Section 73 application to vary conditions 2 (approved plans and details), 3a (remediation strategy), 4a (drainage plans for the disposal of foul and surface water flows), 5a (landscaping scheme), 6a (Remediation Statement), 7a (Construction Environmental Management Statement), 8a and b (air quality low emission scheme and validation statement), 11a (engineering details outlining highway infrastructure works), 12a (external lighting), 13a (details of tower crane(s)), 15 (access roads, turning areas and parking facilities), 16 (cycle shelter facility), 22 (facing, roofing materials) and 23 (Proposed Fencing Plan) of planning permission reference 19/1172 (as amended by 23/1258) to introduce a second access junction off Fryers Road, to facilitate and formalise the series of approved non-material amendments and to amend other conditions to either reflect the details approved through the discharge of conditions or update other conditions so they also reflect the replacement plans.

LAND OFF FRYERS ROAD, BLOXWICH, WALSALL

Decision IssuedReference: 23/1551Walsall Metropolitan Borough Council

Last published check: 3 Oct 2026, 18:01. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Decision Date

    Published milestoneCouncil source
  3. Target Date for Decision

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decision Issued
Application type
Section 73: Removal or Variation of Conditions
Received
Not published
Validated
11 Dec 2023
Determination deadline
11 Mar 2024
Local authority
Walsall Metropolitan Borough Council

Application overview

Section 73 application to vary conditions 2 (approved plans and details), 3a (remediation strategy), 4a (drainage plans for the disposal of foul and surface water flows), 5a (landscaping scheme), 6a (Remediation Statement), 7a (Construction Environmental Management Statement), 8a and b (air quality low emission scheme and validation statement), 11a (engineering details outlining highway infrastructure works), 12a (external lighting), 13a (details of tower crane(s)), 15 (access roads, turning areas and parking facilities), 16 (cycle shelter facility), 22 (facing, roofing materials) and 23 (Proposed Fencing Plan) of planning permission reference 19/1172 (as amended by 23/1258) to introduce a second access junction off Fryers Road, to facilitate and formalise the series of approved non-material amendments and to amend other conditions to either reflect the details approved through the discharge of conditions or update other conditions so they also reflect the replacement plans.

Proposal details

Reference
23/1551

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND OFF FRYERS ROAD, BLOXWICH, WALSALL

This record has no verified map location.

