Council planning record

Proposed discharge of condition 8 of planning approval LA08/2025/0589/F. Condition 8 states: Prior to the use of the car park commencing, the drainage network shall be constructed and laid in accordance with the details provided within the Drainage and Flood Risk Assessment contained in the Environmental Statement. The drainage network shall provide safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year storm event with an additional allowance for climate change (20%) and urban creep / expansion (10%). The drainage network shall be in conformity with the details shown on drawing nos.07 and 08 and shall include a bypass separator. Within 3 months of the construction of the drainage network a CCTV survey demonstrating that the drainage network has been constructed in accordance with the Drainage and Flood Risk Assessment shall be submitted to the Council for approval in writing.

Game of Thrones Studio Tour 245 Castlewellan Road (with access off Ballievey Road), Banbridge, BT32 3SG

Consultation OpenReference: LA08/2026/1034/DCArmagh City, Banbridge and Craigavon Borough Council

Last published check: 27 Sept 2026, 16:14. Check the council record for more recent changes.

Application location

Game of Thrones Studio Tour 245 Castlewellan Road (with access off Ballievey Road), Banbridge, BT32 3SG

This record has no verified map location.

Application summary

Status
Consultation Open
Application type
Discharge of Condition
Received
18 Sept 2026
Validated
18 Sept 2026
Determination deadline
Not published
Local authority
Armagh City, Banbridge and Craigavon Borough Council

Application overview

Proposed discharge of condition 8 of planning approval LA08/2025/0589/F. Condition 8 states: Prior to the use of the car park commencing, the drainage network shall be constructed and laid in accordance with the details provided within the Drainage and Flood Risk Assessment contained in the Environmental Statement. The drainage network shall provide safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year storm event with an additional allowance for climate change (20%) and urban creep / expansion (10%). The drainage network shall be in conformity with the details shown on drawing nos.07 and 08 and shall include a bypass separator. Within 3 months of the construction of the drainage network a CCTV survey demonstrating that the drainage network has been constructed in accordance with the Drainage and Flood Risk Assessment shall be submitted to the Council for approval in writing.

Proposal details

Reference
LA08/2026/1034/DC
Alternative references
PP-15235803
Ward
Banbridge East
Agent
Damien McLoughlin

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Application Form - Without Personal DataApplication Form22 Sept 2026View
Acknowledge ApplicationCorrespondence with Applicant/Agent/Solicitor22 Sept 2026View
CCTV Drainage ReportOther Supporting Information22 Sept 2026View
S1 4 S1 5Miscellaneous22 Sept 2026View
Interceptor S 2,7Miscellaneous22 Sept 2026View
S1 2 S1 3Miscellaneous22 Sept 2026View
S1 3 S1 6Miscellaneous22 Sept 2026View
S1 5 S1 6Miscellaneous22 Sept 2026View
S1 6 S1 7Miscellaneous22 Sept 2026View
S1 7 S1 8Miscellaneous22 Sept 2026View
S1 8 S1 9Miscellaneous22 Sept 2026View
S1 10 InterceptorMiscellaneous22 Sept 2026View
S1 9 S1 10Miscellaneous22 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Consultation expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Consultation Open
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.