Construction of a new rock revetment along the existing defence along the central Shoreham frontage facing Basin Road South. The proposed alignment follows the seaward perimeter of the existing beach crest. Construction of a new footpath along with a new beach access ramp and steps.
Land South Of Lorry Park And Adjoining Edge Of Beach Basin Road South Southwick West Sussex
Construction of a new rock revetment along the existing defence along the central Shoreham frontage facing Basin Road South. The proposed alignment follows the seaward perimeter of the existing beach crest. Construction of a new footpath along with a new beach access ramp and steps.
Reference
AWDM/0321/23
Alternative references
PP-11902656
Ward
Eastbrook
Agent
JBA Consulting
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.