Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
A423 Southern Bypass between Hinksey Hill Interchange &, Kennington Roundabout, Oxfordshire
Last published check: 19 Oct 2026, 05:12. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
-Demolition and replacement of Kennington rail bridge, including single span over the railway lines and culverts for Hinksey Stream East and West; - An eastbound all-traffic lane for left-turning vehicles from the A34 Hinksey Hill Interchange to Old Abingdon Road; - An eastbound lane from Old Abingdon Road to Redbridge Park and Ride, for use by buses and users of Redbridge Park and Ride; - Capacity improvements at Kennington road bridge to enable the proposed eastbound Park and Ride lane to extend over the road bridge and upgrade of the existing parapets on both sides; - Improved eastbound shared use footway and cycleway between A34 Hinksey Hill Interchange and Red Bridge Hollow on Old Abingdon Road; - Replacement westbound shared use footway and cycleway between Kennington Roundabout and slip road to Kennington Road; - Construction of retaining walls on the A423 to the west of Old Abingdon Road junction, to the west of Kennington road bridge and to the west of Kennington rail bridge; - Utility diversions, sustainable drainage systems, landscaping, external lighting, traffic signals alterations at Kennington Roundabout and traffic signs; - All associated engineering and temporary construction works, site compound and storage areas Consultation End Date: 18 August 2024
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsA423 Southern Bypass between Hinksey Hill Interchange &, Kennington Roundabout, Oxfordshire
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Application FormApplication Form | Not published | View |
| Temporary Works Phase 2 Sheet 2 of 3 (330610631-STN-01-PH2-SK-H-0002)General Plan | Not published | View |
| Site Location Plan A423 Kennington Improvements SchemeGeneral Plan | Not published | View |
| Proposed Lighting Sheet 2 of 3 (330610631-STN-01-ALL-DR-H-1301)General Plan | Not published | View |
| General Arrangement Sheet 1 of 3 (330610631-STN-01-ALL-DR-H-0100)General Plan | Not published | View |
| Temporary Works Phase 1 Sheet 2 of 3 (330610631-STN-01-PH1-SK-H-0002)General Plan | Not published | View |
| Proposed Drainage Sheet 3 of 3 (330610631-STN-01-ALL-DR-D-0505)General Plan | Not published | View |
| Profile drawing guide 2020 V2General Plan | Not published | View |
| Profile drawing guide 2020 V2(1)General Plan | Not published | View |
| Kennington Railway Bridge Proposed Structure General Arrangement Sheet 1 of 2General Plan | Not published | View |
| 6. IMSE500177-CH2-XX-00-RP-HY-0111 OptimizedGeneral Plan | Not published | View |
| Temporary Works Phase 2 Sheet 3 of 3 (330610631-STN-01-PH2-SK-H-0003)General Plan | Not published | View |
| Kennington Road Bridge Existing StructureGeneral Plan | Not published | View |
| Horizontal Alignment Sheet 3 of 3 (330610631-STN-00-ALL-SK-H-0003)General Plan | Not published | View |
| Horizontal Alignment Sheet 1 of 3 (330610631-STN-00-ALL-SK-H-0001)General Plan | Not published | View |
| Temporary Works Phase 1 Sheet 1 of 3 (330610631-STN-01-PH1-SK-H-0001)General Plan | Not published | View |
| Kennington Railway Bridge Proposed Structure General Arrangement Sheet 2 of 2General Plan | Not published | View |
| 8. Site Location Plan 20 09 23General Plan | Not published | View |
| Swept Path Analysis Sheet 1 of 3 (330610631-STN-01-ALL-DR-H-0030)General Plan | Not published | View |
| Proposed Drainage Sheet 2 of 3 (330610631-STN-01-ALL-DR-D-0504)General Plan | Not published | View |
| Proposed Cross Sections (330610631-STN-01-ALL-DR-H-0151)General Plan | Not published | View |
| Long Section (330610631-STN-01-ALL-DR-H-0140)General Plan | Not published | View |
| Temporary Works Phase 2 Sheet 1 of 3 (330610631-STN-01-PH2-SK-H-0001)General Plan | Not published | View |
| Swept Path Analysis Sheet 2 of 3 (330610631-STN-01-ALL-DR-H-0031)General Plan | Not published | View |
| Retaining Wall 2 - Proposed Plans Sections and Elevations 330610631-STN-01-ALL-DR-S-1602General Plan | Not published | View |