Documents 194 of 194

DocumentPublishedAction
01_Introduction_and_Background_11-12-23.pdfCouncil documentNot publishedView
03_Alternatives_Considered_11-12-23.pdfCouncil documentNot publishedView
04_Scheme_Description_and_Construction_Methods_11-12-23.pdfCouncil documentNot publishedView
05_Landscape_and_Visual_11-12-23.pdfCouncil documentNot publishedView
06_Noise_11-12-23_redacted.pdfCouncil documentNot publishedView
07_Air_Quality_and_Human_Health_11-12-23.pdfCouncil documentNot publishedView
09_Ground_Conditions_and_Contamination_11-12-23.pdfCouncil documentNot publishedView
10_Surface_Waters_and_Flood_Risk_11-12-23.pdfCouncil documentNot publishedView
11_Cultural_Heritage_11-12-23.pdfCouncil documentNot publishedView
12_Transport_11-12-23.pdfCouncil documentNot publishedView
14_Summary_of_Effects_11-12-23.pdfCouncil documentNot publishedView
232002-DC-XX-XX-GA-C-0301-P04_Proposed_Drainage_Layout_11-12-23.pdfCouncil documentNot publishedView
232002-DC-XX-XX-GA-C-821-P01_Existing_Layout_11-12-23.pdfCouncil documentNot publishedView
232002-DC-XX-XX-GA-C-822-P01_Site_Clearance_(New_Scheme)_11-12-23.pdfCouncil documentNot publishedView
232002-DC-XX-XX-GA-C-823-P01_Proposed_Access_Layout_(New_Scheme)_11-12-23.pdfCouncil documentNot publishedView
232002-DC-XX-XX-GA-C-824-P01_Vehicle_Swept_Path_Analysis_(New_Scheme)_11-12-23.pdfCouncil documentNot publishedView
232002-DC-XX-XX-GA-C-825-P01_Hardstanding_Construction_Details_(New_Scheme)_11-12-23.pdfCouncil documentNot publishedView
2461-01_Walsall_Facility_S73-_Cover_Letter_11-12-23.pdfCouncil documentNot publishedView
2461-01-05_Landscape_GA_RevE_Sheet_1-11-12-23.pdfCouncil documentNot publishedView
2461-01-06_Landscape_GA_RevE_Sheet_2-11-12-23.pdfCouncil documentNot publishedView
2461-01-07_Soling_Plan_Sheet_1_Rev.D_11-12-23.pdfCouncil documentNot publishedView
2461-01-08_Soling_Plan_Sheet_2_Rev.D__11-12-23.pdfCouncil documentNot publishedView
Ammonia_Hydroxide_Tank_Plan_and_Elevations_LH020-WA-51007951_0.0_-11-12-23.pdfCouncil documentNot publishedView
Appendix_10-1_Flood_Risk_Assessment_(2013)_11-12-23.pdfCouncil documentNot publishedView
Appendix_10-2_Drainage_Strategy_Statement_(2015)_11-12-23.pdfCouncil documentNot publishedView
Appendix_11-1_Listed_Buildings_and_Scheduled_Monuments_11-12-23.pdfCouncil documentNot publishedView
Appendix_12-1_Transport_Assessment_2019_11-12-23.pdfCouncil documentNot publishedView
Appendix_12-2_Transport_Assessment_2013_11-12-23.pdfCouncil documentNot publishedView
Appendix_2-1_Cumulative_Effects_Letter_and_Email_Confirmation_11-12-23.pdfCouncil documentNot publishedView
Appendix_3-1_Design_Statement_11-12-23.pdfCouncil documentNot publishedView
Appendix_4-1_R1_Calculation_11-12-23.pdfCouncil documentNot publishedView
Appendix_5-1_LVIA_Methodology_Final_11-12-23.pdfCouncil documentNot publishedView
Appendix_5-2_Visualisation_Methodology_Final_11-12-23.pdfCouncil documentNot publishedView
Appendix_5-3_Effects_on_Character_Final_11-12-23.pdfCouncil documentNot publishedView
Appendix_5-4_Effects_on_Viewpoints_Final_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-1_Noise_Technical_Terms_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-2_Noise_Instrumentation_and_Survey_Details_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-3_Background_Sound_Survey_Results_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-4_Construction_Plant_Inventory_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-5_Assumed_Noise_Levels_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-6_Noise_Mapping__11-12-23.pdfCouncil documentNot publishedView
Appendix_6-7_VIibration_Technical_Terms_11-12-23.pdfCouncil documentNot publishedView
Appendix_6-8_Vibration_Monitoring_Details_11-12-23.pdfCouncil documentNot publishedView
Appendix_7-2_Construction_Phase_Assessment_Methodology_11-12-23.pdfCouncil documentNot publishedView
Appendix_7-3_Emissions_Modelling_11-12-23.pdfCouncil documentNot publishedView
Appendix_7-4_Human_Health_Risk_Assessment_11-12-23.pdfCouncil documentNot publishedView
Appendix_8-1_Preliminary_Ecological_Appraisal_V1_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-1_Planning_Permission_15-1156_Condition_3_Extract_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-10_EA_Confirmation_of_Surrender_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_1_of_11_1-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_10_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_11_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_2_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_3_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_4_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_5_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_7_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_8_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-2_Hydrock_Geoenvironmental_Ground_Investigation_-_Aug_2015_Part_9_of_11_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_1_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_3_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_4_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_5_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_6_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_7_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-3_Hydrock_Geotechnical_Ground_Investigation_-_Sept_2015_Part_8_of_8_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-4_Hydrock_Remediation_Statement_-_July_2016_Part_1_of_2_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-4_Hydrock_Remediation_Statement_-_July_2016_Part_2_of_2-11-12-23.pdfCouncil documentNot publishedView
