Council planning record

-Demolition and replacement of Kennington rail bridge, including single span over the railway lines and culverts for Hinksey Stream East and West; - An eastbound all-traffic lane for left-turning vehicles from the A34 Hinksey Hill Interchange to Old Abingdon Road; - An eastbound lane from Old Abingdon Road to Redbridge Park and Ride, for use by buses and users of Redbridge Park and Ride; - Capacity improvements at Kennington road bridge to enable the proposed eastbound Park and Ride lane to extend over the road bridge and upgrade of the existing parapets on both sides; - Improved eastbound shared use footway and cycleway between A34 Hinksey Hill Interchange and Red Bridge Hollow on Old Abingdon Road; - Replacement westbound shared use footway and cycleway between Kennington Roundabout and slip road to Kennington Road; - Construction of retaining walls on the A423 to the west of Old Abingdon Road junction, to the west of Kennington road bridge and to the west of Kennington rail bridge; - Utility diversions, sustainable drainage systems, landscaping, external lighting, traffic signals alterations at Kennington Roundabout and traffic signs; - All associated engineering and temporary construction works, site compound and storage areas Consultation End Date: 18 August 2024

A423 Southern Bypass between Hinksey Hill Interchange &, Kennington Roundabout, Oxfordshire

Decision MadeReference: P24/V1547/CMVale of White Horse District Council

Last published check: 19 Oct 2026, 05:12. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Proposal

    Published milestoneCouncil source
  3. Issue Date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Not published
Received
17 Jul 2024
Validated
Not published
Determination deadline
Not published
Local authority
Vale of White Horse District Council

Application overview

-Demolition and replacement of Kennington rail bridge, including single span over the railway lines and culverts for Hinksey Stream East and West; - An eastbound all-traffic lane for left-turning vehicles from the A34 Hinksey Hill Interchange to Old Abingdon Road; - An eastbound lane from Old Abingdon Road to Redbridge Park and Ride, for use by buses and users of Redbridge Park and Ride; - Capacity improvements at Kennington road bridge to enable the proposed eastbound Park and Ride lane to extend over the road bridge and upgrade of the existing parapets on both sides; - Improved eastbound shared use footway and cycleway between A34 Hinksey Hill Interchange and Red Bridge Hollow on Old Abingdon Road; - Replacement westbound shared use footway and cycleway between Kennington Roundabout and slip road to Kennington Road; - Construction of retaining walls on the A423 to the west of Old Abingdon Road junction, to the west of Kennington road bridge and to the west of Kennington rail bridge; - Utility diversions, sustainable drainage systems, landscaping, external lighting, traffic signals alterations at Kennington Roundabout and traffic signs; - All associated engineering and temporary construction works, site compound and storage areas Consultation End Date: 18 August 2024

Proposal details

Reference
P24/V1547/CM
Agent
Miss Annie Taylor

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

A423 Southern Bypass between Hinksey Hill Interchange &, Kennington Roundabout, Oxfordshire

This record has no verified map location.

