Council planning record

Erection of 11 Wind Turbines, Formation of Access Tracks, Hardstandings, Substation, Control Building, Met Mast, Borrow Pit, Associated Infrastructure and Temporary Construction Compound Without Compliance with Conditions 5 (Implementation in Accordance with Approved Plans), 6 (Design and Operation of Turbines) and 18 (Micro-siting) of Planning Permission APP/2018/0993

Craigneil Windfarm Land To The North And North East Of Hillside Rickarton Stonehaven

Awaiting decisionReference: APP/2026/0965Aberdeenshire

Last published check: 28 Sept 2026, 11:04. Check the council record for more recent changes.

Application location

Craigneil Windfarm Land To The North And North East Of Hillside Rickarton Stonehaven

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Application under Section 42
Received
4 Jun 2026
Validated
4 Jun 2026
Determination deadline
Not published
Local authority
Aberdeenshire

Application overview

Erection of 11 Wind Turbines, Formation of Access Tracks, Hardstandings, Substation, Control Building, Met Mast, Borrow Pit, Associated Infrastructure and Temporary Construction Compound Without Compliance with Conditions 5 (Implementation in Accordance with Approved Plans), 6 (Design and Operation of Turbines) and 18 (Micro-siting) of Planning Permission APP/2018/0993

Proposal details

Reference
APP/2026/0965
Alternative references
100728804-001
Ward
Stonehaven And Lower Deeside
Agent
Savills (UK) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 202 of 202

