Council planning record

Outline Planning Application with all matters reserved for the phased development of up to 191.16 hectares at ‘land north east of Worcestershire Parkway Railway Station’ (Town Centre). Works to include necessary demolition, site clearance and engineering works to create development platforms; the provision of residential development (C3) including senior living (C2/C3) and a hotel (C1); the provision of mixed use floorspace (E, F1, F2 and compatible sui generis uses); education facilities including primary, secondary, post-16 provision and a SEND school (F1); delivery of green and blue infrastructure including a Community Park, woodland, strategic sports provision, parks and recreation grounds; the creation of an internal transport network with connections to the surrounding highway, cycle and pedestrian network, to include a link to the A44 and safeguarding land for a new all modes bridge to the town centre and an active travel pass under the B4084; the retention/stopping up/diversion of existing public rights of way and creation of new routes; and all associated works including connections to existing power and waste network.

Land At (Os 8995 5086) Pershore Road Norton Worcester

PendingReference: W/25/02814/OUTWychavon District Council

Last published check: 21 Oct 2026, 04:48. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Consultation Start Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Pending
Application type
Outline Application
Received
22 Dec 2025
Validated
8 Jan 2026
Determination deadline
Not published
Local authority
Wychavon District Council

Application overview

Outline Planning Application with all matters reserved for the phased development of up to 191.16 hectares at ‘land north east of Worcestershire Parkway Railway Station’ (Town Centre). Works to include necessary demolition, site clearance and engineering works to create development platforms; the provision of residential development (C3) including senior living (C2/C3) and a hotel (C1); the provision of mixed use floorspace (E, F1, F2 and compatible sui generis uses); education facilities including primary, secondary, post-16 provision and a SEND school (F1); delivery of green and blue infrastructure including a Community Park, woodland, strategic sports provision, parks and recreation grounds; the creation of an internal transport network with connections to the surrounding highway, cycle and pedestrian network, to include a link to the A44 and safeguarding land for a new all modes bridge to the town centre and an active travel pass under the B4084; the retention/stopping up/diversion of existing public rights of way and creation of new routes; and all associated works including connections to existing power and waste network.

Proposal details

Reference
W/25/02814/OUT
Ward
Upton Snodsbury Ward, Drakes Broughton, Norton & Whittington Ward
Parish
White Ladies Aston , Whittington , Norton Juxta Kempsey , Stoulton
Agent
Mr Dakin, Montagu Evans LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land At (Os 8995 5086) Pershore Road Norton Worcester

This record has no verified map location.