Appendix_9-5_Hydrock_Earthworks_and_Remediation_Strategy_Overview_-_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-6_Hydrock_Water_Quality_and_Level_and_Gas_Monitoring_Update_Report_-_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-7_Hydrock_Water_Quality_and_Level_and_Gas_Monitoring_Update_Report_-_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-8_Fichtner_Memorandum_Site_Investigation_Appraisal_-_11-12-23.pdfCouncil documentNot publishedView
Appendix_9-9_Hydrock_Water_Quality_and_Level_and_Gas_Monitoring_Update_Report_-_11-12-23.pdfCouncil documentNot publishedView
Application_Form__11-12-23.pdfCouncil documentNot publishedView
DLD-WSPE-50177824_4.0_External_Lighting_Layout_Drawing_11-12-23.pdfCouncil documentNot publishedView
Ecology_and_Nature_11-12-23.pdfCouncil documentNot publishedView
Environmental_Statement_11-12-23.pdfCouncil documentNot publishedView
ES_Vol_2_Figures_Front_Cover_and_Flysheets_11-12-23.pdfCouncil documentNot publishedView
ES_Vol_3_Technical_Appendices_Front_Cover_and_Flysheets_11-12-23.pdfCouncil documentNot publishedView
ES_Vol_4_Non-Technical_Summary_11-12-23.pdfCouncil documentNot publishedView
Fencing_Details_LH020-WA-51007985_0.0__11-12-23.pdfCouncil documentNot publishedView
Figure_1.1_Site_Location_Plan_11-12-23.pdfCouncil documentNot publishedView
Figure_11.1_Designated_Heritage_Assets_11-12-23.pdfCouncil documentNot publishedView
Figure_2.1_Cumulative_Schemes_11-12-23.pdfCouncil documentNot publishedView
Figure_4.1_Proposed_Site_Layout_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_4.10_South_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_4.11_West_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_4.12_Proposed_Site_Sections_11-12-23.pdfCouncil documentNot publishedView
Figure_4.13_Proposed_Finished_Levels_11-12-23.pdfCouncil documentNot publishedView
Figure_4.14_Preliminary_Surface_Water_Drainage_Design_11-12-23.pdfCouncil documentNot publishedView
Figure_4.15_Indicative_EfW_Process_Diagram_11-12-23.pdfCouncil documentNot publishedView
Figure_4.2_Proposed_North_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_4.3_Proposed_East_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_4.4_Proposed_South_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_4.5_Proposed_West_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_4.6_Proposed_Site_Layout_11-12-23.pdfCouncil documentNot publishedView
Figure_4.7_Ground_Floor_Plan_11-12-23.pdfCouncil documentNot publishedView
Figure_4.8_North_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_4.9_East_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_5.1_Landscape_and_Visual_Context_11-12-23.pdfCouncil documentNot publishedView
Figure_5.2a_ZTV_and_Viewpoint_Locations_11-12-23.pdfCouncil documentNot publishedView
Figure_5.2b_Viewpoint_Locations_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3a_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3b_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3c_i_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3c_ii_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3d_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3e_i_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3e_ii_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3f_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3g_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3h_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3i_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3j_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3k_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3L_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3m_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3n_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3o_11-12-23.pdfCouncil documentNot publishedView
Figure_5.3p_11-12-23.pdfCouncil documentNot publishedView
Figure_5.4a_VP2_Fryers_Road_11-12-23.pdfCouncil documentNot publishedView
Figure_5.4b_VP5_Canal_overbridge_Willenhall_Lane_11-12-23.pdfCouncil documentNot publishedView
Figure_5.4c_VP7_Canal_towpath_adj_to_Sneyd_footbridge_11-12-23.pdfCouncil documentNot publishedView
Figure_5.4d_VP15_Odell_Way_Playing_Fields_11-12-23.pdfCouncil documentNot publishedView
Figure_5.4e_VP16_Oily_Goughs_11-12-23.pdfCouncil documentNot publishedView
Figure_5.5_Illustrative_Landscape_Design_11-12-23.pdfCouncil documentNot publishedView
Figure_6.1_Baseline_Sound_Monitoring_and_Receptor_Positions_11-12-23.pdfCouncil documentNot publishedView
Figure_7.1_Construction_Site_Screening_Zones_11-12-23.pdfCouncil documentNot publishedView
Figure_7.10_Annual_Mean_VOC_1_3_Butadiene_11-12-23.pdfCouncil documentNot publishedView
Figure_7.11_Annual_Mean_Cadmium_Typical_11-12-23.pdfCouncil documentNot publishedView
Figure_7.12_Plume_Visibilty_11-12-23.pdfCouncil documentNot publishedView
