Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
R24, Land east of Road 8, Rutherford Appleton Laboratory, Chilton, Harwell Campus, OX11 0QX
Last published check: 23 Oct 2026, 08:27. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Proposed installation of three chemical waste storage containers, permeable block paving and asphalt surfacing for the rearrangement of four existing skips, an upgraded 2.4 m high v-mesh welded mesh fencing and vehicular and pedestrian gates and the installation of three CCTV cameras on the existing Building R24 and external lighting units, for the provision of a chemical waste store.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsR24, Land east of Road 8, Rutherford Appleton Laboratory, Chilton, Harwell Campus, OX11 0QX
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Application Form (Dated 17-09-2025)Application Form | Not published | View |
| Block Plan - 156531-STL-GA-XX-DR-L-17401 S3 36General Plan | Not published | View |
| Existing Site Plan - 156531-STL-GA-XX-DR-L-17403 REV S3 P37General Plan | Not published | View |
| Denios Container Elevations Sheet 2 - 156531-STL-GA-XX-DR-L-17602 S3 P36General Plan | Not published | View |
| Denios Container Elevations Sheet 1 - 156531-STL-GA-XX-DR-L-17601-R131 S3 P36General Plan | Not published | View |
| Site Location Plan - 156531-STL-XX-XX-DR-L-17400 S3 P36General Plan | Not published | View |
| Site Location Plan - 156531-STL-XX-XX-DR-L-17400 S3 P36(1)General Plan | Not published | View |
| Denios Container WHS 16s LM2 ISO 60 Equipment Details Plan - 10000193038 00General Plan | Not published | View |
| Denios Container WHS 11s LR2 ISO 60 Equipment Details Plan - 10000192795 00General Plan | Not published | View |
| Denios Container WFP-X 14 LM2 Equipment Details Plan - 10000001974 00General Plan | Not published | View |
| 16T Rigid Vehicle Vehicle Tracking Plan - 31634-0200-ZZ-00-DR-C-700-9200 P02General Plan | Not published | View |
| Low-impact Ecological Impact Assessment - 17192 R02c VKCSupporting documentation | Not published | View |
| Denios Container Chemical Waste Segregation DetailsSupporting documentation | Not published | View |
| Design & Access Statement - 156531-STL-XX-RP-L-RP051 P36(1)Supporting documentation | Not published | View |
| Covering Letter (Dated 17-09-2025)Supporting documentation | Not published | View |
| Consultation Response - OCC Archaeology (06-10-2025)Supporting documentation | Not published | View |
| M&W ADVERT MW.0093-25Supporting documentation | Not published | View |
| EIA Screening Form(1)Supporting documentation | Not published | View |
| M&W AGENTS LETTER MW.0093-25(1)Supporting documentation | Not published | View |
| Consultation Response - OCC Tree Officer (06-10-2025)Supporting documentation | Not published | View |
| Tree Survey Data and TCP (December 2024)Supporting documentation | Not published | View |
| Departure Form(1)Supporting documentation | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.