Documents 260 of 260

DocumentPublishedAction
Application form01. Application Form22 Dec 2025View
3. Cover Letter - Town Centre02. Supporting Information22 Dec 2025View
7. Outline Development Specification - Town Centre02. Supporting Information22 Dec 2025View
8. Statement of Community Involvement02. Supporting Information22 Dec 2025View
9. Design Access Statement - Town Centre Lowres02. Supporting Information22 Dec 2025View
10. Planning Statement - Town Centre02. Supporting Information22 Dec 2025View
13. Green Infrastrcuture Strategy V5 Lr02. Supporting Information22 Dec 2025View
15. Education Report02. Supporting Information22 Dec 2025View
16. Utilities Planning Statement - Town Centre02. Supporting Information22 Dec 2025View
18. Framework Travel Plan02. Supporting Information22 Dec 2025View
Environmental Statement Non Technical Summary Part102. Supporting Information22 Dec 2025View
Environmental Statement Non Technical Summary Part202. Supporting Information22 Dec 2025View
Environmental Statement Vol. 1 Front Cover And Contents02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 1 Introduction02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 2 Eia Approach02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 3 Sites And Surroundings02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 4 The Proposed Developments02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 5 Transport And Accessibility02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 6 Air Quality Part102. Supporting Information22 Dec 2025View
Environmental Statement Chapter 6 Air Quality Part202. Supporting Information22 Dec 2025View
Environmental Statement Chapter 7 Noise And Vibration02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 8 Biodiversity02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 9 Landscape And Visual02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 10 Built Heritage02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 11 Archaeology02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 12 Hydrology02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 13 Socio Economics And Human Health02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 14 Climate Change02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 15 Agricultural Land02. Supporting Information22 Dec 2025View
Environmental Statement Chapter 16 Summary Of Residual Effects02. Supporting Information22 Dec 2025View
Environmental Statement Glossary Of Terms02. Supporting Information22 Dec 2025View
Environmental Statement Vol. 2 Front Cover02. Supporting Information22 Dec 2025View
Environmental Statement Figure 1.1 Location Of Sites02. Supporting Information22 Dec 2025View
Environmental Statement Figure 1.2 Town Centre Site Boundary02. Supporting Information22 Dec 2025View
Environmental Statement Figure 1.3 Southern Neighbourhood Site Boundary02. Supporting Information22 Dec 2025View
Environmental Statement Figure 3.1 Site Context02. Supporting Information22 Dec 2025View
Environmental Statement Figure 4.1 Cumulative Developments (inside)02. Supporting Information22 Dec 2025View
Environmental Statement Figure 4.2 Cumulative Developments (outside)02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.1 Landform And Drainage02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.2 Land Use And Vegetation02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.3 Designations And Important Features02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.4 Landscape Character02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.5 Landscape Receptors02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.6 Visual Baseline Town Centre Site02. Supporting Information22 Dec 2025View
Environmental Statement Figure 9.7 Visual Baseline Southern Neighbourhood Site02. Supporting Information22 Dec 2025View
Environmental Statement Figure 10.1 Heritage Asset Plan02. Supporting Information22 Dec 2025View
Environmental Statement Figure 12.1 Study Area02. Supporting Information22 Dec 2025View
Environmental Statement Figure 12.2 Flood Zones02. Supporting Information22 Dec 2025View
Environmental Statement Figure 13.1 Study Area Plan02. Supporting Information22 Dec 2025View
Environmental Statement Vol. 3 Front Cover And Contents02. Supporting Information22 Dec 2025View
1.1 Site And Allocation Boundaries02. Supporting Information22 Dec 2025View