| Proposed Drainage Sheet 1 of 3 (330610631-STN-01-ALL-DR-D-0503)General Plan | Not published | View |
| Kennington Road Bridge Proposed Structure General ArrangementGeneral Plan | Not published | View |
| General Arrangement Sheet 3 of 3 (330610631-STN-01-ALL-DR-H-0102)General Plan | Not published | View |
| Temporary Works Phase 1 Sheet 3 of 3 (330610631-STN-01-PH1-SK-H-0003)General Plan | Not published | View |
| Swept Path Analysis Sheet 3 of 3 (330610631-STN-01-ALL-DR-H-0032)General Plan | Not published | View |
| Retaining Wall 1 - Proposed Plans Sections and Elevations 330610631-STN-01-ALL-DR-S-1601General Plan | Not published | View |
| Proposed Lighting Sheet 3 of 3 (330610631-STN-01-ALL-DR-H-1302)General Plan | Not published | View |
| Kennington Railway Bridge Existing StructureGeneral Plan | Not published | View |
| Horizontal Alignment Sheet 2 of 3 (330610631-STN-00-ALL-SK-H-0002)General Plan | Not published | View |
| General Cross Sections (330610631-STN-01-ALL-DR-H-0150)General Plan | Not published | View |
| Proposed Lighting Sheet 1 of 3 (330610631-STN-01-ALL-DR-H-1300)General Plan | Not published | View |
| General Arrangement Sheet 2 of 3 (330610631-STN-01-ALL-DR-H-0101)General Plan | Not published | View |
| TDC response R3.30033.23 Kennington rail bridge 23.11.23Supporting documentation | Not published | View |
| PRoW Officer CommentsSupporting documentation | Not published | View |
| Practical microshock Advice- construction(1)Supporting documentation | Not published | View |
| Letter from AB 20112023 101227.docSupporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 6Supporting documentation | Not published | View |
| ES Appendix 7.4 GazetteerSupporting documentation | Not published | View |
| ES Appendix 3.1 General Arrangement DrawingsSupporting documentation | Not published | View |
| Cycle Ring jpgSupporting documentation | Not published | View |
| 22-11-2023Supporting documentation | Not published | View |
| 20230208 MOD Safeguarding Response SOSASupporting documentation | Not published | View |
| 130276Supporting documentation | Not published | View |
| 1. 230807 June Bat Survey Memo rev A NE (002)Supporting documentation | Not published | View |
| 03-11-2023Supporting documentation | Not published | View |
| Updated Biodiversity Officer ResponseSupporting documentation | Not published | View |
| Oxford Times Notice A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| Oxford City Council CommentsSupporting documentation | Not published | View |
| Natural England Revised Comments(1)Supporting documentation | Not published | View |
| National Highways CommentsSupporting documentation | Not published | View |
| First Iteration Environmental Management Plan A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| ES Non Technical Summary A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| ES Appendix 7.5 Historic Environment Assessment Part 2Supporting documentation | Not published | View |
| ES Appendix 7.3 Enviro Check Assessment Part 2Supporting documentation | Not published | View |
| ES Appendix 6.1 - 6.8 Air Quality AppendicesSupporting documentation | Not published | View |
| ES Appendix 13.1 Flood Risk Assessment Appendix B C and DSupporting documentation | Not published | View |
| Biodiversity Officer CommentsSupporting documentation | Not published | View |
| 4TE019-020Supporting documentation | Not published | View |
| 4TE019-020(1)Supporting documentation | Not published | View |
| Transport Assessment Appendix BSupporting documentation | Not published | View |
| Statement of Community Engagement Final A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| R3 ADVERT REG 25 R3.0033-23Supporting documentation | Not published | View |
| Planning Design and Access StatementSupporting documentation | Not published | View |
| Network Rail CommentsSupporting documentation | Not published | View |
| Mr Robin Tucker Comment 02-04-2023-Redacted Stantec ResponseSupporting documentation | Not published | View |
| ES Appendix 9.2 Ecological Baseline ReportSupporting documentation | Not published | View |
