Erection of Two Wind Turbines of 18.5 Metres to Hub Height and 25 Metres to Blade Tip and Ancillary Development

Field 350M SE Of Leyshade Farm Leyshade Tealing

WithdrawnReference: 17/00622/FULLAngus

Last published check: 2 Oct 2026, 17:09. Check the council record for more recent changes.

Application location

Field 350M SE Of Leyshade Farm Leyshade Tealing

This record has no verified map location.

View council map

Application summary

Status
Withdrawn
Application type
Full Local Application
Received
26 Jul 2017
Validated
26 Jul 2017
Determination deadline
25 Sept 2017
Local authority
Angus

Application overview

Erection of Two Wind Turbines of 18.5 Metres to Hub Height and 25 Metres to Blade Tip and Ancillary Development

Proposal details

Reference
17/00622/FULL
Alternative references
100055689-001
Ward
Monifieth & Sidlaw

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 19 of 19

DocumentPublishedAction
WITHDRAWNDecision Notice · PDF27 Sept 2017View
APPENDIX 1 BRITWIND H15 BROCHURESupporting Information · PDF26 Jul 2017View
APPENDIX 2 H15 NOISE REPORTSupporting Information · PDF26 Jul 2017View
APPENDIX 3 MOD RESPONSE CLEAREDSupporting Information · PDF26 Jul 2017View
APPENDIX 4 FIXED LINKS RESPONSES CLEAREDSupporting Information · PDF26 Jul 2017View
FIGURE 10 CUMULATIVE PLANDrawing · PDF26 Jul 2017View
FIGURE 11 FLOOD ASSESSMENTDrawing · PDF26 Jul 2017View
FIGURE 2 SITE PLANDrawing · PDF26 Jul 2017View
FIGURE 3 SITE CONSTRAINTSDrawing · PDF26 Jul 2017View
FIGURE 4 ELEVATION DRAWINGDrawing · PDF26 Jul 2017View
PLAN VIEWDrawing · PDF26 Jul 2017View
SIDE VIEWDrawing · PDF26 Jul 2017View
FIGURE 6 WIDER STUDY AREA AND ZTVDrawing · PDF26 Jul 2017View
FIGURE 7 DETAILED STUDY AREADrawing · PDF26 Jul 2017View
FIGURE 8 VIEWPOINTS PLANDrawing · PDF26 Jul 2017View
FIGURE 9 PHOTOMONTAGES AND WIRELINESDrawing · PDF26 Jul 2017View
LOCATION PLANDrawing · PDF26 Jul 2017View
Application FormApplication Form · PDF26 Jul 2017View
SUPPORTING STATEMENTSupporting Information · PDF26 Jul 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Withdrawn
WITHDRAWN
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.