2.1a Eia Scoping Covering Letter02. Supporting Information22 Dec 2025View
2.1b Eia Scoping Report C1-502. Supporting Information22 Dec 2025View
2.1c Eia Scoping Report C6 Transport02. Supporting Information22 Dec 2025View
2.1d Eia Scoping Report C7 Air Quality02. Supporting Information22 Dec 2025View
2.1e Eia Scoping Report C8 Noise And Vibration02. Supporting Information22 Dec 2025View
2.1f Eia Scoping Report C9 Biodiversity02. Supporting Information22 Dec 2025View
2.1g Eia Scoping Report C10 Landscape And Visual02. Supporting Information22 Dec 2025View
2.1h Eia Scoping Report C11 Built Heritage02. Supporting Information22 Dec 2025View
2.1i Eia Scoping Report C12 Archaeology02. Supporting Information22 Dec 2025View
2.1j Eia Scoping Report C13 Hydrology02. Supporting Information22 Dec 2025View
2.1k Eia Scoping Report C14 Socio Economics02. Supporting Information22 Dec 2025View
2.1l Eia Scoping Report C15 Climate Change02. Supporting Information22 Dec 2025View
2.1m Eia Scoping Report C16 Agricultural Land02. Supporting Information22 Dec 2025View
2.1n Eia Scoping Report C17 Summary02. Supporting Information22 Dec 2025View
2.1o Eia Scoping Report Appendix 2.102. Supporting Information22 Dec 2025View
2.1p Eia Scoping Report Appendix 3.102. Supporting Information22 Dec 2025View
2.1q Eia Scoping Report Appendix 5.102. Supporting Information22 Dec 2025View
2.1r Eia Scoping Report Appendix 5.202. Supporting Information22 Dec 2025View
2.1s Eia Scoping Report Appendix 8.102. Supporting Information22 Dec 2025View
2.1t Eia Scoping Report Appendix 11.102. Supporting Information22 Dec 2025View
2.2 Eia Scoping Opinion02. Supporting Information22 Dec 2025View
4.1 Schedule Of Mitigation02. Supporting Information22 Dec 2025View
4.2 TCS Existing Features For Retention And Removal02. Supporting Information22 Dec 2025View
4.3 TCS Land Use Parameter Plan02. Supporting Information22 Dec 2025View
4.4 TCS Movement And Access Parameter Plan02. Supporting Information22 Dec 2025View
4.5 TCS Green And Blue Infrastructure Parameter Plan02. Supporting Information22 Dec 2025View
4.6 TCS Building Heights Parameter Plan02. Supporting Information22 Dec 2025View
4.7 SNS Existing Features For Retention And Removal02. Supporting Information22 Dec 2025View
4.8 SNS Land Use Parameter Plan02. Supporting Information22 Dec 2025View
4.9 SNS Movement And Access Parameter Plan02. Supporting Information22 Dec 2025View
4.10 SNS Green And Blue Infrastructure Parameter Plan02. Supporting Information22 Dec 2025View
4.11 SNS Building Heights Parameter Plan02. Supporting Information22 Dec 2025View
4.12 Combined Framework Masterplan02. Supporting Information22 Dec 2025View
5.1 Transport Assessment Part102. Supporting Information22 Dec 2025View
5.1 Transport Assessment Part202. Supporting Information22 Dec 2025View
5.1 Transport Assessment Part302. Supporting Information22 Dec 2025View
5.1 Transport Assessment Part402. Supporting Information22 Dec 2025View
5.1 Transport Assessment Part502. Supporting Information22 Dec 2025View
5.1 Transport Assessment Part602. Supporting Information22 Dec 2025View
5.2 Framework Travel Plan02. Supporting Information22 Dec 2025View
5.3 Summary Of Link Receptor Sensitivity02. Supporting Information22 Dec 2025View
5.4 Construction Routing Assumptions02. Supporting Information22 Dec 2025View
5.5a Construction Phase Calculations02. Supporting Information22 Dec 2025View
5.5b Construction Phase Calculations02. Supporting Information22 Dec 2025View
5.6a IEMA Rule 1 And 2 Screening (ds1)02. Supporting Information22 Dec 2025View
5.6b IEMA Rule 1 And 2 Screening (ds2)02. Supporting Information22 Dec 2025View
5.6c IEMA Rule 1 And 2 Screening (ds3)02. Supporting Information22 Dec 2025View
5.7 Assessment Of Severance02. Supporting Information22 Dec 2025View
5.8 Assessment Of NMU Delay02. Supporting Information22 Dec 2025View
5.9 Assessment Of NMU Amenity02. Supporting Information22 Dec 2025View
5.10 Assessment Of Fear And Intimidation02. Supporting Information22 Dec 2025View
6.1 Construction Dust Guidance (2024)02. Supporting Information22 Dec 2025View
6.2 Epuk And Iaqm Guidance (2017) Screening Criteria02. Supporting Information22 Dec 2025View
6.3 Traffic Emissions Modelling Inputs And Results Processing02. Supporting Information22 Dec 2025View
6.4 Model Verification02. Supporting Information22 Dec 2025View