| ES Appendix 8.3 Schedule of Landscape EffectsSupporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 7Supporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 4Supporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 3Supporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 1Supporting documentation | Not published | View |
| ES Appendix 7.5 Historic Environment Assessment Part 1Supporting documentation | Not published | View |
| ES Appendix 7.1 Cultural Heritage FiguresSupporting documentation | Not published | View |
| ES Appendix 15.2 Construction Phase Atkins VISSIM ReportSupporting documentation | Not published | View |
| ES Appendix 13.2 Surface Water Management Strategy Part 1Supporting documentation | Not published | View |
| ES Appendix 11.1 - 11.7 Noise and Vibration AppendicesSupporting documentation | Not published | View |
| Environmental Masterplan A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| 16-11-2023Supporting documentation | Not published | View |
| Transport Assessment Appendix DSupporting documentation | Not published | View |
| TGN 287 Third party guidance for working near NGET equipmentSupporting documentation | Not published | View |
| R3003323 Comments Natural England 16.11.23Supporting documentation | Not published | View |
| R3.003323 A423 Kennington Reg 25 Response Letter(1)Supporting documentation | Not published | View |
| Mr Robin Tucker Comment 02-04-2023-RedactedSupporting documentation | Not published | View |
| LLFA ResponseSupporting documentation | Not published | View |
| ES Appendix 7.2 Ground Investigation Report Part 2Supporting documentation | Not published | View |
| ES Appendix 7.2 Ground Investigation Report Part 1Supporting documentation | Not published | View |
| ES Appendix 1.1 Statement of ExpertiseSupporting documentation | Not published | View |
| Circular Economy Plan A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| 070623 Conditioned NHPR R3.0033 23Supporting documentation | Not published | View |
| Transport Assessment Appendix ESupporting documentation | Not published | View |
| Transport Assessment Appendix CSupporting documentation | Not published | View |
| R3.003323 Comments National GridSupporting documentation | Not published | View |
| R3.003323 Comments Cllr Johnston 22.11.23Supporting documentation | Not published | View |
| R3.003323 120224 Kennington Rail Bridge Biodiversity Response R3.003323 further informationSupporting documentation | Not published | View |
| Landscape Officer CommentsSupporting documentation | Not published | View |
| Kennington Bridge - Reg 25 Further info request Additional Letter Jul23 FinalSupporting documentation | Not published | View |
| ES Appendix 8.2 LVIA MethodologySupporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 5Supporting documentation | Not published | View |
| ES Appendix 8.1 Landscape Figures Part 2Supporting documentation | Not published | View |
| ES Appendix 7.3 Enviro Check Assessment Part 1Supporting documentation | Not published | View |
| ES Appendix 4.1 - 4.3 Assessment Methodology AppendicesSupporting documentation | Not published | View |
| ES Appendix 15.5 WCHARSupporting documentation | Not published | View |
| ES Appendix 15.1 ES ScopeSupporting documentation | Not published | View |
| ES Appendix 13.2 Surface Water Management Strategy Part 3Supporting documentation | Not published | View |
| ES Appendix 13.1 Flood Risk AssessmentSupporting documentation | Not published | View |
| Copy of Kennington 11.01.24 Biodiversity Metric 4.0 Calculation Tool with updated river metricSupporting documentation | Not published | View |
| Climate Change Impact Assessment A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| BBOWT CommentsSupporting documentation | Not published | View |
| Transport Assessment Appendix GSupporting documentation | Not published | View |
| Transport Assessment Appendix ASupporting documentation | Not published | View |
| TGN 287 Third party guidance for working near NGET equipment(1)Supporting documentation | Not published | View |
| R300323 Biodiversity Response further information 15112023Supporting documentation | Not published | View |
| Kennington Notice 1Supporting documentation | Not published | View |
