisionDecision3 Feb 2021View
DecisionDecision3 Feb 2021View
DecisionDecision3 Feb 2021View
Application FormApplication13 Oct 2020View
Cover LetterApplication13 Oct 2020View
Sales drawing DS0993Plans11 Dec 2020View
Bypass separator ext neck assemblies DS1216Plans11 Dec 2020View
Location of Proposed BRE365 Testing Dwg No 11 Rev APlans12 Oct 2020View
Proposed Drainage Strategy Dwg No 102 Rev BPlans12 Oct 2020View
Proposed Drainage Strategy Dwg No 102 Rev DPlans12 Oct 2020View
Proposed Drainage Strategy Schedules Dwg No 103Plans12 Oct 2020View
Proposed Drainage Stragey Schedules Dwg No 104Plans12 Oct 2020View
Proposed Drainage Strategy Schedules Dwg No 106 Rev BPlans12 Oct 2020View
Proposed Drainage Strategy Schedules Dwg No 201 Rev APlans12 Oct 2020View
Proposed Drainage Strategy Schedules Dwg No 105 Rev BPlans12 Oct 2020View
BRE 365 soakage test resultsSubstitute Plan25 Jan 2021View
BRE 365 soakage test resultsSubstitute Plan25 Jan 2021View
BRE 365 soakage test resultsSubstitute Plan25 Jan 2021View
Proposed maintenance ownership plan 120 ASubstitute Plan25 Jan 2021View
Proposed drainage strategy 102 ESubstitute Plan25 Jan 2021View
Construction details sheet 2 of 2 502 ASubstitute Plan25 Jan 2021View
Hydro international downstream defender sheet 1 of 1 Rev ASubstitute Plan25 Jan 2021View
Proposed site surface water nnetwork area plan 60Substitute Plan25 Jan 2021View
Micro drainageSubstitute Plan25 Jan 2021View
Proposed site surface water network plan 60Substitute Plan11 Dec 2020View
Design settingsStatement25 Jan 2021View
NS Plastic bypass separators declaration of performanceStatement11 Dec 2020View
Micro drainageStatement11 Dec 2020View
Micro drainageStatement11 Dec 2020View
Micro drainageStatement11 Dec 2020View
Micro drainageStatement11 Dec 2020View
Micro drainageStatement11 Dec 2020View
Micro drainageStatement11 Dec 2020View
Site InvestigationStatement12 Oct 2020View
BRE365 Soakage Test Results Hole ID TP6 (Test 1)Statement12 Oct 2020View
BRE365 Method Test 1 2 3Statement12 Oct 2020View
BRE365 Method Test 1 2 3Statement12 Oct 2020View
BRE365 Method Test 1, 2, 3Statement12 Oct 2020View
Site Invesitigation Borehole No WS101Statement12 Oct 2020View
Groundwater Monitoring Results - WS102Statement12 Oct 2020View
Storm Sewer Design Criteria for Network 1.SWSStatement12 Oct 2020View
Storm Sewer Design Criteria for Network 4.SWSStatement12 Oct 2020View
Storm Sewer Design Criteria for Network 5.SWSStatement12 Oct 2020View
Miro Drainage Storm Sewer Design Criteria for Network 7.SWSStatement12 Oct 2020View
Micro Drainage Storm Sewer Design for Network 8.SWSStatement12 Oct 2020View
Storm Sewer DesignStatement12 Oct 2020View
Micro Drainage Summary of Results 100yr Return Period (Drain time 52mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100yr Return Period (Drain time 76 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100 yr Return Period (Drain time 249 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100yr Return Period (Drain time 154 mins)Statement12 Oct 2020View
Micro Drainage Summary of 100yr Results (Drain time 182 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100yr Period (Drain time 801 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100 year Period (Drain time 162 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100 year Period (Drain time 345 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100 year Period (Drain time 508 mins)Statement12 Oct 2020View
Micro Drainage Summary of Results 100 year period (Drain time 352 mins)Statement12 Oct 2020View
BRE 365 soakage test resultsSubstitute Document25 Jan 2021View
BRE 365 soakage test resultsSubstitute Document25 Jan 2021View
BRE 365 soakage test resultsSubstitute Document25 Jan 2021View
Samples of testsSubstitute Document25 Jan 2021View
BRE 365 soakage test resultsSubstitute Document25 Jan 2021View
Operation and maintenance manualSubstitute Document25 Jan 2021View
Drainage maintenance manualSubstitute Document25 Jan 2021View
Downstream defender design summarySubstitute Document25 Jan 2021View
Downstream defender design summarySubstitute Document25 Jan 2021View
Downstream defender design summarySubstitute Document25 Jan 2021View
Location of proposed BRE 365 testing 11 ASubstitute Document25 Jan 2021View
BRE 365 method testingSubstitute Document25 Jan 2021View
BRE/365 method testingSubstitute Document25 Jan 2021View
