Council planning record

Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

Peterhead, Persley And Kintore

PendingReference: 260495/S37Aberdeen City

Last published check: 27 Sept 2026, 16:20. Check the council record for more recent changes.

Application location

Peterhead, Persley And Kintore

This record has no verified map location.

View council map

Application summary

Status
Pending
Application type
Consultation (S.37 Electricity Act)
Received
Not published
Validated
29 Apr 2026
Determination deadline
28 Jun 2026
Local authority
Aberdeen City

Application overview

Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

Proposal details

Reference
260495/S37

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Scoping ReportOther · PDF29 Apr 2026View
Scoping Report, Appendix A, Figures 7.4, 7.5Other · PDF29 Apr 2026View
Scoping Report Appendix A, Figures 7.1, 7.3Other · PDF29 Apr 2026View
Scoping Report Appendix A, Figures 5.1-5.2Other · PDF29 Apr 2026View
Scoping Report Appendix A, Figures 2.1-2.3Other · PDF29 Apr 2026View
Scoping Report Appendix A, Figure 4.2Other · PDF29 Apr 2026View
Scoping Report Appendix A, Figure 4.1Other · PDF29 Apr 2026View
Scoping Report Appendix A, Figure 10.1-10.3Other · PDF29 Apr 2026View
Appendix A, Figure 7.2 - Surface Water Features and Flood RiskOther · PDF29 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated Date

    Published milestoneCouncil source
  2. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.