Council planning record

Erection of 2 wind turbines of 50 metres to hub height and 74 metres to blade tip, temporary anemometer mast and ancillary development

Land 600M West Of Witton Farm Lethnot Edzell

Appeal decidedReference: 14/00669/FULLAngus

Last published check: 8 Oct 2026, 21:02. Check the council record for more recent changes.

Application location

Land 600M West Of Witton Farm Lethnot Edzell

This record has no verified map location.

View council map

Application summary

Status
Appeal decided
Application type
Full Local Application
Received
8 Aug 2014
Validated
18 Aug 2014
Determination deadline
17 Oct 2014
Local authority
Angus

Application overview

Erection of 2 wind turbines of 50 metres to hub height and 74 metres to blade tip, temporary anemometer mast and ancillary development

Proposal details

Reference
14/00669/FULL
Alternative references
000096508-001
Ward
Brechin & Edzell
Agent
Roddy Yarr Consulting Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 81 of 81

DocumentPublishedAction
REFUSED SITE LAYOUT PLANDrawing · PDF5 Feb 2015View
REFUSED LOCATION PLANDrawing · PDF5 Feb 2015View
DECISION NOTICE (REFUSAL)Decision Notice · PDF5 Feb 2015View
REPORT OF HANDLINGReport · PDF4 Feb 2015View
FIGURE 4.1 LVIA 25KM STUDY AREASupporting Information · PDF29 Sept 2014View
FIGURE 4.2 SITE OF PROPOSED WINDFARMSupporting Information · PDF29 Sept 2014View
FIGURE 4.3 LANDSCAPE CHARACTER TYPESSupporting Information · PDF29 Sept 2014View
FIGURE 4.4 ZTV BARE GROUNDSupporting Information · PDF29 Sept 2014View
FIGURE 4.5 ZTV WITH TREESSupporting Information · PDF29 Sept 2014View
FIGURE 4.6 LANDSCAPE CHARACTER TYPES WITH BARE GROUND ZTVSupporting Information · PDF29 Sept 2014View
FIGURE 4.7 LANDSCAPE CHARACTER TYPES WITH TREES ZTVSupporting Information · PDF29 Sept 2014View
FIGURE 4.8 GARDENS AND DESIGNED LANDSCAPES WITH BARE GROUND ZTVSupporting Information · PDF29 Sept 2014View
FIGURE 4.9 VIEWPOINT 1 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.10 VIEWPOINT 2 EXISTING CONDITIONS AND WIRELINESupporting Information · PDF29 Sept 2014View
FIGURE 4.11 VIEWPOINT 3 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.12 VIEWPOINT 4 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.13 VIEWPOINT 5 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.14 VIEWPOINT 6 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.15 VIEWPOINT 7 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.16 VIEWPOINT 8 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.17 VIEWPOINT 9 EXISTING CONDITIONS AND WIRELINESupporting Information · PDF29 Sept 2014View
FIGURE 4.18 VIEWPOINT 10 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.19 VIEWPOINT 11 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.20 VIEWPOINT 12 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.21 VIEWPOINT 13 EXISTING CONDITIONS AND PHOTOMONTAGESupporting Information · PDF29 Sept 2014View
FIGURE 4.22 50KM CUMULATIVE WINDFARMS 50M AND ABOVESupporting Information · PDF29 Sept 2014View
FIGURE 4.23 50KM CUMULATIVE WINDFARMS BELOW 50MSupporting Information · PDF29 Sept 2014View
FIGURE 4.24 25KM CUMULATIVE WINDFARMS BELOW 50MSupporting Information · PDF29 Sept 2014View
FIGURE 4.25 CUMULATIVE ZTV GROUP 1Supporting Information · PDF29 Sept 2014View
FIGURE 4.26 CUMULATIVE ZTV GROUP 2Supporting Information · PDF29 Sept 2014View
FIGURE 4.27 CUMULATIVE ZTV GROUP 3Supporting Information · PDF29 Sept 2014View
FIGURE 4.28 CUMULATIVE ZTV GROUP 4Supporting Information · PDF29 Sept 2014View
FIGURE 4.29 CUMULATIVE ZTV GROUP 5Supporting Information · PDF29 Sept 2014View