DocumentPublishedAction
NATURESCOTConsultee · PDF31 Jul 2026View
SSENConsultee · PDF21 Jul 2026View
HES RESPONSEConsultee · PDF16 Jul 2026View
RESPONSE FROM MODConsultee · PDF9 Jul 2026View
RESPONSE FROM NATIONAL GAS TRASMISSIONConsultee · PDF8 Jul 2026View
DEE DISTRICT SALMON FISHERY BOARDConsultee · PDF6 Jul 2026View
SEPAConsultee · PDF3 Jul 2026View
ROADS DEVELOPMENTConsultee · PDF30 Jun 2026View
STRUCTURES TEAMConsultee · PDF26 Jun 2026View
ML EIA ADVERT FOR 26/06/2026Other · PDF26 Jun 2026View
EG EIA ADVERT FOR 26/06/2026Other · PDF26 Jun 2026View
ENVIRONMENTAL HEALTHConsultee · PDF25 Jun 2026View
CONTAMINATED LANDConsultee · PDF23 Jun 2026View
ARCHAEOLOGYConsultee · PDF23 Jun 2026View
PRESS ADVERT FOR 19/06/2026Other · PDF19 Jun 2026View
ARQIVAConsultee · PDF16 Jun 2026View
NATURAL ENVIRONMENT RESPONSEConsultee · PDF15 Jun 2026View
NATS SAFEGUARDINGConsultee · PDF12 Jun 2026View
ABERDEEN CITY COUNCILConsultee · PDF11 Jun 2026View
SCOTTISH WATERConsultee · PDF11 Jun 2026View
NATIONAL GAS TRANSMIISSIONConsultee · PDF11 Jun 2026View
BORROW PIT DESIGNReport · PDF4 Jun 2026View
FORESTRY REPORTReport · PDF4 Jun 2026View
SITE LOCATION PLANDrawing · PDF4 Jun 2026View
NON-TECHNICAL SUMMARYReport · PDF4 Jun 2026View
PLANNING AND ENERGY POLICY STATEMENTReport · PDF4 Jun 2026View
APPLICATION FORMApplication Form · PDF4 Jun 2026View
PRE-APPLICATION CONSULTATION REPORTReport · PDF4 Jun 2026View
SOCIO_ECONOMIC IMPACT ASSESSMENTReport · PDF4 Jun 2026View
VOL 1 CHAPTER 10-NOISE AND VIBRATIONReport · PDF4 Jun 2026View
VOL 1 CHAPTER 11-GEOLOGY HYDROLOGY AND HYDROGEOLOGYReport · PDF4 Jun 2026View
VOL 1 CHAPTER 12-CULTURAL HERITAGEReport · PDF4 Jun 2026View
VOL 1 CHAPTER 13-SHADOW FLICKERReport · PDF4 Jun 2026View
VOL 1 CHAPTER 14-AVIATIONReport · PDF4 Jun 2026View
VOL 1 CHAPTER 15-TELECOMMUNICATIONSReport · PDF4 Jun 2026View
VOL 1 CHAPTER 16-COMPARATIVE SUMMARY OF SIGNIFICANT EFFECTSReport · PDF4 Jun 2026View
VOL 1 CHAPTER 17-SCHEDULE OF MITIGATIONReport · PDF4 Jun 2026View
VOL 1 CHAPTER 6-LANDSCAPE AND VISUAL IMPACT ASSESSMENTReport · PDF4 Jun 2026View
VOL 1 CHAPTER 7-ECOLOGYReport · PDF4 Jun 2026View
VOL 1 CHAPTER 8-ORNITHOLOGYReport · PDF4 Jun 2026View
VOL 1 CHAPTER 9-TRANSPORT_AND_ACCESSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 3 FIGURE 3.1- CONSENTED DEVELOPMENT LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 3 FIGURE 3.2-OCTOBER 2023 LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 3 FIGURE 3.3-MARCH 2024 LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 3 FIGURE 3.4- JUNE 2024 LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 3 FIGURE 3.5-DECEMBER 2024 LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 3 FIGURE 3.6-CONSENTED DEVELOPMENT LAYOUT AND PROPOSED VARIED DReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.1-PROPOSED VARIED DEVELOPMENT LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.10-TYPICAL LIDAR COMPOUND DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.11-PRELIMINARY BORROW PIT DESIGNReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.12-TYPICAL SUBSTATION AND BESS COMPOUND DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.13-SUBSTATION AND BESS COMPOUND TYPICAL ELEVATIONSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.2-TYPICAL TURBINE DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.3-TYPICAL TURBINE FOUNDATION AND TRANSFORMER HOUSINGReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.4-TYPICAL CRANE HARDSTANDING DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.5-ACCESS JUNCTION DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.6-TYPICAL ACCESS TRACK DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.7-TYPICAL WATERCOURSE CROSSING DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4-FIGURE 4.8-MAIN CONSTRUCTION COMPOUND TYPICAL DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 4 FIGURE 4.9-COMPOUND TYPICAL DETAILSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.1-SITE LAYOUTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.10-BLADE TIP ZTV WITH LANDSCAPE CHARACTER 20KMReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.11-WILD LANDReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.12-BLADE TIP ZTV WITH LANDSCAPE DESIGNATIONSReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.13-BLADE TIP ZTV WITH LANDSCAPE DESIGNATIONS 20KMReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.14-HORIZONTAL ANGLE ZTVReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.15-PRINCIPAL VISUAL RECEPTORSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.16-PRINCIPAL VISUAL RECEPTORS 20KMReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.17-RESIDENTIAL PROPERTIESReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.18-SEQUENTIAL ROUTESReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.19-CZTV OPERATIONAL AND UNDER CONSTRUCTIONReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.2-LANDFORMReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.20 CZTV OPERATIONAL UNDER CONSTRUCTION AND CONSENTEDReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.21-CZTV OPERATIONAL UNDER CONSTRUCTION WITH GLENDYEReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.22-CZTV OPERATIONAL UNDER CONSTRUCTION CONSENTED ANDReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.23-CZTV MEIKLE CAREWEReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.24-CZTV MID HILL CLUSTERReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.3-STUDY AREA AND RECEPTOR AREAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.4-BLADE TIP ZTVReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.5-BLADE TIP ZTV A1Report · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.6-HUB HEIGHT ZTVReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.7-CUMULATIVE WIND FARMSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.8-CUMULATIVE WIND FARMS 20KMReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.9-BLADE TIP ZTV WITH LANDSCAPE CHARACTERReport · PDF4 Jun 2026View
VOL 2 CHAPTER 10 FIGURE 10.1-NOISE ASSESSMENT LOCATIONSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.1-HYDROLOGICAL CATCHMENTSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.2-PRIVATE WATER SUPPLIESReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.3-BEDROCK GEOLOGYReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.4-SUPERFICIAL GEOLOGYReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.5-PEAT DEPTH INTERPOLATIONReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.6-PEAT LANDSLIP RISK ASSESSMENTReport · PDF4 Jun 2026View
VOL 2 CHAPTER 11 FIGURE 11.7-GWDTEReport · PDF4 Jun 2026View
VOL 2 CHAPTER 12 FIGURE 12.1-KNOWN HERITAGE ASSETS WITHIN THE SITE BOUNDARYReport · PDF4 Jun 2026View
VOL 2 CHAPTER 12 FIGURE 12.2-CULTURAL HERITAGE VIEWPOINTS WITHIN THE OUTER STReport · PDF4 Jun 2026View
VOL 2 CHAPTER 13 FIGURE 13.1-SHADOW FLICKER STUDY AREAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 15 FIGURE 15.1-TELECOMMUNICATIONSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.25-COMPARATIVE BT ZTVReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.26-COMPARATIVE HUB HEIGHT ZTVReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.27-COMPARATIVE ZTV WITH LCAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.28-COMPARATIVE ZTV WITH DESIGNATIONSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.29-COMPARATIVE ZTV WITH VISUAL RECEPTORSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.30-COMPARATIVE BT ZTV WITH SEQUENTIAL ROUTESReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.31-BASELINE LIGHT POLLUTIONReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.32-AVIATION LIGHTING ZTVReport · PDF4 Jun 2026View