6.5 Background Concentrations02. Supporting Information22 Dec 2025View
6.6 Predicted And Future Baselines Concentrations And Deposition02. Supporting Information22 Dec 2025View
6.7 Human Receptor Impacts Ds2 Scenario (tcs)02. Supporting Information22 Dec 2025View
6.8 Human Receptor Impacts Ds1 Scenario (sns)02. Supporting Information22 Dec 2025View
6.9 Human Receptor Impacts Ds3 Scenario (tcs And Sns)02. Supporting Information22 Dec 2025View
6.10 Ecological Receptor Impacts Ds2 Scenario (tcs)02. Supporting Information22 Dec 2025View
6.11 Ecological Receptor Impacts Ds1 Scenario (sns)02. Supporting Information22 Dec 2025View
6.12 Ecological Receptor Impacts Ds3 Scenario (tcs And Sns)02. Supporting Information22 Dec 2025View
7.1 Glossary02. Supporting Information22 Dec 2025View
7.2 Legislation Policy And Guidance02. Supporting Information22 Dec 2025View
7.3 Baseline Survey Methodology02. Supporting Information22 Dec 2025View
7.4 Assessment Methodology02. Supporting Information22 Dec 2025View
7.5 Road Traffic Data02. Supporting Information22 Dec 2025View
7.6 Noise Time History Charts02. Supporting Information22 Dec 2025View
8.1 2024 Ecological Desk Study Report02. Supporting Information22 Dec 2025View
8.2 Ecological Appraisal Report02. Supporting Information22 Dec 2025View
8.3 Hedgerow Survey Report02. Supporting Information22 Dec 2025View
8.4 Botanical Survey Table02. Supporting Information22 Dec 2025View
8.4 Grassland Survey Compartments Plan02. Supporting Information22 Dec 2025View
8.6 Bat Survey Report02. Supporting Information22 Dec 2025View
8.7 Breeding And Wintering Bird Assessment02. Supporting Information22 Dec 2025View
8.8 Dormouse Survey Report02. Supporting Information22 Dec 2025View
8.9 Great Crested Newt Edna And Hsi Report02. Supporting Information22 Dec 2025View
8.10 Invertebrate Survey Report02. Supporting Information22 Dec 2025View
8.11 Reptile Survey Report02. Supporting Information22 Dec 2025View
8.12 Water Vole And Otter Report02. Supporting Information22 Dec 2025View
9.1 LVIA Methodology02. Supporting Information22 Dec 2025View
9.2 LVIA Baseline Conditions02. Supporting Information22 Dec 2025View
9.3.1 LVIA Assessment Tables Landscape And Visual Sensitivity02. Supporting Information22 Dec 2025View
9.3.2 LVIA Assessment Tables Town Centre Effects02. Supporting Information22 Dec 2025View
9.3.3 LVIA Assessment Tables Southern Neighbourhood Effects02. Supporting Information22 Dec 2025View
9.3.4 LVIA Assessment Tables Combined Effects02. Supporting Information22 Dec 2025View
9.4 LVIA Supporting Photographs (viewpoints 1 16)02. Supporting Information22 Dec 2025View
9.4 LVIA Supporting Photographs (viewpoints 17 47)02. Supporting Information22 Dec 2025View
9.5 LVIA Supporting Photomontages Part102. Supporting Information22 Dec 2025View
9.5 LVIA Supporting Photomontages Part202. Supporting Information22 Dec 2025View
9.5 LVIA Supporting Photomontages Part302. Supporting Information22 Dec 2025View
9.6 Bmd Landscape Proposals02. Supporting Information22 Dec 2025View
10.1 Heritage Assessment02. Supporting Information22 Dec 2025View
11.1 Archaeological Dba02. Supporting Information22 Dec 2025View
12.1 Flood Risk Assessment Part 102. Supporting Information22 Dec 2025View
12.1 Flood Risk Assessment Part 202. Supporting Information22 Dec 2025View
12.2 Drainage Strategy02. Supporting Information22 Dec 2025View
12.2 App A Site Location Plan02. Supporting Information22 Dec 2025View
12.2 App B Topo Survey02. Supporting Information22 Dec 2025View
12.2 App C.1 Surface Water Plan02. Supporting Information22 Dec 2025View
12.2 App C.2 Existing Catchments02. Supporting Information22 Dec 2025View
12.2 App C.3 Flood Conveyance02. Supporting Information22 Dec 2025View
12.2 App D Attenuation Feature Details02. Supporting Information22 Dec 2025View
12.2 App E.1 Catchment A Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App E.2 Catchment B And C Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App E.3 Catchment D Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App E.4 Catchment E And F Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App E.5 Catchment G Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App E.6 Catchment H Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App E.7 School Areas Sw Drainage Report02. Supporting Information22 Dec 2025View
12.2 App F Proposed Foul Drainage02. Supporting Information22 Dec 2025View
