Scotland · Local authority

Angus
Planning applications.

Explore collected planning applications and decisions for Angus. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
14,971Searchable applications
173Recorded as pending
96%Approval rate · 13,237 approved or refused records
508Refused applications

12,729 approved · 508 refused · 1,151 withdrawn. Received dates in our records: 12 Jun 2009 to 29 Sept 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas19 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Approved Subject to Conditions19/00146/LBC

    Replace Existing Single Glazed Windows with new Timber Double Glazed Windows to Match Existing. Replacement Roof Light

    4 Kirkton Of Kinnettles Kinnettles Forfar DD8 1TQ

    Received 26 Feb 2019
  2. Approved19/00147/FULL

    Alterations to Dwellinghouse and Formation of Dormer (Retrospective)

    7 Braeside Cottages Burnside Of Duntrune Dundee DD4 0PF

    Received 26 Feb 2019
  3. Prior Approval Not Required19/00148/PRIORN

    Prior Notification for Erection of a new Agricultural Building

    The Steading 3 Gagie Home Farm Holdings Gagie Duntrune

    Received 26 Feb 2019
  4. Approved Subject to Conditions19/00149/FULL

    Change of Use of Units to Auto Detailing Business

    Units 1 & 2 43 Lower Balmain Street Montrose DD10 8BQ

    Received 27 Feb 2019
  5. Approved19/00150/FULL

    Extension to Dwellinghouse

    8 The Glebe Liff Dundee DD2 5WE

    Received 27 Feb 2019
  6. Approved19/00151/FULL

    Extension to Rear of Detached Dwellinghouse

    48 St Brioc Way Ferryden Montrose DD10 9SS

    Received 28 Feb 2019
  7. Approved19/00152/FULL

    Proposed Rear Extension and Deck Requiring Timber Ramp for Accessibility

    7 Borrowfield Crescent Montrose DD10 9BR

    Received 28 Feb 2019
  8. Prior Approval Not Required19/00153/PRIORN

    Erection of Agricultural Storage Shed

    Livery Yard The Stables Murroes

    Received 28 Feb 2019
  9. Approved19/00154/FULL

    Alteration and Extension to Dwellinghouse

    44 Erskine Terrace Monifieth Dundee DD5 4SD

    Received 28 Feb 2019
  10. Approved19/00155/FULL

    Alterations and Extension to Dwellinghouse

    6 East Hemming Street Letham Forfar DD8 2PT

    Received 1 Mar 2019
  11. Approved Subject to Conditions19/00156/ADV

    Retrospective Advertisement of the Following Types: Fascia Signs (Illuminated and Non-Illuminated) and Car Park Sign (Non-Illuminated)

    Shop Gardyne Street Friockheim Arbroath DD11 4SG

    Received 1 Mar 2019
  12. Approved19/00157/FULL

    Formation of Dormer to Rear Roof Plane

    38 Slade Gardens Kirriemuir DD8 5AF

    Received 1 Mar 2019
  13. Approved Subject to Conditions19/00158/FULL

    Renovation and Change of Use of Former Letham Community Hub from Commercial Use to Residential Use, Demolition of Former Letham Police Office Building, & Erection of Single Storey Dwelling House with Amenity Space and Parking

    Letham Police And Community Access Office 8 East Hemming Street Letham Forfar DD8 2PT

    Received 1 Mar 2019
  14. Approved19/00159/FULL

    Erection of an Extension to an Existing Agricultural Building

    Mains Of Ardovie Farm Ardovie Brechin

    Received 1 Mar 2019
  15. Approved Subject to Conditions19/00160/FULL

    Formation of Access Road, Junctions and Associated Services Infrastructure (LDP site M7 Montrose Airfield)

    Former Montrose Airfield Charleton Road Montrose

    Received 4 Mar 2019
  16. Approved Subject to Conditions19/00161/FULL

    Erection of a Dwellinghouse

    Plot 1 Inchbare Edzell

    Received 4 Mar 2019
  17. Approved19/00162/FULL

    Erection of a Cold Store and Agricultural Storage Buildings with ancillary works

    Pluckerston Farm Logie Kirriemuir DD8 5PF

    Received 4 Mar 2019
  18. Approved19/00163/FULL

    Extension and Alterations to Dwellinghouse

    4 Murroes Place Monifieth Dundee DD5 4SU

    Received 4 Mar 2019
  19. Approved Subject to Conditions19/00164/PPPL

    Erection of a Single Dwellinghouse (Further Application for Planning Permission in Principle ref. 16/00189/PPPL)

    Land Between Nos 16 And 19 Peebles Letham Grange Arbroath

    Received 4 Mar 2019
  20. Prior Approval Not Required19/00165/PRIORN

    Prior Notification for Farm-Related Building Works (Non-Residential)

    Kirkton Of Nevay Steading Kirkton Of Nevay Newtyle

    Received 4 Mar 2019
  21. Prior Approval Not Required19/00166/PRIORN

    Prior Notification for Farm-Related Building Works (Non-Residential) - Proposed Agricultural Storage Shed

    Agricultural Buildings Kirkton Of Auchterhouse

    Received 5 Mar 2019
  22. Approved19/00167/FULL

    Demolition of Existing Conservatory to Rear of Existing Dwelling and Formation of Single Storey Extension on Existing Footprint.

    6 Roseville Place Arbroath DD11 3HD

    Received 5 Mar 2019
  23. Approved19/00168/FULL

    Alteration and Extension to Dwellinghouse

    1 Bulb Park Newtyle Blairgowrie PH12 8UZ

    Received 6 Mar 2019
  24. Approved19/00169/FULL

    Erection of a Double Garage

    Rockcliffe 2 Bankhead Road Forfar DD8 3JP

    Received 6 Mar 2019

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Angus

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Angus, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage