Council planning record

North Lonsdale RDC TPO No 4 1970 - A1- Sycamore, Rowan, Cherry, Ash and Holly Trees. As part of the water mains rehabilitation works on behalf of United Utilities, we require to renew 2.5km of water mains (4'' PV). On this location, we will require to Open Cut (open excavations) about 30m after the existing bridge towards Cumbria Way on carriageway in order to install the new water main and fittings. We will abandon the existing water main (existing patches shown on the carriageway, about position of existing water main). We will use mechanical digging as preference, however on this location, we can use hand digging and VacEx to not damage any tree roots. Reinstatement as per found once works are completed. No expectation to trim/ felling/ remove any tree. Taking as reference three trees stems, we have a min RPA radius of 22.8m, 12m and 15m, therefore we will be working within the RPA radius.

Junction B5281 with Cumbria Way ULVERSTON LA12 7PH

DeterminedReference: 2026/0680/TPOWestmorland and Furness Council

Last published check: 24 Oct 2026, 19:00. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Determined
Application type
Tree Preservation Order
Received
31 Mar 2026
Validated
31 Mar 2026
Determination deadline
Not published
Local authority
Westmorland and Furness Council

Application overview

North Lonsdale RDC TPO No 4 1970 - A1- Sycamore, Rowan, Cherry, Ash and Holly Trees. As part of the water mains rehabilitation works on behalf of United Utilities, we require to renew 2.5km of water mains (4'' PV). On this location, we will require to Open Cut (open excavations) about 30m after the existing bridge towards Cumbria Way on carriageway in order to install the new water main and fittings. We will abandon the existing water main (existing patches shown on the carriageway, about position of existing water main). We will use mechanical digging as preference, however on this location, we can use hand digging and VacEx to not damage any tree roots. Reinstatement as per found once works are completed. No expectation to trim/ felling/ remove any tree. Taking as reference three trees stems, we have a min RPA radius of 22.8m, 12m and 15m, therefore we will be working within the RPA radius.

Proposal details

Reference
2026/0680/TPO
Ward
High Furness
Parish
Osmotherley
Agent
Misa Sandra Fornas, Mgroup Water

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Junction B5281 with Cumbria Way ULVERSTON LA12 7PH

This record has no verified map location.

Documents 12 of 12

DocumentPublishedAction
Application Form - Without Personal DataApplication Form No Personal Data31 Mar 2026View
Mains Renewal Year 2Proposed Plan31 Mar 2026View
Existing Tree (1)Photograph31 Mar 2026View
Existing Tree - Measurement (1)Photograph31 Mar 2026View
Existing Tree - TrunkPhotograph31 Mar 2026View
Existing Tree - Measurement (2)Photograph31 Mar 2026View
Existing Tree (2)Photograph31 Mar 2026View
Existing Tree - Measurement (3)Photograph31 Mar 2026View
Existing street scenePhotograph31 Mar 2026View
Proposed block sitePhotograph31 Mar 2026View
Delegated ReportDelegated Report15 May 2026View
Decision NoticeDecision Notice15 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Determined
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.