Figure_7.2_Human_Sensitive_Receptors_11-12-23.pdfCouncil documentNot publishedView
Figure_7.3_Ecological_Sensitive_Receptors_11-12-23.pdfCouncil documentNot publishedView
Figure_7.4_Modelling_Domain_11-12-23.pdfCouncil documentNot publishedView
Figure_7.5_Wind_Roses_11-12-23.pdfCouncil documentNot publishedView
Figure_7.6_Buildings_Modelled_Proposed_Development_11-12-23.pdfCouncil documentNot publishedView
Figure_7.7_Building_Modelled11-12-23.pdfCouncil documentNot publishedView
Figure_7.8_Annual_Mean_Nitrogen_Dioxide_11-12-23.pdfCouncil documentNot publishedView
Figure_7.9_Annual_Mean_VOC_Benzene_11-12-23.pdfCouncil documentNot publishedView
Figure_8.1a_Natura_2000_Sites-11-12-23.pdfCouncil documentNot publishedView
Figure_8.1b_Statutory_Designated_Sites_11-12-23.pdfCouncil documentNot publishedView
Figure_A1.1_Site_Location_Plan_11-12-23.pdfCouncil documentNot publishedView
Figure_A4_-5B_Architetural_Viual_Two_11-12-23.pdfCouncil documentNot publishedView
Figure_A4_2C_Soiling_Plan_Sheet_-1-11-12-23.pdfCouncil documentNot publishedView
Figure_A4.1_Proposed_Access_Layout-11-12-23.pdfCouncil documentNot publishedView
Figure_A4.2a_Illustrative_Landscape_Plan_-_Sheet_1-11-12-23.pdfCouncil documentNot publishedView
Figure_A4.2b_Illustrative_Landscape_Plan_-_Sheet_2-11-12-23.pdfCouncil documentNot publishedView
Figure_A4.2d_Soiling_Plan_-_Sheet_2-11-12-23.pdfCouncil documentNot publishedView
Figure_A4.3_Drainage_Layout_11-12-23.pdfCouncil documentNot publishedView
Figure_A4.4_Lighting_Layout_11-12-23.pdfCouncil documentNot publishedView
Figure_A4.5a_Architectural_Visualisations_One_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.1_Site_Location_Plan_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.2a_Proposed_Site_Layout_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.2b_Proposed_North_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.2c_Proposed_East_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.2d_Proposed_South_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.2e_Proposed_West_Elevation_(Approved_v_Proposed)_Overlay_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.3_Site_Layout_Plan_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.4a_North_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.4b_East_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.4d_West_Elevation_11-12-23.pdfCouncil documentNot publishedView
Figure_NTS_1.5_Energy_from_Waste_Process_Flow_Diagram_11-12-23.pdfCouncil documentNot publishedView
Fire_Water_Tank_Plans_and_Elevations_LH020-WA-51007930_0.0-11-12-23.pdfCouncil documentNot publishedView
Fuel_Oil_Tank_Plans_and_Elevations_LH020-WA-51007950_0.0_-11-12-23.pdfCouncil documentNot publishedView
Gatehouse_Buildings_Plans_and_Elevations_LH020-WA-51007910_0.0-11-12-23.pdfCouncil documentNot publishedView
HGV_Swept_Paths_LH020-WA-53007125_0.0_-11-12-23.pdfCouncil documentNot publishedView
Main_Building_East_Elevation_LH020-WA-51007131_0.0-11-12-23.pdfCouncil documentNot publishedView
Main_Building_Ground_Floor_Plan_LH020-WA-51007110_0.0-11-12-23.pdfCouncil documentNot publishedView
Main_Building_North_Elevation_LH020-WA-51007130_0.0-11-12-23.pdfCouncil documentNot publishedView
Main_Building_Roof_Plan_LH020-WA-51007115_0.0-11-12-23.pdfCouncil documentNot publishedView
Main_Building_South_Elevation_LH020-WA-51007132.0_0._-11-12-23.pdfCouncil documentNot publishedView
Main_Building_West_Elevation_LH020-WA-51007133_0.0_11-12-23.pdfCouncil documentNot publishedView
Methodology_11-12-23.pdfCouncil documentNot publishedView
Office_and_Admin_Floor_Plans_LH020-WA-51007120_0.0_11-12-23.pdfCouncil documentNot publishedView
Proposed_Fencing_Plan-LH020-WA-53007980_0.0-11-12-23.pdfCouncil documentNot publishedView
Proposed_Finished_Levels_LH020-WA-53007150_0.0_-11-12-23.pdfCouncil documentNot publishedView
Proposed_Site_Plan_LH020-WA-53007100_0.0-11-12-23.pdfCouncil documentNot publishedView
Proposed_Site_Sections_LH020-WA-53007140_0.0_-11-12-23.pdfCouncil documentNot publishedView
Pump_House_Plans_and_Elevations_LH020-WA-51007935_0.0-11-12-23.pdfCouncil documentNot publishedView
South_Elevation_Figure_NTS_1.4c_11-12-23.pdfCouncil documentNot publishedView
Transformer_and_Substation_Plan_and_Elevations_LH020-WA-51007940_0.0-11-12-23.pdfCouncil documentNot publishedView
Walsall_ES_Volume_5_-_Final_-11-12-23.pdfCouncil documentNot publishedView
Network_Rail_-_4-1-24.pdfCouncil documentNot publishedView
Public_Lighting_09-01-24.pdfCouncil documentNot publishedView
HSE_Response_23-1551_Rec_08-01-24.pdfCouncil documentNot publishedView
Highways_12-01-24.pdfCouncil documentNot publishedView
Amended_Email_-_08-01-24.pdfCouncil documentNot publishedView
Structures_15-01-24.pdfCouncil documentNot publishedView
Coal_Comments_-_18-01-24.pdfCouncil documentNot publishedView
Canal_and_River_Trust_25-01-24.pdfCouncil documentNot publishedView
LLFA_31-01-24.pdfCouncil documentNot publishedView
Severn_Trent_Water_29-01-24.pdfCouncil documentNot publishedView
Environment_Agency_Response_23-1551_rec24-01-24_.pdfCouncil documentNot publishedView
Dec-Withdrawn_669.pdfCouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Withdrawn Full Valid Application
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.