VOL 2 CHAPTER 6 FIGURE 6.33-AVIATION LIGHTING INTENSITYReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.1-PHASE 1 HABITAT PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.10-FISHERIES HABITAT SURVEY RESULTS PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.11-FRESHWATER PEARL MUSSEL HABITAT SURVEY RESULTS PLReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.12-OUTLINE HABITAT MANAGEMENT PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.2-NATIONAL VEGETATION CLASSIFICATION_NVC_ PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.3-BAT ACTIVITY SURVEY PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.4-TERRESTRIAL MAMMAL SURVEY PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.5-FISHERIES SURVEY SAMPLE POINTS PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.6-DESIGNATED SITES PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.7-POTENTIAL BAT ROOST FEATURES PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 7 FIGURE 7.8-TERRESTRIAL MAMMAL SURVEY RESULTSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.1-STATUTORY DESIGNATED SITES FOR NATURE CONSERVATIONReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.2-DESK STUDY RECORDSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.3-VANTAGE POINT AND VIEWSHEDS PLANReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.4-BREEDING BIRD SURVEY AREASReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.5A-TARGET SPECIES FLIGHT ACTIVITY BREEDING SEASON WAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.5B-TARGET SPECIES FLIGHT ACTIVITY BREEDING SEASON WAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.5C-TARGET SPECIES FLIGHT ACTIVITY BREEDING SEASON RAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.5D-TARGET SPECIES FLIGHT ACTIVITY NON BREEDING SEASOReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.5E-TARGET SPECIES FLIGHT ACTIVITY NON BREEDING SEASOReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.5F-TARGET SPECIES FLIGHT ACTIVITY NON BREEDING SEASOReport · PDF4 Jun 2026View
VOL 2 CHAPTER 8 FIGURE 8.6-MOORLAND BREEDING BIRD SURVEY MBBS RESULTSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 9 FIGURE 9.1-STUDY AREAReport · PDF4 Jun 2026View
VOL 2 CHAPTER 9 FIGURE 9.2-TRAFFIC COUNT LOCATIONSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 9 FIGURE 9.3-PERSONAL INJURY ACCIDENT LOCATIONSReport · PDF4 Jun 2026View
VOL 2 CHAPTER 9 FIGURE 9.4- ABNORMAL INDIVISIBLE LOADS DELIVERY ROUTEReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.34A-M-VIEWPOINT 1-DURRIS FOREST CAIRN MON EARNReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.35A-K-VIEWPOINT 2-A957 MILLSBURNReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.36A-I-VIEWPOINT 3-A967 RICKARTONReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.37A-J-VIEWPOINT 4-ELSICK MOUNTH AUQUHOLLIE WOODReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.38A-H-VIEWPOINT 5-HILL OF SWANLEYReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.39A-I-VIEWPOINT 6-A90 A92 STONEHAVENReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.40A-H-VIEWPOINT 7-STONEHAVEN HARBOURReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.41A-J-VIEWPOINT 8-STONEHAVEN WAR MEMORIALReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.42A-J-VIEWPOINT 9-MINOR ROAD EAST OF BRUXIE HILLReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.43A-H-VIEWPOINT 10-NETHERLEYReport · PDF4 Jun 2026View
DESIGN STATEMENTReport · PDF4 Jun 2026View
VOL 1 CHAPTER 1-INTRODUCTIONReport · PDF4 Jun 2026View
VOL 1 CHAPTER 2-SITE DESCRIPTIONReport · PDF4 Jun 2026View
VOL 1 CHAPTER 3-DESIGN EVOLUTIONReport · PDF4 Jun 2026View
VOL 1 CHAPTER 4-DESCRIPTION OF PROPOSED VARIED DEVELOPMENTReport · PDF4 Jun 2026View
VOL 1 CHAPTER 5-EIA METHODOLOGYReport · PDF4 Jun 2026View
VOL 3 CHAPTER 12 FIGURE 12.3A-I-VIEWPOINT 1 CAIRN MON EARN CAIRN SM4892Report · PDF4 Jun 2026View
VOL 3 CHAPTER 12 FIGURE 12.4A-G-VIEWPOINT 2-VIEW FROM SM983 NETHER AUQUHOLLIEReport · PDF4 Jun 2026View
VOL 3 CHAPTER 12 FIGURE 12.5A-G-VIEWPOINT 3-VIEW LOOKING TOWARDS SM983Report · PDF4 Jun 2026View
VOL 3 CHAPTER 12 FIGURE 12.6A-I-VIEWPOINT 4-ELSICK MOUNTH ROAD HA9NO89SW0096Report · PDF4 Jun 2026View