13.1 Eia Scoping Correspondence Re. Healthcare02. Supporting Information22 Dec 2025View
15.1 Maff Agricultural Land Classification02. Supporting Information22 Dec 2025View
15.2 Wychavon Town Sns Agricultural Land Classification02. Supporting Information22 Dec 2025View
15.3 Outline Soil Resource Management Plan02. Supporting Information22 Dec 2025View
17. Transport Assessment Part102. Supporting Information22 Dec 2025View
17. Transport Assessment Part202. Supporting Information22 Dec 2025View
17. Transport Assessment Part302. Supporting Information22 Dec 2025View
12. Arboricultural Impact Assessment02. Supporting Information22 Dec 2025View
20. Geotechnical Report Town Centre Part102. Supporting Information22 Dec 2025View
20. Geotechnical Report Town Centre Part202. Supporting Information22 Dec 2025View
20. Geotechnical Report Town Centre Part302. Supporting Information22 Dec 2025View
20. Geotechnical Report Town Centre Part402. Supporting Information22 Dec 2025View
21. Preliminary Mineral Resource Assessment - Town Centre02. Supporting Information22 Dec 2025View
22. Lighting Assessment - Town Centre02. Supporting Information22 Dec 2025View
23. Economic And Social Benefits Statement02. Supporting Information22 Dec 2025View
24. Sustainability Energy - Town Centre02. Supporting Information22 Dec 2025View
25. Town Centre Delivery Strategy Part102. Supporting Information22 Dec 2025View
25. Town Centre Delivery Strategy Part202. Supporting Information22 Dec 2025View
26. Health Impact Assessment02. Supporting Information22 Dec 2025View
Ground Investigation Report02. Supporting Information10 Aug 2026View
Response To Drainage Comments02. Supporting Information10 Aug 2026View
Drainage Strategy02. Supporting Information10 Aug 2026View
Appendix D1.3 Drainage Strategy Non Technical Summary Rev A02. Supporting Information10 Aug 2026View
14. Statutory Bng Metric Town Centre. xlsmBiodiversity Net Gain Metric22 Dec 2025View
14. Bng Report - Town CentreBiodiversity Net Gain Supporting Info.22 Dec 2025View
Site Location Plan04. Site/Location Plan22 Dec 2025View
Town Centre Parameter Plan Movement And Access06a. Plans-Other22 Dec 2025View
Town Centre Parameter Plan Building Heights Pp06a. Plans-Other22 Dec 2025View
Town Centre Parameter Plan Green And Blue Infra Pp06a. Plans-Other22 Dec 2025View
Town Centre Parameter Plan Land Use Pp06a. Plans-Other22 Dec 2025View
Town Centre Existing Features For Retention And Removal Tc06a. Plans-Other22 Dec 2025View
Illustrative Concept Masterplan Town Centre06a. Plans-Other22 Dec 2025View
Illustrative Concept Masterplan06a. Plans-Other22 Dec 2025View
Andy Long 4 Sydgate, Mill Lane, Wadborough, WORCESTER, WR8 9HD08. Response - Neighbour and Other18 Jan 2026View
George Capell The Old Rectory, Upton Snodsbury, Broughton Hackett, WORCESTER, WR7 4BA08. Response - Neighbour and Other23 Jan 2026View
J Devonshire, 37 St Peters Close, Evesham, WR11 1EW08. Response - Neighbour and Other6 Feb 2026View
R Holmes Whiteoaks, Mill Lane, Wadborough, WORCESTER, WR8 9HQ08. Response - Neighbour and Other11 Feb 2026View
Jeremy Washington Saunders The Meadows, Box Bush Drive, Stoulton, WORCESTER, WR7 4RG08. Response - Neighbour and Other16 Feb 2026View
Jeremy Washington Saunders The Meadows, Box Bush Drive, Stoulton, WORCESTER, WR7 4RG08. Response - Neighbour and Other16 Feb 2026View
Matthew Stafford Norton Hall Lodge, Pershore Road, High Park, Whittington, WORCESTER, WR5 2RS08. Response - Neighbour and Other16 Feb 2026View
Wadborough Residents Association08. Response - Neighbour and Other20 Feb 2026View
Richard Percival Woodland Cottage, Station Road, Wadborough, WORCESTER, WR8 9HA08. Response - Neighbour and Other1 Mar 2026View
Peter Harrison Wood Cottage, Station Road, Wadborough, WORCESTER, WR8 9HL08. Response - Neighbour and Other1 Mar 2026View
Christian Joseph Evans 29 Great Oaty Gardens, Worcester08. Response - Neighbour and Other9 Mar 2026View
Marianne Vincent Kroma House, Mill Lane, Wadborough, WORCESTER, WR8 9HB08. Response - Neighbour and Other9 Apr 2026View
John Driscoll Somersfield House, Wadborough, WORCESTER, WR8 9HH08. Response - Neighbour and Other23 Apr 2026View
Carole Belle Vue, Wadborough, WORCESTER, WR8 9HH08. Response - Neighbour and Other23 Apr 2026View
Mark Williams Narrow Wood Farm, Station Road, Wadborough, WORCESTER, WR8 9HA08. Response - Neighbour and Other23 Apr 2026View
