Council planning record

Installation of 2 x Electric Vehicle charging bays with associated equipment

The Peartree Hollybush Lane Welwyn Garden City AL7 4JJ

Decided - GrantedReference: 6/2023/0453/FULLWelwyn Hatfield Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Advert Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Public Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided - Granted
Application type
FULL PERMISSION
Received
27 Feb 2023
Validated
31 Mar 2023
Determination deadline
Not published
Local authority
Welwyn Hatfield Borough Council

Application overview

Installation of 2 x Electric Vehicle charging bays with associated equipment

Proposal details

Reference
6/2023/0453/FULL
Agent
InstaVolt

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The Peartree Hollybush Lane Welwyn Garden City AL7 4JJ

This record has no verified map location.

Documents 14 of 14

DocumentPublishedAction
Description: ApplicationformredactedApplicationFormRedacted.pdf (357 kb)Not publishedView
Description: Existing Block Plan10608 - 0001_03 Block Plan_RevB.pdf (123 kb)Not publishedView
Description: Location Plan10608 - 0001_02 Location Plan_RevB.pdf (143 kb)Not publishedView
Description: Equipment Elevations - RMC 1600 - With Roots001_08-02 Equipment Elevations - (1_50 Scale) Ritherdon RMC 1600 - With roots_RevH.pdf (136 kb)Not publishedView
Description: Equipment Elevations - BYD 120kW Charger001_19 Equipment Elevations - (1_50 Scale) BYD 120kW Charger_RevB.pdf (200 kb)Not publishedView
Description: Proposed Planning Site Layout10608 - 0001_01-PL Planning Site Layout_RevB.pdf (174 kb)Not publishedView
Description: Existing Site Plan10608 - 0001_10 Existing Site Plan_RevA.pdf (142 kb)Not publishedView
Description: Comment - HCC HighwaysResponse_6-2023-0453-FULL.pdf (76 kb)Not publishedView
Description: Conditional response - WHBC - Public Health and Protection - commentsWK138030 - Peartree Inn.pdf (69 kb)Not publishedView
Description: Conditional response - WHBC - Public Health and ProtectionComments.pdf (75 kb)Not publishedView
Description: Decision Notice PDFDecision Notice_620230453FULL.pdf (536 kb)Not publishedView
Description: Delegated ReportDelegated Report_620230453FULL(1).pdf (27 kb)Not publishedView
Description: Site NoticeSite Notice_620230453FULL.pdf (87 kb)Not publishedView
Description: Technical Specification120kw 200A DC charger specification_ air cooled.pdf (353 kb)Not publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decided - Granted
Description: Decision Notice PDF
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.