Council planning record

The construction and operation of a 22 bay, 400/275 kV Air Insulated substation located on a level platform and the formation of associated earthworks, access, drainage, landscaping, and security, including the creation of temporary construction compounds.

Field 500M South West Of Balkemback Farm Tealing

Application RefusedReference: 24/00699/FULNAngus

Last published check: 14 Oct 2026, 02:58. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Last Site Notice Posted Date

    Published milestoneCouncil source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Actual Committee Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source
  14. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Application Refused
Application type
Full National Application
Received
19 Nov 2024
Validated
2 Dec 2024
Determination deadline
1 Apr 2025
Local authority
Angus

Application overview

The construction and operation of a 22 bay, 400/275 kV Air Insulated substation located on a level platform and the formation of associated earthworks, access, drainage, landscaping, and security, including the creation of temporary construction compounds.

Proposal details

Reference
24/00699/FULN
Alternative references
100689257-001
Ward
Monifieth & Sidlaw

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Field 500M South West Of Balkemback Farm Tealing

This record has no verified map location.

View council map

Documents 160 of 160

DocumentPublishedAction
APPEAL NOTIFICATION TO INTERESTED PARTIESApplication Form · PDF11 Feb 2026View
REFUSEDDecision Notice · PDF6 Jan 2026View
REGULATION 31 NOTIFICATION OF DECISIONEnvironmental Impact Assessment · PDF5 Jan 2026View
AC REPORT 375/25Report · PDF17 Dec 2025View
AC REPORT 375/25Report · PDF17 Dec 2025View
AC REPORT 375/25Report · PDF17 Dec 2025View
AC REPORT 375/25Report · PDF17 Dec 2025View
AC REPORT 375/25Report · PDF17 Dec 2025View
FILE NOTE REGARDING ANGUS COUNCIL COUNTRYSIDE OFFICER COMMENTSSupporting Information · PDF1 Aug 2025View
FILE NOTE REGARDING NATURESCOT COMMENTSSupporting Information · PDF1 Aug 2025View
PRI LOCATION PLANDrawing · PDF1 Aug 2025View
PRI PASSING PLACE 01Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 02Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 03Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 04Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 05Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 06Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 07Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 08Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 09Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 10Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 11Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 12Drawing · PDF1 Aug 2025View
PRI PASSING PLACE 13Drawing · PDF1 Aug 2025View
PRI TYPICAL CONSTRUCTION DETAILSDrawing · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 1 NON TECHNICAL SUMMARYEnvironmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 2 CHAPTER 12 TRANSPORT AND ACCESSEnvironmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 3 FIGURE 12_2 CONSTRUCTION ACCESS_OUTBOUNDEnvironmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 1Environmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 2Environmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 3Environmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 4Environmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 5Environmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 6Environmental Impact Assessment · PDF1 Aug 2025View
REVISED EIA REPORT VOLUME 4 APPENDIX 12_1 TRANSPORT ASSESSMENT PART 7Environmental Impact Assessment · PDF1 Aug 2025View
STATEMENT ON ESTABLISHED NEED FOR THE PROPOSED DEVELOPMENTSupporting Information · PDF1 Aug 2025View
SUMMARY OF CHANGES TO EIA R CHAPTER 12 TRANSPORT AND ACCESS AND TRANSPORT ASSESSEnvironmental Impact Assessment · PDF1 Aug 2025View
VISIBILITY SPLAYSDrawing · PDF1 Aug 2025View
REGULATION 21 NOTICEEnvironmental Impact Assessment · PDF5 Dec 2024View
EIA REPORT: VOL 4 APP 13.5 - CUMULATIVE ASSESSMENTEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 13.4 - CONSTRUCTION NOISE IMPACE ASSESSMENTEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 13.3 - BASELINE NOISE DATAEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 13.2 - CALIBRATION CERTIFICATESEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 13.1 - ACOUSTICS GLOSSARYEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 9.3 - BIODIVERSITY NET GAIN REPORTEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 9.2 - ECOLOGY SURVEY REPORT (PART 2)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 9.2 - ECOLOGY SURVEY REPORT (PART 1)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 9.1 - DESK STUDY AND LEGAL CONTEXTEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 8.4 - DESIGNATED CULTURAL HERITAGE ASSETS WITHIN URBAN SETEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 8.3 - DESIGNATED CULTURAL HERITAGE ASSETSEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 8.2 - CULTURAL HERITAGE ASSETS IN OUTER STUDY AREAEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 8.1 - CULTURAL HERITAGE ASSETS IN THE INNER STUDY AREAEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 7.2 RESIDENTIAL AND VISUAL AMENITY ASSESSMENT (PART 3)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 7.2 RESIDENTIAL AND VISUAL AMENITY ASSESSMENT (PART 2)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 7.2 RESIDENTIAL AND VISUAL AMENITY ASSESSMENT (PART 1)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 7.1 - LVIA AND VISUALISATIONS METHODOLOGYEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP - 6.2 SCOPING OPINIONEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 6.1 - SSEN SCOPING REPORTEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 5.1 - CUMULATIVE DEVELOPMENTSEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 12.1 - TRANSPORT ASSESSMENT (PART 6)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 12.1 - TRANSPORT ASSESSMENT (PART 5)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 12.1 - TRANSPORT ASSESSMENT (PART 4)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 12.1 - TRANSPORT ASSESSMENT (PART 3)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 12.1 - TRANSPORT ASSESSMENT (PART 2)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 12.1 - TRANSPORT ASSESSMENT (PART 1)Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 11.2 - WATERCOURSE CROSSING AND BUFFERSEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 11.1 - FLOOD RISK ASSESSMENT AND OUTLINE DRAINAGE STRATEGEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 11.1 FLOOD RISK ASSESSMENT AND OUTLINE DRAINAGE STRATEGY (Environmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOL 4 APP 11.1 FLOOD RISK ASSESSMENT AND OUTLINE DRAINAGE STRATEGYEnvironmental Impact Assessment · PDF20 Nov 2024View
EIA REPORT: VOLUME 4 APPENDIX 10.1 - ORNITHOLOGY SURVEY REPORT (PART 1)Environmental Impact Assessment · PDF20 Nov 2024View
CULTURAL HERITAGE VIEWPOINT 3: CRAIG HILL, FORT AND BROCHEnvironmental Impact Assessment · PDF20 Nov 2024View
CULTURAL HERITAGE VIEWPOINT 2: BALKEMBACK COTTAGES STONE CIRCLEEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 8.4: CULTURAL HERITAGE VIEWPOINT 01 - MARTIN'S STONEEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.9 VIEWPOINT 05 NORTH OF WYNTONEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.8: VIEWPOINT 04 MYRETON OF CLAVERHOUSEEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.7: VIEWPOINT 03 BALKEMBACK COTTAGESEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.6: VIEWPOINT 02 SOUTH BALLUDERONEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.5: VIEWPOINT 01 CAIRNS-BALKELLO HILLEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.13: VIEWPOINT 09 MINOR ROAD WEST OF BALNUITHEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.12: VIEWPOINT EMMOCK ROADEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.11: VIEWPOINT 07 - INVERALDIEEnvironmental Impact Assessment · PDF20 Nov 2024View
FIGURE 7.10: VIEWPOINT 06 - NORTH OF BALNUITHEnvironmental Impact Assessment · PDF20 Nov 2024View
ACCESS ROAD PLANDrawing · PDF19 Nov 2024View
ACCESS ROAD SECTIONS DRAWINGDrawing · PDF19 Nov 2024View
CONTROL BUILDING ELEVATIONSDrawing · PDF19 Nov 2024View
CONTROL BUILDING FLOOR PLANDrawing · PDF19 Nov 2024View
CONTROL BUILDING ROOF PLANDrawing · PDF19 Nov 2024View
DESIGN AND ACCESS STATEMENTSupporting Information · PDF19 Nov 2024View
DRAINAGE LAYOUT PLANDrawing · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 - CHAPTER 1 - INTRODUCTIONEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 - CHAPTER 10 - ORNITHOLOGYEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 - CHAPTER 11 - HYDROLOGY AND HYDROGEOLOGYEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 13 - NOISE AND VIBRATIONEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 14 - CUMULATIVE EFFECTS ASSESSMENTEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 15 - SCHEDULE OF ENVIRONMENTAL MITIGATIONEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 2 - THE EIA TEAMEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 3 - DESCRIPTION OF THE PROPOSED DEVELOPMENTEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 4 - CONSIDERATION OF ALTERNATIVESEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 5 - EIA PROCESS AND METHODOLOGYEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 6 - SCOPE AND CONSULTATIONEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 7 - LANDSCAPE AND VISUAL IMPACTEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 CHAPTER 8 - CULTURAL HERITAGEEnvironmental Impact Assessment · PDF19 Nov 2024View