George Capell08a. Response - Neighbour and Other Attachment23 Jan 2026View
R Holmes08a. Response - Neighbour and Other Attachment11 Feb 2026View
Jeremy Washington Saunders08a. Response - Neighbour and Other Attachment16 Feb 2026View
Matthew Stafford08a. Response - Neighbour and Other Attachment16 Feb 2026View
Wadborough Residents Association08a. Response - Neighbour and Other Attachment20 Feb 2026View
Harrislamb - On behalf of Mucknell Abbey08a. Response - Neighbour and Other Attachment24 Feb 2026View
Mark Williams08a. Response - Neighbour and Other Attachment23 Apr 2026View
Hereford & Worcester Fire Service09. Response - Statutory Consultee19 Jan 2026View
Worcestershire Regulatory Services - Cont. Land - Worcestershire Regulatory Services09. Response - Statutory Consultee20 Jan 2026View
Network Rail09. Response - Statutory Consultee20 Jan 2026View
WCC LLFA Planning Consultation - WCC Lead Local Flood Authority09. Response - Statutory Consultee27 Jan 2026View
WCC - Education09. Response - Statutory Consultee29 Jan 2026View
Landscape Officer comments09. Response - Statutory Consultee3 Feb 2026View
Drainage Engineer - Engineers - S.W. Land Drainage Partnership09. Response - Statutory Consultee4 Feb 2026View
Worcestershire Regulatory Services - Air Quality - Worcestershire Regulatory Services09. Response - Statutory Consultee4 Feb 2026View
Housing Team - WDC - Housing - WDC09. Response - Statutory Consultee5 Feb 2026View
Delegated Commissioning Team - NHS Herefordshire & Worcs Integrated Care Board09. Response - Statutory Consultee6 Feb 2026View
Norton Juxta Kempsey Parish Council09. Response - Statutory Consultee9 Feb 2026View
Policy Comments09. Response - Statutory Consultee12 Feb 2026View
WRS - Noise09. Response - Statutory Consultee16 Feb 2026View
WRS - Noise09. Response - Statutory Consultee16 Feb 2026View
Conservation Officer - Conservation Officer09. Response - Statutory Consultee20 Mar 2026View
Worcester Civic Society09. Response - Statutory Consultee23 Mar 2026View
Aidan Smyth - WDC - Archaeology & Planning Advisor09. Response - Statutory Consultee24 Mar 2026View
WCC LLFA Planning Consultation - WCC Lead Local Flood Authority09. Response - Statutory Consultee25 Aug 2026View
Drainage Engineer - Engineers - S.W. Land Drainage Partnership09. Response - Statutory Consultee4 Sept 2026View
Midlands Region - National Highways09. Response - Statutory Consultee14 Sept 2026View
Worcestershire Regulatory Services - Cont. Land09a. Response - Statutory Consultee Attachment20 Jan 2026View
WCC LLFA Planning Consultation09a. Response - Statutory Consultee Attachment27 Jan 2026View
Worcestershire Regulatory Services - Air Quality09a. Response - Statutory Consultee Attachment4 Feb 2026View
Housing Team - WDC09a. Response - Statutory Consultee Attachment5 Feb 2026View
Delegated Commissioning Team09a. Response - Statutory Consultee Attachment6 Feb 2026View
Worcestershire County Council (Public Paths)09a. Response - Statutory Consultee Attachment9 Feb 2026View
Environment Agency09a. Response - Statutory Consultee Attachment11 Feb 2026View
Environment Agency - Guidance09a. Response - Statutory Consultee Attachment11 Feb 2026View
Natural England09a. Response - Statutory Consultee Attachment16 Feb 2026View
Worcester City Council09a. Response - Statutory Consultee Attachment24 Feb 2026View
Whittington Parish Council09a. Response - Statutory Consultee Attachment26 Feb 2026View
Ecology & Biodiversity Officer09a. Response - Statutory Consultee Attachment2 Mar 2026View
Stoulton Parish Council09a. Response - Statutory Consultee Attachment3 Mar 2026View
Active Travel England09a. Response - Statutory Consultee Attachment4 Mar 2026View
GWR09a. Response - Statutory Consultee Attachment16 Mar 2026View
Conservation Officer09a. Response - Statutory Consultee Attachment20 Mar 2026View
Network Rail09a. Response - Statutory Consultee Attachment23 Mar 2026View
Historic England09a. Response - Statutory Consultee Attachment9 Apr 2026View
WCC - Highways09a. Response - Statutory Consultee Attachment11 Aug 2026View
Economic Development Officer09a. Response - Statutory Consultee Attachment13 Aug 2026View
WCC LLFA Planning Consultation09a. Response - Statutory Consultee Attachment25 Aug 2026View
National Highways09a. Response - Statutory Consultee Attachment14 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.