VOL 3 CHAPTER 12 FIGURE 12.7A-M-VIEWPOINT 5-EASTER AUQUHOLLIE CAIRN HA11Report · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.44A-G-VIEWPOINT 11-COOKLEYReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.45A-H-VIEWPOINT 12-A92 NEAR NEWTONHILLReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.46A-G-VIEWPOINT 13-PORTLETHENReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.47A-H-VIEWPOINT 14-B979 NEAR MARYCULTERReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.48A-H- VIEWPOINT 15-A93 MILLTIMBERReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.49A-H-VIEWPOINT 16-PETERCULTERReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.50A-I-VIEWPOINT 17-DRUMOAKReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.51A-I-VIEWPOINT 18-B979 BETWEEN WESTHILL AND PETERCUReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.52A-H-VIEWPOINT 19-WESTHILLReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.53A-J-VIEWPOINT 20-MEIKLE TAP HILL OF FAREReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.54A-I-VIEWPOINT 21-SCOLTY HILLReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.55A-J-VIEWPOINT 22-CLACHNABENReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.56A-J-VIEWPOINT 23-CAIRN O MOUNTReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.57A-H-VIEWPOINT 24-GARVOCK HILL VIEWPOINTReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.58A-E-VIEWPOINT W1 DRUM CASTLEReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.59A-E-VIEWPOINT W2 BANCHORYReport · PDF4 Jun 2026View
VOL 3 CHAPTER 6 FIGURE 6.60A-E-VIEWPOINT W3 CRATHES CASTLEReport · PDF4 Jun 2026View
VOL 4 CHAPTER 10 TECHNICAL APPENDIX 10.1-ENVIRONMENTAL NOISE ASSESSMENTReport · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1-PEAT LANDSLIDE RISK ASSESSMENTReport · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1-PLRA APPENDIX A DRAWINGS 378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1-PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.1 PLRA APPENDIX A-DRAWINGS_378977_GIS0Report · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.2 OUTLINE PEAT MANAGEMENT PLANReport · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.2 PEAT MANAGEMENT PLAN APPENDIX A-DRAWReport · PDF4 Jun 2026View
VOL 4 CHAPTER 11 TECHNICAL APPENDIX 11.3 CARBON BALANCE ASSESSMENTReport · PDF4 Jun 2026View
VOL 4 CHAPTER 12 TECHNICAL APPENDIX 12.1 CULTURAL HERITAGE BASELINE AND STAGEReport · PDF4 Jun 2026View
VOL 4 CHAPTER 12 TECHNICAL APPENDIX 12.2 CULTURAL HERITAGE GAZETTEERReport · PDF4 Jun 2026View
VOL 4 CHAPTER 14 TECHNICAL APPENDIX 14.1 WIND FARM AVIATION LIGHTING AND MITIReport · PDF4 Jun 2026View
VOL 4 CHAPTER 6 TECHNICAL APPENDIX 6.1 LVIA AND COMPARATIVE LVIA METHODOLOGYReport · PDF4 Jun 2026View
VOL 4 CHAPTER 6 TECHNICAL APPENDIX 6.2 LVIA OF PROPOSED VARIED DEVELOPMENTReport · PDF4 Jun 2026View
VOL 4 CHAPTER 6 TECHNICAL APPENDIX 6.3 RESIDENTIAL VISUAL AMENITY ASSESSMENTReport · PDF4 Jun 2026View
VOL 4 CHAPTER 6 TECHNICAL APPENDIX 6.4 REPORT ON LIGHT PROPAGATION FROM THE AReport · PDF4 Jun 2026View
VOL 4 CHAPTER 7 TECHNICAL APPENDIX 7.1 HABITATS AND VEGETATIONReport · PDF4 Jun 2026View
VOL 4 CHAPTER 7 TECHNICAL APPENDIX 7.2 BAT ACTIVITY SURVEY 2023Report · PDF4 Jun 2026View
VOL 4 CHAPTER 7 TECHNICAL APPENDIX 7.3 TERRESTRIAL MAMMALSReport · PDF4 Jun 2026View
VOL 4 CHAPTER 7 TECHNICAL APPENDIX 7.4 FISHERIESReport · PDF4 Jun 2026View
VOL 4 CHAPTER 7 TECHNICAL APPENDIX 7.5 OUTLINE HABITAT MANAGEMENT PLANReport · PDF4 Jun 2026View
VOL 4 CHAPTER 8 TECHNICAL APPENDIX 8.1 ORNITHOLOGY BASELINE REPORTReport · PDF4 Jun 2026View
VOL 4 CHAPTER 8 TECHNICAL APPENDIX 8.2 COLLISION RISK MODELLING CALCULATIONSReport · PDF4 Jun 2026View
VOL 4 CHAPTER 8 TECHNICAL APPENDIX 8.4 INFORMATION ON HABITAT REGULATIONS ASSReport · PDF4 Jun 2026View
VOL 4 CHAPTER 9 TECHNICAL APPENDIX 9.1 TRANSPORT ASSESSMENTReport · PDF4 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Expiry Date for Comment

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.