BRE 365 method testingSubstitute Document25 Jan 2021View
BRE 365 method testingSubstitute Document25 Jan 2021View
BRE 365 method testingSubstitute Document25 Jan 2021View
BRE 365 metod testingSubstitute Document25 Jan 2021View
Groundwater monitoring resultsSubstitute Document25 Jan 2021View
Groundwater monitoring results WS102Substitute Document25 Jan 2021View
Samples of testingSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Design settingsSubstitute Document25 Jan 2021View
Design settingsSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
Micro drainageSubstitute Document25 Jan 2021View
ADC DRAINAGE ENGINEER RESPONSE 02/02/21Consultation3 Feb 2021View
ADC Drainage EngineersConsultation16 Dec 2020View
WSCC Local Highway AuthorityConsultation16 Dec 2020View
ADC DRAINAGE ENGINEERS RESPONSE 16/11/20Consultation17 Nov 2020View
EoT - 5th February 2021Planning Correspondence3 Feb 2021View
Extension of timePlanning Correspondence27 Jan 2021View
CONFIRMATION OF EOT UNTIL 26/01/21Planning Correspondence20 Jan 2021View
Extension of timePlanning Correspondence12 Jan 2021View
Extensio of time - 12/01/2021Planning Correspondence17 Dec 2020View
Extension of timePlanning Correspondence11 Dec 2020View
AGREEMENT TO EOT UNTIL 9/12/20Planning Correspondence30 Nov 2020View
PLACKSystems Correspondence13 Oct 2020View
PLACKPPSystems Correspondence12 Oct 2020View
Proposed drainage strategy 102 DSuperseded Document11 Dec 2020View
Proposed maintenance ownership plan 120Superseded Document11 Dec 2020View
Construction details sheet 2 of 2 502Superseded Document11 Dec 2020View
Installation and operation guidenceSuperseded Document11 Dec 2020View
Drainage maintenance manualSuperseded Document11 Dec 2020View
File soakaway 7 factor safetySuperseded Document11 Dec 2020View
File soakaway 8 factor safetySuperseded Document11 Dec 2020View
File soakaway 9.1 factor safetySuperseded Document11 Dec 2020View
File soakaway 9.2 factor safetySuperseded Document11 Dec 2020View
File soakaway 9.3 factor safetySuperseded Document11 Dec 2020View
File soakaway 9.4 factor safetySuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
File planning networkSuperseded Document11 Dec 2020View
File planning networkSuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
File planning network fileSuperseded Document11 Dec 2020View
BRE365 Soakage test Results Hole ID TP1 (Test 1)Superseded Document12 Oct 2020View
BRE365 Soakage Test Results Hole ID TP2 (Test 1)Superseded Document12 Oct 2020View
BRE365 Soakage Test Results Hole ID TP3 (Test 1)Superseded Document12 Oct 2020View
BRE365 Soakage Test Results Hole ID TP4 (Test 1)Superseded Document12 Oct 2020View
BRE365 Soakage Test Results Hole ID TP5 (Test 1)Superseded Document12 Oct 2020View
BRE365 Soakage Test Results - Hole ID TP7 (Test 1)Superseded Document12 Oct 2020View
BRE365 Method Test 1 2 3Superseded Document12 Oct 2020View
BRE365 Method Test 1 2 3Superseded Document12 Oct 2020View
BRE365 Method Test 1 2 3Superseded Document12 Oct 2020View
Ground Water Monitoring Results - WS101Superseded Document12 Oct 2020View
Storm Sewer Design Criteria for Network 2.SWSSuperseded Document12 Oct 2020View
Storm Sewer Design Criteria for Network 3.SWSSuperseded Document12 Oct 2020View
Storm Sewer Design Criteria for Network 6.SWSSuperseded Document12 Oct 2020View
Micro Drainage Summary of Results 100 yr Return Period (Drain time 234 mins)Superseded Document12 Oct 2020View
Micro Drainage Summary of Results 100yr Return Period (Drain time 90mins)Superseded Document12 Oct 2020View
Micro Drainage Summary of Resuts 100yr Return Period (Dwg No 152)Superseded Document12 Oct 2020View
Micro Drainage Summary of 100yr Test Results (Drain time 132 mins)Superseded Document12 Oct 2020View
Proposed SIte Surface Water Network Area Plan Dwg No 60Superseded Document12 Oct 2020View
Micro Drainage Summary of Results 100yr Period (Drain time 194 mins)Superseded Document12 Oct 2020View
Micro Drainage Summary of Results 100 year Period (Drain time 110 mins)Superseded Document12 Oct 2020View
Micro Drainage Summary of Results 100 yr Period (Drain time 100 mins)Superseded Document12 Oct 2020View
Micro Drainage Summary of Results 100yr Period (Drain time 95 mins)Superseded Document12 Oct 2020View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOC Approved
Decision Decision Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.