| ES Appendix 9.4 Biodiversity Net Gain AssessmentSupporting documentation | Not published | View |
| ES Appendix 8.5 Arboricultural Impact AssessmentSupporting documentation | Not published | View |
| ES Appendix 15.4 Construction CompoundSupporting documentation | Not published | View |
| ES Appendix 12.1 - 12.4 Population and Human Health AppendicesSupporting documentation | Not published | View |
| Environmental Statement Volume 1 Main Report A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| A423 Kennington Improvements Scheme Rapid Health Impact Assessment ToolSupporting documentation | Not published | View |
| 3. Kennington 0910 Biodiversity Metric 4.0 Calculation Tool - macro-disabled (5)Supporting documentation | Not published | View |
| Water Framework Directive Assessment A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| R3003323 Comments Senior Tree Officer 11.12.23Supporting documentation | Not published | View |
| Preliminary Ecological Appraisal Report RedactedSupporting documentation | Not published | View |
| ES Appendix 8.4 Schedule of Visual EffectsSupporting documentation | Not published | View |
| ES Appendix 13.1 Flood Risk Assessment Appendix ESupporting documentation | Not published | View |
| ES Appendix 13.1 Flood Risk Assessment Appendix B CSupporting documentation | Not published | View |
| ES Appendix 13.1 Flood RIsk Assessment Appendix ASupporting documentation | Not published | View |
| Email from National Grid 25.10.23Supporting documentation | Not published | View |
| Cyclox CommentsSupporting documentation | Not published | View |
| Comments from Thames Water R3003323 23.11.23Supporting documentation | Not published | View |
| Comments Environment Agency 26th January 2024Supporting documentation | Not published | View |
| Capital Asset Value for Amenity Tree CAVAT Assessment A423 Kennington Improvements SchemeSupporting documentation | Not published | View |
| BBOWT 2nd response to R3003323 Kennington BridgeSupporting documentation | Not published | View |
| Archaeologist CommentsSupporting documentation | Not published | View |
| 4. 330610631 Kennington Response to EA RMF FINAL 260923Supporting documentation | Not published | View |
| National Highways Comments May 2023Supporting documentation | Not published | View |
| Historic England CommentsSupporting documentation | Not published | View |
| ES Appendix 9.3 Protected Species Surveys 2021 2022Supporting documentation | Not published | View |
| ES Appendix 9.1 Biodiversity FiguresSupporting documentation | Not published | View |
| ES Appendix 7.5 Historic Environment Assessment Part 4Supporting documentation | Not published | View |
| ES Appendix 7.5 Historic Environment Assessment Part 3Supporting documentation | Not published | View |
| ES Appendix 2.1 FiguresSupporting documentation | Not published | View |
| ES Appendix 15.3 Operational Phase Atkins VISSIM ReportSupporting documentation | Not published | View |
| ES Appendix 14 Climate Change AppendicesSupporting documentation | Not published | View |
| ES Appendix 13.2 Surface Water Management Strategy Part 2Supporting documentation | Not published | View |
| Covering LetterSupporting documentation | Not published | View |
| Appendix 9 4 BNG AssessmentSupporting documentation | Not published | View |
| 20231031 MOD Response LetterSupporting documentation | Not published | View |
| 2. Appendix 9 4 BNG AssessmentSupporting documentation | Not published | View |
| Transport Assessment Main ReportSupporting documentation | Not published | View |
| Transport Assessment Appendix FSupporting documentation | Not published | View |
| R3.0033.23 A423 Southern bypass Kennington Landscape 241123Supporting documentation | Not published | View |
| Practical microshock Advice- constructionSupporting documentation | Not published | View |
| PL-R3ADVERT R3.0033-23(1)ECRevsSupporting documentation | Not published | View |
| Natural England CommentsSupporting documentation | Not published | View |
| Decision Notice Kennington Bridge R3003323Decision | Not published | View |
| 2024-08-29 Officer Response LetterDecision | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.