Documents 162 of 162

DocumentPublishedAction
Application FormApplication FormNot publishedView
Temporary Works Phase 2 Sheet 2 of 3 (330610631-STN-01-PH2-SK-H-0002)General PlanNot publishedView
Site Location Plan A423 Kennington Improvements SchemeGeneral PlanNot publishedView
Proposed Lighting Sheet 2 of 3 (330610631-STN-01-ALL-DR-H-1301)General PlanNot publishedView
General Arrangement Sheet 1 of 3 (330610631-STN-01-ALL-DR-H-0100)General PlanNot publishedView
Temporary Works Phase 1 Sheet 2 of 3 (330610631-STN-01-PH1-SK-H-0002)General PlanNot publishedView
Proposed Drainage Sheet 3 of 3 (330610631-STN-01-ALL-DR-D-0505)General PlanNot publishedView
Profile drawing guide 2020 V2General PlanNot publishedView
Profile drawing guide 2020 V2(1)General PlanNot publishedView
Kennington Railway Bridge Proposed Structure General Arrangement Sheet 1 of 2General PlanNot publishedView
6. IMSE500177-CH2-XX-00-RP-HY-0111 OptimizedGeneral PlanNot publishedView
Temporary Works Phase 2 Sheet 3 of 3 (330610631-STN-01-PH2-SK-H-0003)General PlanNot publishedView
Kennington Road Bridge Existing StructureGeneral PlanNot publishedView
Horizontal Alignment Sheet 3 of 3 (330610631-STN-00-ALL-SK-H-0003)General PlanNot publishedView
Horizontal Alignment Sheet 1 of 3 (330610631-STN-00-ALL-SK-H-0001)General PlanNot publishedView
Temporary Works Phase 1 Sheet 1 of 3 (330610631-STN-01-PH1-SK-H-0001)General PlanNot publishedView
Kennington Railway Bridge Proposed Structure General Arrangement Sheet 2 of 2General PlanNot publishedView
8. Site Location Plan 20 09 23General PlanNot publishedView
Swept Path Analysis Sheet 1 of 3 (330610631-STN-01-ALL-DR-H-0030)General PlanNot publishedView
Proposed Drainage Sheet 2 of 3 (330610631-STN-01-ALL-DR-D-0504)General PlanNot publishedView
Proposed Cross Sections (330610631-STN-01-ALL-DR-H-0151)General PlanNot publishedView
Long Section (330610631-STN-01-ALL-DR-H-0140)General PlanNot publishedView
Temporary Works Phase 2 Sheet 1 of 3 (330610631-STN-01-PH2-SK-H-0001)General PlanNot publishedView
Swept Path Analysis Sheet 2 of 3 (330610631-STN-01-ALL-DR-H-0031)General PlanNot publishedView
Retaining Wall 2 - Proposed Plans Sections and Elevations 330610631-STN-01-ALL-DR-S-1602General PlanNot publishedView
Proposed Drainage Sheet 1 of 3 (330610631-STN-01-ALL-DR-D-0503)General PlanNot publishedView
Kennington Road Bridge Proposed Structure General ArrangementGeneral PlanNot publishedView
General Arrangement Sheet 3 of 3 (330610631-STN-01-ALL-DR-H-0102)General PlanNot publishedView
Temporary Works Phase 1 Sheet 3 of 3 (330610631-STN-01-PH1-SK-H-0003)General PlanNot publishedView
Swept Path Analysis Sheet 3 of 3 (330610631-STN-01-ALL-DR-H-0032)General PlanNot publishedView
Retaining Wall 1 - Proposed Plans Sections and Elevations 330610631-STN-01-ALL-DR-S-1601General PlanNot publishedView
Proposed Lighting Sheet 3 of 3 (330610631-STN-01-ALL-DR-H-1302)General PlanNot publishedView
Kennington Railway Bridge Existing StructureGeneral PlanNot publishedView
Horizontal Alignment Sheet 2 of 3 (330610631-STN-00-ALL-SK-H-0002)General PlanNot publishedView
General Cross Sections (330610631-STN-01-ALL-DR-H-0150)General PlanNot publishedView
Proposed Lighting Sheet 1 of 3 (330610631-STN-01-ALL-DR-H-1300)General PlanNot publishedView
General Arrangement Sheet 2 of 3 (330610631-STN-01-ALL-DR-H-0101)General PlanNot publishedView
TDC response R3.30033.23 Kennington rail bridge 23.11.23Supporting documentationNot publishedView
PRoW Officer CommentsSupporting documentationNot publishedView
Practical microshock Advice- construction(1)Supporting documentationNot publishedView
Letter from AB 20112023 101227.docSupporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 6Supporting documentationNot publishedView
ES Appendix 7.4 GazetteerSupporting documentationNot publishedView
ES Appendix 3.1 General Arrangement DrawingsSupporting documentationNot publishedView
Cycle Ring jpgSupporting documentationNot publishedView
22-11-2023Supporting documentationNot publishedView
20230208 MOD Safeguarding Response SOSASupporting documentationNot publishedView
130276Supporting documentationNot publishedView
1. 230807 June Bat Survey Memo rev A NE (002)Supporting documentationNot publishedView
03-11-2023Supporting documentationNot publishedView
Updated Biodiversity Officer ResponseSupporting documentationNot publishedView
Oxford Times Notice A423 Kennington Improvements SchemeSupporting documentationNot publishedView
Oxford City Council CommentsSupporting documentationNot publishedView
Natural England Revised Comments(1)Supporting documentationNot publishedView