FIGURE 4.30 CUMULATIVE NATHRO HILLSupporting Information · PDF29 Sept 2014View
FIGURE 4.31 CUMULATIVE APPROVED BELOW 50M HEIGHT ZTVSupporting Information · PDF29 Sept 2014View
FIGURE 4.32 CUMULATIVE APPROVED AND PENDING BELOW 50M HEIGHT ZTVSupporting Information · PDF29 Sept 2014View
FIGURE 4.33 VIEWPOINT 1 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.34 VIEWPOINT 3 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.35 VIEWPOINT 4 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
IGURE 4.36 VIEWPOINT 5 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.37 VIEWPOINT 6 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.38 VIEWPOINT 7 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.39 VIEWPOINT 8 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.40 VIEWPOINT 10 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.41 VIEWPOINT 11 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.42 VIEWPOINT 12 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
FIGURE 4.43 VIEWPOINT 13 CUMULATIVE WIRELINE VISUALIZATIONSupporting Information · PDF29 Sept 2014View
CONSTRIANTS PLANDrawing · PDF19 Aug 2014View
TURBINE DIMENSIONS ELEVATIONDrawing · PDF19 Aug 2014View
TURBINE FOUNDATION PLANDrawing · PDF19 Aug 2014View
CONTRACTORS COMPOUNDDrawing · PDF19 Aug 2014View
TURBINE DIMENSIONSDrawing · PDF19 Aug 2014View
MET MAST ELEVATIONDrawing · PDF19 Aug 2014View
ROAD ACCESSDrawing · PDF19 Aug 2014View
ROAD CROSS SECTIONDrawing · PDF19 Aug 2014View
SWITCH GEAR AND METER HOUSEDrawing · PDF19 Aug 2014View
CRANE PADDrawing · PDF19 Aug 2014View
TAY PLAN DIAGRAMSupporting Information19 Aug 2014View
LANDSCAPE AND VISUAL IMPACE ASSESSMENT METHODOLOGYSupporting Information · PDF19 Aug 2014View
DESIGN STATEMENTSupporting Information · PDF19 Aug 2014View
ECOLOGY (FIGURES/SUPPORTING INFORMATION)Supporting Information · PDF19 Aug 2014View
MITIGATION MEASURESSupporting Information · PDF19 Aug 2014View
APPENDIX 7 TABLE 1BASELINE SENSITIVITYSupporting Information19 Aug 2014View
APPENDIX 7 IMPACE ASESSMENTSupporting Information19 Aug 2014View
CULTURAL HERITAGE SITES WITHIN 10 METRESSupporting Information · PDF19 Aug 2014View
SITES AND MONUMENTS RECORDSupporting Information · PDF19 Aug 2014View
NOISE ASSESSMENTSupporting Information · PDF19 Aug 2014View
BOGTON ELEVATION PHOTOGRAPHSupporting Information19 Aug 2014View
BOGTON WALL STRUCTURE PHOTOGRAPHSupporting Information19 Aug 2014View
HAYES MCKENZIE NOISE PREDICTIONS AND MITIGATION REPORTSupporting Information · PDF19 Aug 2014View
SURVEYORS REPORT ON BOGTONSupporting Information · PDF19 Aug 2014View
RESIDENTIAL ASSESSMENT 2KM STUDY AREASupporting Information · PDF19 Aug 2014View
WIRELINES OF PROPERTIESSupporting Information · PDF19 Aug 2014View
COMPONENT TRANSPORT SWEPTPATH ANALYSISSupporting Information · PDF19 Aug 2014View
PORT OF ENTRYSupporting Information · PDF19 Aug 2014View
LOCAL ROAD CONNECTIONS TO SITESupporting Information · PDF19 Aug 2014View
CONSTRUCTION MATERIALS ROUTESSupporting Information · PDF19 Aug 2014View
ROUTE CONDITION SURVEYSupporting Information · PDF19 Aug 2014View
ENVIRONMENT AND PLANNING REPORTSupporting Information · PDF19 Aug 2014View
APPLICATION FORM (FULL)Application Form · PDF8 Aug 2014View
TURBINE CO-ORDINATESSupporting Information · PDF8 Aug 2014View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Decision Issued Date

    Published milestoneCouncil source
  10. Latest Neighbour Consultation Date

    Published milestoneCouncil source

Decision & conditions

Refused
DECISION NOTICE (REFUSAL)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.