EIA REPORT: VOLUME 2 - CHAPTER 9 - ECOLOGYEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 1.1 LOCATION PLANEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 1.2 SUPPLEMENTARY LOCATION PLANEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 10.1.1 ORNITHOLOGICAL DESIGNATED SITESEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 11.1 HYDROLOGY STUDY AREAEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 11.2 FLOOD RISK AREAS WITHIN STUDY AREAEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 11.3 DRAINAGE LAYOUTEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 12.1 CONSTRUCTION ACCESS - INBOUNDEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 12.2 CONSTRUCTION ACCESS - OUTBOUNDEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 12.3 CONSTRUCTION ACCESS - ABNORMAL INDIVISIBLE LOADEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 12.4 TRAFFIC SURVEY LOCATIONSEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 13.1 STUDY AREA AND NOISE SENSITIVE RECEPTORSEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 13.2 NOISE MEASUREMENT LOCATIONSEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 13.3 HAUL ROAD ASSESSMENTEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 13.4 NOISE CONTOUR MAP - DAYTIMEEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 13.5 NOISE CONTOUR MAP - NIGHTTIMEEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 3.1 PROPOSED DEVELOPMENTEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 3.2 LANDSCAPE DESIGNEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 5.1 PROPOSED EMMOCK SUBSTATION CUMULATIVE DEVELOPMENTSEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.1 LANDSCAPE AND VISUAL IMPACT ASSESSMENT STUDY AREAEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.2A SUBSTATION BARE EARTH ZTV, VIEWPOINT LOCATIONS AND VISUAL RECEPTORSEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.2B SUBSTATION SCREENING ZTV, VIEWPOINT LOCATIONS AND VISUAL RECEPTORS WEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.3A LANDSCAPE CHARACTER TYPESEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.3B LANDSCAPE CHARACTER TYPES WITH SUBSTATION SCREENING ZTVEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.4A DESIGNATED LANDSCAPESEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 7.4B DESIGNATED LANDSCAPES WITH SUBSTATION SCREENING ZTVEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 8.1 CULTURAL HERITAGE: INNER STUDY AREAEnvironmental Impact Assessment · PDF19 Nov 2024View
FIGURE 8.2 DESIGNATED CULTURAL HERITAGE: OUTER STUDY AREA (BARE-EARTH ZTV)Environmental Impact Assessment · PDF19 Nov 2024View
FIGURE 8.3 DESIGNATED CULTURAL HERITAGE: OUTER STUDY AREA (WITH SCREENING ZTV)Environmental Impact Assessment · PDF19 Nov 2024View
ELECTRICAL SITE LAYOUT PLANDrawing · PDF19 Nov 2024View
LANDSCAPE ZONAL PLANDrawing · PDF19 Nov 2024View
LOCATION PLANDrawing · PDF19 Nov 2024View
PAC REPORT APPENDIX ASupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX BSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX CSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX DSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX ESupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX FSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX GSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX HSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX ISupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX JSupporting Information · PDF19 Nov 2024View
PAC REPORT APPENDIX KSupporting Information · PDF19 Nov 2024View
PRE-APPLICATION CONSULTATION (PAC) REPORT - EMMOCK 400KV SUBSTATIONSupporting Information · PDF19 Nov 2024View
PALISADE FENCE DETAILSDrawing · PDF19 Nov 2024View
PLANNING STATEMENTSupporting Information · PDF19 Nov 2024View
Application FormApplication Form · PDF19 Nov 2024View
PROPOSED SITE CROSS SECTIONS -EAST WESTDrawing · PDF19 Nov 2024View
PROPOSED SITE CROSS SECTIONS - NORTH SOUTHDrawing · PDF19 Nov 2024View
SITE ACCESS JUNCTION PLANDrawing · PDF19 Nov 2024View
SITE CLEARANCE PLANDrawing · PDF19 Nov 2024View
SITE GENERAL ARRANGEMENT PLANDrawing · PDF19 Nov 2024View
SOCIO ECONOMIC ASSESSMENT - EMMOCK SUBSTATIONSupporting Information · PDF19 Nov 2024View
SUPPLEMENTARY LOCATION PLANDrawing · PDF19 Nov 2024View
TEMPORARY CONSTRUCTION COMPOUND AND WELFARE AREA GENERAL ARRANGEMENT PLANDrawing · PDF19 Nov 2024View
TOPOGRAPHICAL SURVEY - EXISTINGDrawing · PDF19 Nov 2024View
TOPOGRAPHICAL SURVEY - PROPOSEDDrawing · PDF19 Nov 2024View
EIA REPORT: VOLUME 1 - NON-TECHNICAL SUMMARYEnvironmental Impact Assessment · PDF19 Nov 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Refused

Appeal status: Awaiting decision

REFUSED REGULATION 31 NOTIFICATION OF DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.