National Highways CommentsSupporting documentationNot publishedView
First Iteration Environmental Management Plan A423 Kennington Improvements SchemeSupporting documentationNot publishedView
ES Non Technical Summary A423 Kennington Improvements SchemeSupporting documentationNot publishedView
ES Appendix 7.5 Historic Environment Assessment Part 2Supporting documentationNot publishedView
ES Appendix 7.3 Enviro Check Assessment Part 2Supporting documentationNot publishedView
ES Appendix 6.1 - 6.8 Air Quality AppendicesSupporting documentationNot publishedView
ES Appendix 13.1 Flood Risk Assessment Appendix B C and DSupporting documentationNot publishedView
Biodiversity Officer CommentsSupporting documentationNot publishedView
4TE019-020Supporting documentationNot publishedView
4TE019-020(1)Supporting documentationNot publishedView
Transport Assessment Appendix BSupporting documentationNot publishedView
Statement of Community Engagement Final A423 Kennington Improvements SchemeSupporting documentationNot publishedView
R3 ADVERT REG 25 R3.0033-23Supporting documentationNot publishedView
Planning Design and Access StatementSupporting documentationNot publishedView
Network Rail CommentsSupporting documentationNot publishedView
Mr Robin Tucker Comment 02-04-2023-Redacted Stantec ResponseSupporting documentationNot publishedView
ES Appendix 9.2 Ecological Baseline ReportSupporting documentationNot publishedView
ES Appendix 8.3 Schedule of Landscape EffectsSupporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 7Supporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 4Supporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 3Supporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 1Supporting documentationNot publishedView
ES Appendix 7.5 Historic Environment Assessment Part 1Supporting documentationNot publishedView
ES Appendix 7.1 Cultural Heritage FiguresSupporting documentationNot publishedView
ES Appendix 15.2 Construction Phase Atkins VISSIM ReportSupporting documentationNot publishedView
ES Appendix 13.2 Surface Water Management Strategy Part 1Supporting documentationNot publishedView
ES Appendix 11.1 - 11.7 Noise and Vibration AppendicesSupporting documentationNot publishedView
Environmental Masterplan A423 Kennington Improvements SchemeSupporting documentationNot publishedView
16-11-2023Supporting documentationNot publishedView
Transport Assessment Appendix DSupporting documentationNot publishedView
TGN 287 Third party guidance for working near NGET equipmentSupporting documentationNot publishedView
R3003323 Comments Natural England 16.11.23Supporting documentationNot publishedView
R3.003323 A423 Kennington Reg 25 Response Letter(1)Supporting documentationNot publishedView
Mr Robin Tucker Comment 02-04-2023-RedactedSupporting documentationNot publishedView
LLFA ResponseSupporting documentationNot publishedView
ES Appendix 7.2 Ground Investigation Report Part 2Supporting documentationNot publishedView
ES Appendix 7.2 Ground Investigation Report Part 1Supporting documentationNot publishedView
ES Appendix 1.1 Statement of ExpertiseSupporting documentationNot publishedView
Circular Economy Plan A423 Kennington Improvements SchemeSupporting documentationNot publishedView
070623 Conditioned NHPR R3.0033 23Supporting documentationNot publishedView
Transport Assessment Appendix ESupporting documentationNot publishedView
Transport Assessment Appendix CSupporting documentationNot publishedView
R3.003323 Comments National GridSupporting documentationNot publishedView
R3.003323 Comments Cllr Johnston 22.11.23Supporting documentationNot publishedView
R3.003323 120224 Kennington Rail Bridge Biodiversity Response R3.003323 further informationSupporting documentationNot publishedView
Landscape Officer CommentsSupporting documentationNot publishedView
Kennington Bridge - Reg 25 Further info request Additional Letter Jul23 FinalSupporting documentationNot publishedView
ES Appendix 8.2 LVIA MethodologySupporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 5Supporting documentationNot publishedView
ES Appendix 8.1 Landscape Figures Part 2Supporting documentationNot publishedView
ES Appendix 7.3 Enviro Check Assessment Part 1Supporting documentationNot publishedView
ES Appendix 4.1 - 4.3 Assessment Methodology AppendicesSupporting documentationNot publishedView
ES Appendix 15.5 WCHARSupporting documentationNot publishedView
ES Appendix 15.1 ES ScopeSupporting documentationNot publishedView
ES Appendix 13.2 Surface Water Management Strategy Part 3Supporting documentationNot publishedView
ES Appendix 13.1 Flood Risk AssessmentSupporting documentationNot publishedView
Copy of Kennington 11.01.24 Biodiversity Metric 4.0 Calculation Tool with updated river metricSupporting documentationNot publishedView
Climate Change Impact Assessment A423 Kennington Improvements SchemeSupporting documentationNot publishedView
BBOWT CommentsSupporting documentationNot publishedView
Transport Assessment Appendix GSupporting documentationNot publishedView
Transport Assessment Appendix ASupporting documentationNot publishedView
TGN 287 Third party guidance for working near NGET equipment(1)Supporting documentationNot publishedView
R300323 Biodiversity Response further information 15112023Supporting documentationNot publishedView
Kennington Notice 1Supporting documentationNot publishedView
ES Appendix 9.4 Biodiversity Net Gain AssessmentSupporting documentationNot publishedView
ES Appendix 8.5 Arboricultural Impact AssessmentSupporting documentationNot publishedView
ES Appendix 15.4 Construction CompoundSupporting documentationNot publishedView
ES Appendix 12.1 - 12.4 Population and Human Health AppendicesSupporting documentationNot publishedView
Environmental Statement Volume 1 Main Report A423 Kennington Improvements SchemeSupporting documentationNot publishedView
A423 Kennington Improvements Scheme Rapid Health Impact Assessment ToolSupporting documentationNot publishedView
3. Kennington 0910 Biodiversity Metric 4.0 Calculation Tool - macro-disabled (5)Supporting documentationNot publishedView
Water Framework Directive Assessment A423 Kennington Improvements SchemeSupporting documentationNot publishedView
R3003323 Comments Senior Tree Officer 11.12.23Supporting documentationNot publishedView
Preliminary Ecological Appraisal Report RedactedSupporting documentationNot publishedView
ES Appendix 8.4 Schedule of Visual EffectsSupporting documentationNot publishedView
ES Appendix 13.1 Flood Risk Assessment Appendix ESupporting documentationNot publishedView
ES Appendix 13.1 Flood Risk Assessment Appendix B CSupporting documentationNot publishedView
ES Appendix 13.1 Flood RIsk Assessment Appendix ASupporting documentationNot publishedView
Email from National Grid 25.10.23Supporting documentationNot publishedView
Cyclox CommentsSupporting documentationNot publishedView
Comments from Thames Water R3003323 23.11.23Supporting documentationNot publishedView
Comments Environment Agency 26th January 2024Supporting documentationNot publishedView
Capital Asset Value for Amenity Tree CAVAT Assessment A423 Kennington Improvements SchemeSupporting documentationNot publishedView
BBOWT 2nd response to R3003323 Kennington BridgeSupporting documentationNot publishedView
Archaeologist CommentsSupporting documentationNot publishedView
4. 330610631 Kennington Response to EA RMF FINAL 260923Supporting documentationNot publishedView
National Highways Comments May 2023Supporting documentationNot publishedView
Historic England CommentsSupporting documentationNot publishedView
ES Appendix 9.3 Protected Species Surveys 2021 2022Supporting documentationNot publishedView
ES Appendix 9.1 Biodiversity FiguresSupporting documentationNot publishedView
ES Appendix 7.5 Historic Environment Assessment Part 4Supporting documentationNot publishedView
ES Appendix 7.5 Historic Environment Assessment Part 3Supporting documentationNot publishedView
ES Appendix 2.1 FiguresSupporting documentationNot publishedView
ES Appendix 15.3 Operational Phase Atkins VISSIM ReportSupporting documentationNot publishedView
ES Appendix 14 Climate Change AppendicesSupporting documentationNot publishedView
ES Appendix 13.2 Surface Water Management Strategy Part 2Supporting documentationNot publishedView
Covering LetterSupporting documentationNot publishedView
Appendix 9 4 BNG AssessmentSupporting documentationNot publishedView
20231031 MOD Response LetterSupporting documentationNot publishedView
2. Appendix 9 4 BNG AssessmentSupporting documentationNot publishedView
Transport Assessment Main ReportSupporting documentationNot publishedView
Transport Assessment Appendix FSupporting documentationNot publishedView
R3.0033.23 A423 Southern bypass Kennington Landscape 241123Supporting documentationNot publishedView
Practical microshock Advice- constructionSupporting documentationNot publishedView
PL-R3ADVERT R3.0033-23(1)ECRevsSupporting documentationNot publishedView
Natural England CommentsSupporting documentationNot publishedView
Decision Notice Kennington Bridge R3003323DecisionNot publishedView
2024-08-29 Officer Response LetterDecisionNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

County Matter-Approval
Decision Notice Kennington Bridge R3003323 2024-08-29 Officer Response Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.